Loading...
02/08/2005 Resolutions 2005-34 I I I RES 0 L UTI 0 N 2005-34 WHEREAS, the Regional Planning Commission, after public notice having been published in one issue of the Grand Island Independent on January 22,2005, and such notice also having been posted in at least three places in areas where it was likely to attract attention, conducted a public hearing on February 2, 2005, on the One and Six Year Street Improvement Program for 2005-2010 for the City of Grand Island; and WHEREAS, at the February 2, 2005 public hearing, the Regional Planning Commission approved the One and Six Year Street Improvement Program 2005-2010, and recommended that such program be approved by the City Council; and WHEREAS, the Grand Island City Council, after public notice having been published in one issue ofthe Grand Island Independent on February 3,2005, and such notice also having been posted in at least three places in areas where it was likely to attract attention, conducted a public hearing on February 8,2005, on the One and Six Year Street Improvement Program for the City of Grand Island; and WHEREAS, this Council has determined that the One and Six Year Street Improvement Program as set out in Exhibit "A" should be adopted. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that the One and Six Year Street Improvement Program 2005-2010, based on priorities of needs and calculated to contribute to the orderly development of city streets, and identified as Exhibit "A", is hereby approved and adopted by this Council. Adopted by the City Council of the City of Grand Island, Nebraska, February 8, 2005. Q~~Oo- m~ RaNae Edwards, City Clerk Approved as to Form Xl I February 3, 2005 Xl City Attorney I 2005 CONSTRUCTION SEASON (ALL COSTS IN $1 ,000's) City State City Cap. Total Federal City G.O. Impr. No. Project Description Project Other STP Bond Fund Street Construction M310- 480 Independence Ave.lShanna St. Paving $793 $793 M310- Claude Road Paving $250 $250 S. Locust, Floodway to 1-80, Bridge C0040 M310- 386 4120R $1,060 $848 $212 S. Locust, Floodway to 1-80, Bridge C0040 M310- 388 4125R $1,095 $876 $219 Construction E&I - Two bridges over Platte I M310- 463 (C0040-4120R & 4125R) $275 $220 $55 M310- 444 Paving Petition Program $400 $400 Two Bridge Replacements - Blaine @ Wood M310- 267 River (Engineering Design) $45 $45 Widen Stolley Park Road - HWY 281 West M310- 489 1/4 mile $240 $240 Signal Detection - Locust & Stolley Park M310- 450 Road $50 $50 Street Resurfacing M310- 445 Annual Resurfacing Program $400 $400 Drainage & Flood Control M310- 485 PVIP Cells & Drainage $127 $127 Moores,Prairie, & Silver Creek Flood Control M310- 461 Design $486 $243 $243 M310- 434 Annual Major Drainage Development $50 $50 M310- 466 Concrete Lining of Drainage Ditches $50 $50 M310- Independence Avenue Drainage $80 $80 Other I M310- 425 Railroad Corridor Study $125 $125 Engineering Design- Hike/Bike Bridge M310- 465 Superstructure over 2 Platte River Channels $50 $50 I Hike/Bike Trail Const. along Floodway - Hall M310- 389 County Park to S. Locust $600 $480 $120 Geographic Information System (Continued $25 M310- 385 Development & Maintenance) $25 Construct One Landscaped Gateway Node M310- 384 (No.1) $25 $25 TOTALS $3,003 $723 $220 $400 $1,660 2006 CONSTRUCTION SEASON (All Costs in $1,000'5) City State City Cap. Total Federal City G.O. Impr. No. Project Description Project Other STP Bond Fund Street Construction M310- 468 2006 Paving Petition Program $600 $600 Stolley Park Rd Widening, Locust to Fonner M310- 487A Park Ent.(Eng Design & ROW) $90 $90 M310- 500 Widen Capital Avenue West of HWY 281 $1,070 $1,070 I S. Locust - HWY 34 to 1-80 - Additional M310- 407 Landscaping $60 $48 $12 Two Bridge Replacements - Blaine @Wood M310- 267 River $250 $120 $130 M310- 458 Traffic Signal - HWY 281IWildwood Dr. $160 $80 $80 M310- Wasmer Cell Construction $170 $170 Illuminating Lighting - HWY 281, Stolley to M310- 497 Old Potash $250 $250 Street Resurfacing M310- 470 Annual Resurfacing Program $750 $750 Drainage & Flood Control M310- 485 PVIP Cells & Drainage $263 $263 M310- 446 Annual Major Drainage Development $50 $50 M310- 467 Concrete Lining of Drainage Ditches $50 $50 Construct Drainway from CCC area to Wood M310- 459 River $425 $425 Moores Creek Drainage - Rogers Well to S. M310- 382 of Old Potash HWY $200 $200 Moores, Prairie, & Silver Creek Flood Control M310- 461 - Construction $780 $420 $360 M310- Detention Cell/Ditch Restoration $50 $50 I Other I Geographic Information System (Continued $25 M310- 385 Development & Maintenance) $25 M310- Misc. Safety Enhancements $150 $150 Construct One Landscaped Gateway Node M310- 387 (No.2) $25 $25 Hike/Bike Bridge Superstructure over two M310- 408 Platte River Channels $350 $280 $70 Hike/Bike Trail Construction, S. Locust- M310- 431 Floodway to 1-80 $600 $480 $120 TOTALS: $6,368 $1,428 $0 $600 $4,340 2007 CONSTRUCTION SEASON (All Costs in $1,000'5) City State City Cap. Total Federal City G.O. Impr. No. Project Description Project Other STP Bond Fund Street Construction I Stolley Park Rd widening, Locust to Fonner M310- 487A Park Ent. (Eng Design & ROW) $60 $60 S. Locust Grading and Median Drains for M310- 409 New Lanes (2007) $720 $576 $144 S. Locust Grading Floodway to 1-80, M310- 341 Surfacing New Lanes (2007) $2,750 $2,200 $550 M310- 475 2007 Paving Petition Program $600 $600 Hwy 30 - Grant to Greenwich - NDOR Project M310- 351 (FY 2007) $3,749 $3,749 $750 M310- 480 Independence Avenue Paving $1,050 $1,050 Street Resurfacing M310- 476 Annual Resurfacing Program (2007) $750 $750 Drainage & Flood Control M310- 471 Annual Major Drainage Development (2007) $500 $500 M310- 472 Concrete Lining of Drainage Ditches(2007) $50 $50 Moores,Prairie, & Silver Creek Flood Control M310- 461 - Construction $780 $420 $360 Moores Creek Drainage - Old Potash HWY to M310- Edna Dr. $150 $150 I M310- Detention Cell/Ditch Restoration $50 $50 Other I Geographic Information System (Continued M310- 385 Development & Maintenance) $25 $25 Hike/Bike Trail Construction, S. Locust to M310- 414 Morman Island. (Parallel to 1-80) $600 $480 $120 Construct One Landscaped Gateway Node M310- 390 (No 3) $25 $25 M310- Misc. Safety Enhancements $150 $150 TOTALS: $11,079 $4,649 $2,950 $1,650 $2,580 2008 Construction Season (All costs in $1,0005) City State City Cap. Total Federal City G.O. Impr. No. Project Description Project Other STP Bond Fund Street Construction Stolley Park Rd widening, Locust to Fonner M310- 487 Park Entrance (Construction) $1,200 $1,200 M310- 490 Annual Paving Petition Program (2008) $750 $750 I Faidley Ave. - Moores Creek Ditch to North M310- 353 Rd. $1,250 $1,250 Street Resurfacing M310- 491 Annual Resurfacing Program (2008) $700 $700 Drainage & Flood Control M310- 492 Annual Major Drainage Development (2008) $500 $500 M310- 493 Concrete Lining of Drainage Ditches(2008) $50 $50 Moores, Prairie, & Silver Creek Flood Control M310- 461 - Construction $780 $420 $360 M310- Detention Cell/Ditch Restoration $50 $50 Other Construct One Landscaped Gateway Node M310- 397 (No 4) $25 $25 Hike/Bike Trail Construction - State St. to M310- 447 Veterans Home $600 $480 $120 I Geographic Information System (Continued M310- 385 development and maintenance) $25 $25 M310- Misc. Safety Enhancements $150 $150 TOTALS $6,080 $900 $0 $3,200 $1,980 I 2009 Construction Season (All costs in $1,000s) City State City Cap. Total Federal City G.O. Impr. No. Project Description Project Other STP Bond Fund Street Construction M310- 501 Annual Paving Petition Program (2009) $750 $750 Widen Eddy Street Underpass to 5-lanes on M310- 334 south end $175 $175 M310- 469 Capital Ave - HWY 281 to Webb Rd $900 $900 Hwy 30 - Hwy 281 to west City Limits- M310- 352 NDOR Project $9,449 $7,559 $1,890 Street Resurfacing M310- 503 Annual Resurfacing Program (2009) $700 $700 Drainage & Flood Control I M310- 504 Annual Major Drainage Development (2009) $500 $500 M310- 505 Concrete Lining of Drainage Ditches(2009) $50 $50 Moores,Prairie, & Silver Creek Flood Control M310- 461 - Construction $780 $420 $360 M310- Detention Cell/Ditch Restoration $50 $50 Other Construct One Landscaped Gateway Node M310- 415 (No.5) $25 $25 Geographic Information System (Continued M310- 385 development and maintenance) $25 $25 Hike/Bike Trail Const. - Veterans Home to M310- Eagle Scout Park $600 $480 $120 M310- Misc. Safety Enhancements $150 $150 TOTALS $14,154 $8,459 $0 $3,540 $2,155 I 2010 and After Construction (All costs in $1,000s) I City State City Cap. Total Federal City G.O. Impr. No. Project Description Project Other STP Bond Fund Street Construction M310- Annual Paving Petition Program (2010) $750 $750 Widen Eddy Street Underpass to 5-lanes on M310- 334 south end $175 $175 M310- 89 Capital Ave - Webb to Broadwell Ave $2,500 $2,500 M310- Capital Ave - Broadwell to St. Paul Road $2,500 $2,500 M310- 499 Grade Separation Broadwell @ UPRR $12,000 $600 $11,400 M310- 502 East Bypass Grade Separation @ UPRR $16,000 $800 $15,200 S. Locust - Illumination Lighting S. City Limits M310- 498 to 1-80 $1,000 $500 $500 Hwy 30 - Hwy 281 to west City Limits - M310- 352 NDOR Project $9,449 $7,559 $1,890 Hwy 34 - Locust to Hwy 281 - NDOR M310- 411 Projec+C181 $6,679 $5,343 $1,336 M310- Swift Road - WWTP to Shady Bend Rd ?? Street Resurfacing I M310- Annual Resurfacing Program (2010) $750 $750 Drainage & Flood Control M310- Annual Major Drainage Development (2010) $500 $500 M310- Concrete Lining of Drainage Ditches(2010) $50 $50 Moores,Prairie, & Silver Creek Flood Control M310- 461 - Construction (Due remainder of Project) $4,680 $2,520 $2,160 M310- Detention Cell/Ditch Restoration $50 $50 Other Construct One Landscaped Gateway Node M310- 435 (No.6) $25 $25 Geographic Information System (Continued M310- 385 development and maintenance) $25 $25 M310- 416 BLDG Improvements at West Yard $375 $375 Hike/Bike Trail Const. along Floodway - S. M310- Locust to Platte River $600 $480 $120 M310- Misc. Safety Enhancements $150 $150 TOTALS $58,258 $17,302 $500 $35,576 $4,880 I