WHEREAS, the Regional Planning Commission, after public notice having been
published in one issue of the Grand Island Independent on January 22,2005, and such notice also
having been posted in at least three places in areas where it was likely to attract attention, conducted
a public hearing on February 2, 2005, on the One and Six Year Street Improvement Program for
2005-2010 for the City of Grand Island; and
WHEREAS, at the February 2, 2005 public hearing, the Regional Planning
Commission approved the One and Six Year Street Improvement Program 2005-2010, and
recommended that such program be approved by the City Council; and
WHEREAS, the Grand Island City Council, after public notice having been published
in one issue ofthe Grand Island Independent on February 3,2005, and such notice also having been
posted in at least three places in areas where it was likely to attract attention, conducted a public
hearing on February 8,2005, on the One and Six Year Street Improvement Program for the City of
Grand Island; and
WHEREAS, this Council has determined that the One and Six Year Street
Improvement Program as set out in Exhibit "A" should be adopted.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF
THE CITY OF GRAND ISLAND, NEBRASKA, that the One and Six Year Street Improvement
Program 2005-2010, based on priorities of needs and calculated to contribute to the orderly
development of city streets, and identified as Exhibit "A", is hereby approved and adopted by this
Council.
Adopted by the City Council of the City of Grand Island, Nebraska, February 8, 2005.
Q~~Oo- m~
RaNae Edwards, City Clerk
Approved as to Form Xl I
February 3, 2005 Xl City Attorney
I
2005 CONSTRUCTION SEASON
(ALL COSTS IN $1 ,000's)
City
State City Cap.
Total Federal City G.O. Impr.
No. Project Description Project Other STP Bond Fund
Street Construction
M310- 480 Independence Ave.lShanna St. Paving $793 $793
M310- Claude Road Paving $250 $250
S. Locust, Floodway to 1-80, Bridge C0040
M310- 386 4120R $1,060 $848 $212
S. Locust, Floodway to 1-80, Bridge C0040
M310- 388 4125R $1,095 $876 $219
Construction E&I - Two bridges over Platte
I M310- 463 (C0040-4120R & 4125R) $275 $220 $55
M310- 444 Paving Petition Program $400 $400
Two Bridge Replacements - Blaine @ Wood
M310- 267 River (Engineering Design) $45 $45
Widen Stolley Park Road - HWY 281 West
M310- 489 1/4 mile $240 $240
Signal Detection - Locust & Stolley Park
M310- 450 Road $50 $50
Street Resurfacing
M310- 445 Annual Resurfacing Program $400 $400
Drainage & Flood Control
M310- 485 PVIP Cells & Drainage $127 $127
Moores,Prairie, & Silver Creek Flood Control
M310- 461 Design $486 $243 $243
M310- 434 Annual Major Drainage Development $50 $50
M310- 466 Concrete Lining of Drainage Ditches $50 $50
M310- Independence Avenue Drainage $80 $80
Other
I M310- 425 Railroad Corridor Study $125 $125
Engineering Design- Hike/Bike Bridge
M310- 465 Superstructure over 2 Platte River Channels $50 $50
I Hike/Bike Trail Const. along Floodway - Hall
M310- 389 County Park to S. Locust $600 $480 $120
Geographic Information System (Continued $25
M310- 385 Development & Maintenance) $25
Construct One Landscaped Gateway Node
M310- 384 (No.1) $25 $25
TOTALS $3,003 $723 $220 $400 $1,660
2006 CONSTRUCTION SEASON
(All Costs in $1,000'5)
City
State City Cap.
Total Federal City G.O. Impr.
No. Project Description Project Other STP Bond Fund
Street Construction
M310- 468 2006 Paving Petition Program $600 $600
Stolley Park Rd Widening, Locust to Fonner
M310- 487A Park Ent.(Eng Design & ROW) $90 $90
M310- 500 Widen Capital Avenue West of HWY 281 $1,070 $1,070
I S. Locust - HWY 34 to 1-80 - Additional
M310- 407 Landscaping $60 $48 $12
Two Bridge Replacements - Blaine @Wood
M310- 267 River $250 $120 $130
M310- 458 Traffic Signal - HWY 281IWildwood Dr. $160 $80 $80
M310- Wasmer Cell Construction $170 $170
Illuminating Lighting - HWY 281, Stolley to
M310- 497 Old Potash $250 $250
Street Resurfacing
M310- 470 Annual Resurfacing Program $750 $750
Drainage & Flood Control
M310- 485 PVIP Cells & Drainage $263 $263
M310- 446 Annual Major Drainage Development $50 $50
M310- 467 Concrete Lining of Drainage Ditches $50 $50
Construct Drainway from CCC area to Wood
M310- 459 River $425 $425
Moores Creek Drainage - Rogers Well to S.
M310- 382 of Old Potash HWY $200 $200
Moores, Prairie, & Silver Creek Flood Control
M310- 461 - Construction $780 $420 $360
M310- Detention Cell/Ditch Restoration $50 $50
I Other
I Geographic Information System (Continued $25
M310- 385 Development & Maintenance) $25
M310- Misc. Safety Enhancements $150 $150
Construct One Landscaped Gateway Node
M310- 387 (No.2) $25 $25
Hike/Bike Bridge Superstructure over two
M310- 408 Platte River Channels $350 $280 $70
Hike/Bike Trail Construction, S. Locust-
M310- 431 Floodway to 1-80 $600 $480 $120
TOTALS: $6,368 $1,428 $0 $600 $4,340
2007 CONSTRUCTION SEASON
(All Costs in $1,000'5)
City
State City Cap.
Total Federal City G.O. Impr.
No. Project Description Project Other STP Bond Fund
Street Construction
I Stolley Park Rd widening, Locust to Fonner
M310- 487A Park Ent. (Eng Design & ROW) $60 $60
S. Locust Grading and Median Drains for
M310- 409 New Lanes (2007) $720 $576 $144
S. Locust Grading Floodway to 1-80,
M310- 341 Surfacing New Lanes (2007) $2,750 $2,200 $550
M310- 475 2007 Paving Petition Program $600 $600
Hwy 30 - Grant to Greenwich - NDOR Project
M310- 351 (FY 2007) $3,749 $3,749 $750
M310- 480 Independence Avenue Paving $1,050 $1,050
Street Resurfacing
M310- 476 Annual Resurfacing Program (2007) $750 $750
Drainage & Flood Control
M310- 471 Annual Major Drainage Development (2007) $500 $500
M310- 472 Concrete Lining of Drainage Ditches(2007) $50 $50
Moores,Prairie, & Silver Creek Flood Control
M310- 461 - Construction $780 $420 $360
Moores Creek Drainage - Old Potash HWY to
M310- Edna Dr. $150 $150
I M310- Detention Cell/Ditch Restoration $50 $50
Other
I Geographic Information System (Continued
M310- 385 Development & Maintenance) $25 $25
Hike/Bike Trail Construction, S. Locust to
M310- 414 Morman Island. (Parallel to 1-80) $600 $480 $120
Construct One Landscaped Gateway Node
M310- 390 (No 3) $25 $25
M310- Misc. Safety Enhancements $150 $150
TOTALS: $11,079 $4,649 $2,950 $1,650 $2,580
2008 Construction Season
(All costs in $1,0005)
City
State City Cap.
Total Federal City G.O. Impr.
No. Project Description Project Other STP Bond Fund
Street Construction
Stolley Park Rd widening, Locust to Fonner
M310- 487 Park Entrance (Construction) $1,200 $1,200
M310- 490 Annual Paving Petition Program (2008) $750 $750
I Faidley Ave. - Moores Creek Ditch to North
M310- 353 Rd. $1,250 $1,250
Street Resurfacing
M310- 491 Annual Resurfacing Program (2008) $700 $700
Drainage & Flood Control
M310- 492 Annual Major Drainage Development (2008) $500 $500
M310- 493 Concrete Lining of Drainage Ditches(2008) $50 $50
Moores, Prairie, & Silver Creek Flood Control
M310- 461 - Construction $780 $420 $360
M310- Detention Cell/Ditch Restoration $50 $50
Other
Construct One Landscaped Gateway Node
M310- 397 (No 4) $25 $25
Hike/Bike Trail Construction - State St. to
M310- 447 Veterans Home $600 $480 $120
I Geographic Information System (Continued
M310- 385 development and maintenance) $25 $25
M310- Misc. Safety Enhancements $150 $150
TOTALS $6,080 $900 $0 $3,200 $1,980
I 2009 Construction Season
(All costs in $1,000s)
City
State City Cap.
Total Federal City G.O. Impr.
No. Project Description Project Other STP Bond Fund
Street Construction
M310- 501 Annual Paving Petition Program (2009) $750 $750
Widen Eddy Street Underpass to 5-lanes on
M310- 334 south end $175 $175
M310- 469 Capital Ave - HWY 281 to Webb Rd $900 $900
Hwy 30 - Hwy 281 to west City Limits-
M310- 352 NDOR Project $9,449 $7,559 $1,890
Street Resurfacing
M310- 503 Annual Resurfacing Program (2009) $700 $700
Drainage & Flood Control
I M310- 504 Annual Major Drainage Development (2009) $500 $500
M310- 505 Concrete Lining of Drainage Ditches(2009) $50 $50
Moores,Prairie, & Silver Creek Flood Control
M310- 461 - Construction $780 $420 $360
M310- Detention Cell/Ditch Restoration $50 $50
Other
Construct One Landscaped Gateway Node
M310- 415 (No.5) $25 $25
Geographic Information System (Continued
M310- 385 development and maintenance) $25 $25
Hike/Bike Trail Const. - Veterans Home to
M310- Eagle Scout Park $600 $480 $120
M310- Misc. Safety Enhancements $150 $150
TOTALS $14,154 $8,459 $0 $3,540 $2,155
I
2010 and After Construction
(All costs in $1,000s)
I City
State City Cap.
Total Federal City G.O. Impr.
No. Project Description Project Other STP Bond Fund
Street Construction
M310- Annual Paving Petition Program (2010) $750 $750
Widen Eddy Street Underpass to 5-lanes on
M310- 334 south end $175 $175
M310- 89 Capital Ave - Webb to Broadwell Ave $2,500 $2,500
M310- Capital Ave - Broadwell to St. Paul Road $2,500 $2,500
M310- 499 Grade Separation Broadwell @ UPRR $12,000 $600 $11,400
M310- 502 East Bypass Grade Separation @ UPRR $16,000 $800 $15,200
S. Locust - Illumination Lighting S. City Limits
M310- 498 to 1-80 $1,000 $500 $500
Hwy 30 - Hwy 281 to west City Limits -
M310- 352 NDOR Project $9,449 $7,559 $1,890
Hwy 34 - Locust to Hwy 281 - NDOR
M310- 411 Projec+C181 $6,679 $5,343 $1,336
M310- Swift Road - WWTP to Shady Bend Rd ??
Street Resurfacing
I M310- Annual Resurfacing Program (2010) $750 $750
Drainage & Flood Control
M310- Annual Major Drainage Development (2010) $500 $500
M310- Concrete Lining of Drainage Ditches(2010) $50 $50
Moores,Prairie, & Silver Creek Flood Control
M310- 461 - Construction (Due remainder of Project) $4,680 $2,520 $2,160
M310- Detention Cell/Ditch Restoration $50 $50
Other
Construct One Landscaped Gateway Node
M310- 435 (No.6) $25 $25
Geographic Information System (Continued
M310- 385 development and maintenance) $25 $25
M310- 416 BLDG Improvements at West Yard $375 $375
Hike/Bike Trail Const. along Floodway - S.
M310- Locust to Platte River $600 $480 $120
M310- Misc. Safety Enhancements $150 $150
TOTALS $58,258 $17,302 $500 $35,576 $4,880