Loading...
10/14/2003 Resolutions 2003-280 I I I RES 0 L UTI 0 N 2003-280 WHEREAS, the City of Grand Island invited sealed bids for Substation Transformer Testing and Inspection Services, according to plans and specifications on file at the Utility Engineering Office at Phelps Control Center; and WHEREAS, on September 8, 2003, bids were received, opened and reviewed; and WHEREAS, Waukesha Electric Systems of Maitland, Florida, submitted a bid in accordance with the terms of the advertisement of bids and plans and specifications and all other statutory requirements contained therein, such bid being in the amount of $83,600.00; and WHEREAS, Waukesha Electric Systems' bid is less than the engineer's estimate for such proj ect; and WHEREAS, it is recommended that an additional amount at a maximum of$97,500 ($9,750 per load tap charger) be awarded to Waukesha Electric System for major load tap charger component replacement. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that the bid ofWaukesha Electric Systems of Maitland, Florida, in the amount of $83,600.00 for substation transformer testing and inspection services is hereby approved as the lowest responsible bid. BE IT FURTHER RESOLVED, that an additional amount at a maximum of$97,500 ($9,750 per load tap charger) be awarded to Waukesha Electric System for major load tap charger component replacement. BE IT FURTHER RESOLVED, that a contract for such project between the City and such contractor be entered into, and the Mayor is hereby authorized and directed to execute such contract on behalf of the City of Grand Island. Adopted by the City Council of the City of Grand Island, Nebraska, October 14, 2003. Qcf\(U ~aru(h; RaNae Edwards, City Clerk Approved as to Form l:l October 10, 2003