11/12/2002 Resolutions 2002-351
I
I
I
RES 0 L UTI 0 N 2002- 351
WHEREAS, on May 21,2002, by Resolution 2002-145, the City Council for the City
of Grand Island awarded the bid for the construction of the Shoemaker Hike/Bike Trail to Galvan
Construction of Grand Island, Nebraska; and
WHEREAS, it has been determined that modifications to the work to be performed by
Galvan Construction are necessary; and
WHEREAS, such modifications have been incorporated into Change Order No.1;
and
WHEREAS, the result of such modifications for this project will increase the contract
amount by $3,570.50.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF
THE CITY OF GRAND ISLAND, NEBRASKA, that the Mayor be, and hereby is, authorized and
directed to execute Change Order No.1 between the City of Grand Island and Galvan Construction
to provide modifications as outlined on the attached list.
Adopted by the City Council ofthe City of Grand Island, Nebraska on November 12, 2002.
Qr\aL yi2r~
RaNae Edwards, City Clerk
Approved as to Form T ~vd
November 7, 2002 A CI Y ttorney
I SHOEMAKER TRAIL PROJECT NO. STPB-40(49) C.M. 42178 CHANGE ORDER NO.1. FINAL
CITY OF GRAND ISLAND
GRANDISLAND,NEBRASKA OA PROJECT NO. 2001-0764
GALVAN CONSTRUCTION
IIEI4 llIIIIll f:I.AtI..QIY. AlW:lltm. aIIllIlEIlllCI fIIll:E1 r.nNTRAeT PRICf: S AnJUSTFO PRICF. t Annmt:ntJr.T S
Base Bid
I 6" P.C. Concrete Bike Trail S.Y. 11,420.00 11,451.00 31.00 20.50 234,110.00 234,745.50 635.50
2 6" Asphaltic Concrete Pavement S.Y. 25.00 0.00 (25.00) 40.00 1,000.00 0.00 (1,000.00)
3 Build Bollard EA. 8.00 8.00 0.00 50.00 400.00 400.00 0.00
4 Adjust Manhole to Grade EA. 1.00 0.00 (1.00) 150.00 150.00 0.00 (150.00)
5 Adjust Valve to Grade EA. 1.00 0.00 (1.00) 150.00 150.00 0.00 (150.00)
6 Adjust Fire Hydrant to Grade EA. 1.00 0.00 (1.00) 600.00 600.00 0.00 (600.00)
7 Sawcut Pavement L.F. 79.00 22.00 (57.00) 3.00 237.00 66.00 (171.00)
8 Pavement Removal S.Y. 38.00 13.00 (25.00) 15.00 570.00 195.00 (375.00)
9 Remove and Salvage Fence LF. 108.00 108.00 0.00 3.00 324.00 324.00 0.00
10 Remove and Salvage Gate EA. 2.00 2.00 0.00 100.00 200.00 200.00 0.00
11 Remove Culvert LF. 41.00 0.00 . (41.00) 5.00 205.00 0.00 (205.00)
12 Remove and Salvage Culvert LF. 28.00 22.50 (5.50) 10.00 280.00 225.00 (55.00)
13 Remove & Reset IS" Reinforced Concrete F.E.S. EA. 1.00 1.00 0.00 100.00 100.00 100.00 0.00
14 IS" Reinforced Concrete Storm Sewer Pipe L.F. 67.50 16.00 (51.50) 30.00 2,025.00 480.00 (1,545.00)
IS IS" Corrugated Metal Pipe Culvert LF. 29.00 20.00 (9.00) 25.00 725.00 500.00 (225.00)
16 IS" Round Equivalent Corrugated Metal Pipe Culvert LF. 31.00 38.00 7.00 25.00 775.00 950.00 175.00
17 IS" Corrugated Metal F.E.S. EA. 3.00 2.00 (1.00) 125.00 375.00 250.00 (125.00)
18 IS" Round Equivalent Corrugated Metal F.E.S. EA. 4.00 4.00 0.00 125.00 500.00 500.00 0.00
19 8" P.V.C. Pipe LF. 16.00 20.00 4.00 10.00 160.00 . 200.00 40.00
20 4" P.V.C.Pipe LF. 148.00 160.00 12.00 8.00 1,184.00 1,280.00 96.00
21 Erosion Control, Type "MA" S.Y. 187.30 187.30 0.00 20.00 3,746.00 3,746.00 0.00
122 Clearing and Grubbing LS. 1.00 1.00 0.00 1,000.00 1,000.00 1,000.00 0.00
23 Seeding AC. 2.45 1.20 (1~25) 1,500.00 3,675.00 1,800.00 (1,875.00)
24 Earthwork LS. 1.00 1.00 .0.00. 22,000.00 22,000.00 22,000.00 0.00
Additional]teJns -Work Change Directive No. I
18" COtnlgated Metal Pipe Culvert LF. 0.00 10.00 10.00 25.00 0.00 250.00 250.00
18~ CotnIgatedMetal Flared End Section EA. 0.00 1.00 1.00 150.00 0.00 150.00 150.00
Seeding, Bluegrass AC. . 0.00 0.05 0.05 1,500.00 0.00 75.00 75.00
Seeding, NOOR Type "B" AC. 0.00 5.75 5.75 ],500.00 0.00 8,625.00 8,625.00
TOTAL ADD $274,491.00 $278,061.50 . $3,570.50
.;j;"f.~i~.
I
~.