04/23/2002 Resolutions 2002-116
I
I
I
RES 0 L UTI 0 N 2002-116
WHEREAS, on November 21,2000, by Resolution 2000-355, the City Council for
the City of Grand Island awarded the bid for the construction of South Locust Street between U.S.
Highway 34 and Stolley Park Road to the Diamond Engineering Company of Grand Island,
Nebraska; and
WHEREAS, it has been determined that modifications to the work to be performed by
the Diamond Engineering Company are necessary; and
WHEREAS, such modifications have been incorporated into Change Order No.3;
and
WHEREAS, the result of such modifications for this project will increase the contract
amount by $15,807.50, for a revised contract amount of$5,166,064.86.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF
THE CITY OF GRAND ISLAND, NEBRASKA, that the Mayor be, and hereby is, authorized and
directed to execute Change Order No.3, between the City of Grand Island and the Diamond
Engineering Company to provide the following modifications:
Amount
Delete concrete for retaining wall at Star Motel property ...........................................................($16,555.00)
Delete reinforcing steel for retaining wall at Star Motel property................................................... (1,724.80)
Delete Patrician style railing at Harley Davidson property............................................................. (6,068.40)
Delete modular block retaining wall at Harley Davidson property .................................................(1,749.30)
Add Jack and Bore 2" conduit under existing pavement ................................................................. 3,402.00
Relocate electrical circuit that feeds the Pump and Pantry and Best Western Signs........................ 1,550.00
Add 6"x6" tapping sleeve ................................................................................................................ 2,105.00
Add 12"x6" tapping sleeve ..............................................................................................................2,675.00
Add 12"x4" tapping sleeve .............................................................................................................. 2,445.00
Tap existing water main for 1 W' service............................................................................................. 400.00
Add 1~" corporation stop................................................................................................................... 225.80
Add 1~" curb stop with box ............................................... ............. ..................... ..... ....... ......... .........494.40
Add 1~" copper water service line .................................................................................................. 1,269.00
Remove and backfill swimming pool at Star Motel......................................................................... 4,881.80
Inlay preformed plastic pavement markings Type 4...................................................................... 10,557.00
Add 4"x3" DI reducer ............................................................ ............................................ ................... 80.00
Add 4" DI offset fitting ... ..................... ............................. ..................................................................360.00
Purchase Patrician Style railing ............................................................ ....... ..... ...............................2,900.00
Remove 24" FES . ........................ ................................................................ ..................................... ....40.00
Remove 36" FES .................................................................................................... ..............................45.00
Build 36" to 24" concrete collar.......................................................................................................... 300.00
Adjust area inlet to grade ............................ ........................... ............................................................. 575.00
Construct steel pipe bollard . .............. ...................................................... ........................................7,600.00
Approved as to Form T r...oc
Apri/19,2002 ... City Attorney
I
I
I
Adopted by the City Council of the City of Grand Island, Nebraska on April 23, 2002.
Q~\\o.L CCD lU?~,Lv
RaNae Edwards, City Clerk
I //'JI.~
Approved as to Form'" ~
April 19, 2002 io. City Attorney