Loading...
09/26/2000 Resolutions 2000-290 I I I RES 0 L UTI 0 N 2000-290 WHEREAS, the City Council for the City of Grand Island has previously awarded the bid for the construction project on South Locust between Highway 34 and the Wood River Diversion Bridge to Werner Construction Co. of Hastings, Nebraska; and WHEREAS, it has been determined that modifications to the work to be performed by Werner Construction Co. are necessary; and WHEREAS, such modifications have been incorporated into Change Order No.5; and WHEREAS, the result of such modifications for this project will increase the contract amount by $5,062.85. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that the Mayor be, and hereby is, authorized and directed to execute Change Order No.5, between the City of Grand Island and Werner Construction Co. to provide the following modifications: Lighting Control Center, Type D ..................................................................................................... $860.00 38 mm Conduit in Trench................................................................................................................. $195.00 Remove & Reinstall Pull Box ................................................................................................... ....... $787.50 Remove & Reinstall Vehicle Detector.. ...................................... .................. ................................... $668.85 Lighting Control Center "R" .................................~.................................. ..................................... $1,302.00 Electrical Service........................................................................................................................... $1,249.50 Adopted by the City Council of the City of Grand Island, Nebraska on September 26, 2000. Q;~ Ww~ RaNae Edwards, City Clerk Approved as to Form 0 c.qt;r September 22, 2000 0 City Attorney