Loading...
03/13/2000 Resolutions 2000-79 I I I RES 0 L UTI 0 N 2000-79 WHEREAS, on November 8, 1999, by Resolution 99-353, the City of Grand Island concurred with the Nebraska Department of Roads for the bid award for construction of a Federal Aid Project including grading, culverts, bridge, concrete pavement and utilities on South Locust Street from U.S. Highway 34 south to the Wood River Floodway to Werner Construction Co. of Hastings, Nebraska under State Contract NDOR #STPAA-5414(l) CN 41415; and WHEREAS, it has been determined that modifications to the work to be performed by Werner Construction Co. are necessary to install additional sanitary sewer along Lake Street and South Locust Street; and WHEREAS, such modification has been incorporated into a change order dated February 23, 2000; and WHEREAS, this change order will result in a net increase to the contract in the amount of $112,550.1 O. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that the Mayor be, and hereby is, authorized and directed to execute the change order dated February 23, 2000, between the City of Grand Island and Werner Construction Co. to provide the following modifications: [4910.25] Dewatering (207.11 @ $76.56) ......................................................................................15,856.34 [4731.10] 250 rom Sanitary Sewer Pipe (923.680 @ $56.25) ......................................................... 51,957.00 [4731.06] 150 rom Sanitary Sewer Pipe (27.040 @ $37.74).............................................................1,020.49 [4016.11] Manhole Sanitary Sewer (9 @ $1,960.42).............................................:........................ 17,643.78 [4015.75] Manhole Sanitary Sewer (22.937 @ $549.44) ................................................................12,602.51 [4042.55] Connect Sanitary Sewer (15 @ $366.82) ......................................................................... 5,502.30 [4790.00] Sanitary Sewer Crossing (3 @ $541.89) .............. ................. ..................................... ...... 1,625.67 [2001.00] Gravel Surface Course (132 em@ $11.85) ...................................................................... 1,564.20 [6960.51] Compensation for Additional Handling Cost (1 @ $1,185.00) ........................................ 1,185.00 [2009.10] Gravel Embedment (2.151 @ $1,235.85) ......................................................................... 2,658.31 [4017.00] Tapping Existing Sanitary Sewer Manhole (1 @ $934.50) ................................................. 934.50 Adopted by the City Council of the City of Grand Island, Nebraska on March 13,2000. ,.. Approved as to Form" c..gt... March 9, 2000 ... City Attorney