Loading...
03/13/2000 Resolutions 2000-78 I I I RES 0 L UTI 0 N 2000-78 WHEREAS, on November 8, 1999, by Resolution 99-353, the City of Grand Island concurred with the Nebraska Department of Roads for the bid award for construction of a Federal Aid Project induding grading, culverts, bridge, concrete pavement and utilities on South Locust Street from U.S. Highway 34 south to the Wood River F100dway to Werner Construction Co. of Hastings, Nebraska under State Contract NDOR #STPAA-5414(1) CN 41415; and WHEREAS, it has been determined that modifications to the work to be performed by Werner Construction Co. are necessary to install additional water main along Lake Street and South Locust Street; and WHEREAS, such modification has been incorporated into a change order dated February 23, 2000; and WHEREAS, this change order will result in a net increase to the contract in the amount of$98,540.71. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that the Mayor be, and hereby is, authorized and directed to execute the change order dated February 23,2000, between the City of Grand Island and Werner Construction Co. to provide the following modifications: [W205.16] 400 mm (D.I.P.) Water Main Pipe (504.35 @$117.27) ............................................... 59,145.12 [W222.66] 400 mm Butterfly Valve, M.J. (1 @ $1,926.11) ............................................................. 1,926.11 [W222.80] 150 mm Pumper Hydrant (3 @ $1,987.22)..................................................................... 5,961.66 [W356.25] 400 mm X 150 mm Tee (3 @ $666.53).......................................................................... 1,999.59 [W355.16] 400 mm Sleeve (2 @ $463.79) .......................................................................................... 927.58 [W359.16] Delete 400 mm Cap (2 @ $265.38).................................................................................. (530.76) [W100.25] Valve Box (1 @ $112.63).................................................................................................. 112.63 [W176.08] 38 mm Copper Water Service (6 @ $33.00) ..................................................................... 198.00 [W180.00] Delete Concrete Class 47B-25 for Blocks and Anchorages (1.88 @ $186.33) ................. (350.30) [W359.1O] Delete 250 mm Cap (3 @ $100.82).................................................................................. (302.46) [W359.06] Delete 150mm Cap (9 @ $54.11)..................................................................................... (486.99) [6960.51] Compensation for Additional Handling Cost (1 @ $755.00)"""""."""."".""."".""".""""". 755.00 [4976.08] Additional Cost - 2 mm polyethylene wrap (1178.50 @ $3.57)""".".."""""."."".""""".,,4,207.25 [4910.25] Dewatering (Water Main) (504.35 @ $43.00) ................................................................ 21,687.05 [W800.21] Remove C.I. Water Main (66.50@ $22.05) .................................................................... 1,466.33 [W800.35] Remove and Salvage Hydrant (2 @ $590.10) ................................................................ 1,180.20 [W800.24] Remove and Salvage Valve (2 @ $322.35) ..............................................................."......644.70 Approved as to Form" C~ March 9, 2000 .... City At orney I I I Adopted by the City Council of the City of Grand Island, Nebraska on March 13, 2000. Approved as to Form T CfiV March 9, 2000 ... City Attorney