Loading...
05/13/2025 Resolutions 2025-153 RESOLUTION 2025-153 WHEREAS,to ensure a reliable electric supply grid,electric utilities are required by federal and regional agencies to maintain accredited electric generation facilities in an amount to meet their maximum load requirements,plus a reserve to support outside needs in an emergency grid situation; and WHEREAS, with its units at Platte, Burdick, Prairie Breeze III, Solar Farm, and a share of units at Nebraska City, Hastings, and WAPA, the Utilities Department currently has accredited winter generation that is fifty-two Megawatts in exceedance of what is required to serve the existing City load during the months noted; and WHEREAS,NextEra Energy proposes under the terms of the Confirmation Letter,as required under the Master Power Purchase&Sale Agreement entered into via Resolution 2022-224, to buy surplus capacity from the Department and sell to a third party which needs accredited capacity from December 2026 through March 2027 and from December 2027 through March 2028. NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND,NEBRASKA,that the Confirmation Letter with NextEra Energy is approved, and the Mayor is hereby authorized to sign the letter on behalf of the City of Grand Island. Adopted by the City Council of the City of Grand Island, Nebraska, May 13, 2025. roger G. Steele, Mayor Attest: Fill Granere, City Clerk