Loading...
10/08/2024 Resolutions 2024-249 RESOLUTION 2024-249 WHEREAS, there are six (6) total raw sewage pumps located in the Headworks building at the Wastewater Treatment Plant,which are used to pump incoming sewage for treatment; and WHEREAS, the pumps are in two (2) redundant wet wells, with each designed to handle the normal daily influent flow while allowing maintenance to be done on the pumps and ancillary equipment in one (1)wet well at a time; and WHEREAS,one(1)of the 10 MGD pumps is out of service due to a seal failure and needs repair; and WHEREAS,to keep redundancy of the pump station in place and maintain capacity for wet weather events at design levels a backup pump is also requested; and WHEREAS, Electric Pump of Des Moines,Iowa was designated as the sole source vendor via Resolution No. 2021-346 on December 14, 2021; and WHEREAS, the Wastewater Treatment Plant is seeking approval to repair the 10 MGD pump that is currently out of service for an amount of$65,839.50, as well as purchase a backup pump in the amount of$101,520.00 from Electric Pump of Des Moines,Iowa,plus shipping and handling. NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that the repair and purchase of the above noted pumps, in the total amount of$167,359.50,plus shipping and handling from Electric Pump of Des Moines, Iowa is hereby approved. Adopted by the City Council of the City of Grand Island,Nebraska, October 8, 2024. Ro_or . Steele, Mayor Attest: ,lam �i'Z�rC Ji ranere, City Clerk