Loading...
11-24-2020 GI Area Metropolitan Planning Organization Regular Meeting PacketGIAMPO - Policy Board Tuesday, November 24, 2020 4:00 pm @ City Hall- Community Meeting Room 100 E 1st Street, Grand Island, NE 68801 AGENDA 1.Call to Order This is a public meeting subject to the open meetings laws of the State of Nebraska. The requirements for an open meeting are posted on the wall in this room and anyone that wants to find out what those are is welcome to read through them. 2.Roll Call & Introductions 3.Zoom Call Information 4.Approval of Minutes from the August 25, 2020 Policy Board Meeting 5.Approval of Final Draft TIP Amendment No. 1 to FY 2021-2025 TIP 6.Approval of MPO Targets for Safety Performance Measures 7.Approval of MPO Targets for Pavement and Bridge Condition Performance Measures 8.Approval of MPO Targets for NHS Travel Time Reliability and Freight Reliability Performance Measures 9.Long Range Transportation Plan Project Priorities 10.MPO Financial Update 11.Next Meeting 12.Adjournment Grand Island Regular Session - 11/24/2020 Page 1 / 167 Special Accommodations: Please notify the City of Grand Island at 308-385-5444 if you require special accommodations to attend this meeting (i.e., interpreter services, large print, reader, hearing assistance). Grand Island Regular Session - 11/24/2020 Page 2 / 167 GIAMPO – Policy Board Tuesday, November 24, 2020 Regular Session Item -1 Zoom Call Information Due to COVID-19 Restrictions on Gatherings this meeting will be held via Zoom for the general public. Directions for joining via Zoom are on the next page. Staff Contact: Andres Gomez, MPO Program Manager Grand Island Regular Session - 11/24/2020 Page 3 / 167 Join Zoom Meeting https://us02web.zoom.us/j/83256060846?pwd=V3hualpqVUhYTEpwVzJBUlBIQ1dQdz09 Meeting ID: 832 5606 0846 Passcode: 449810 One tap mobile +17209289299,,83256060846#,,,,,,0#,,449810# US (Denver) +12532158782,,83256060846#,,,,,,0#,,449810# US (Tacoma) Dial by your location +1 720 928 9299 US (Denver) +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 602 753 0140 US (Phoenix) +1 669 219 2599 US (San Jose) +1 651 372 8299 US (St. Paul) +1 929 205 6099 US (New York) +1 301 715 8592 US (Washington D.C) +1 312 626 6799 US (Chicago) 877 853 5247 US Toll-free 888 788 0099 US Toll-free Meeting ID: 832 5606 0846 Passcode: 449810 Find your local number: https://us02web.zoom.us/u/kckJM3nRO4 Grand Island Regular Session - 11/24/2020 Page 4 / 167 GIAMPO – Policy Board Tuesday, November 24, 2020 Regular Session Item C1 Approval of Minutes from the August 25, 2020 Policy Board Meeting Staff Contact: Mayor Roger Steele Grand Island Regular Session - 11/24/2020 Page 5 / 167 GRAND ISLAND AREA METROPOLITAN PLANNING ORGANIZATION (GIAMPO) MINUTES OF POLICY BOARD MEETING Tuesday, August 25, 2020 at 4:00 pm Grand Island City Hall – Community Meeting Room 100 E 1st Street, Grand Island, NE 68801 VOTING MEMBERS ATTENDANCE: Roger Steele, Mayor, City of Grand Island Present Mitch Nickerson, City of Grand Island, Council Member Absent Julie Hehnke, City of Grand Island, Council Member Present Clay Schutz, City of Grand Island, Council Member Absent Wes Wahlgren (Kyle Schneweis designee) NDOT District 4 Engineer Present Gary Quandt, Hall County Commissioner Present Ron Peterson, Hall County Commissioner Present Pat O’Neill, Hall County Planning Commission Chairman Absent NON-VOTING MEMBERS ATTENDANCE: Jerry Janulewicz, City of Grand Island City Administrator Present Keith Kurz, City of Grand Island Assistant Public Works Director Absent VACANT, City of Grand Island, Assistant City Administrator Absent Andres Gomez, City of Grand Island MPO Program Manager Present Catrina DeLosh, City of Grand Island Public Works Admin Assistant Present Patrick Brown, City of Grand Island Finance Director Present Brian Schultz, City of Grand Island Asst. Finance Director Present Stacy Nonhof, City of Grand Island Interim Attorney Absent John Collins, City of Grand Island Public Works Director Present Tim Golka, City of Grand Island Project Manager Absent Chad Nabity, Regional Planning Director Absent Charlene Falmlen, Transit Program Manager Absent Joseph Werning, Administrator, FHWA NE Division Absent Mokhtee Ahmad, Administrator, FTA Region VII Absent Wes Wahlgren, NDOT District 4 Engineer Absent Justin Luther, Transportation Planner, Realty, Civil Rights FHWA Absent Logan Daniels, FTA Transportation Program Specialist Absent Mark Bechtel, FTA Community Planner Absent Daniel Nguyen, FTA Community Planner Absent Mark Fischer, NDOT Assistant Planning Engineer Absent Call to Order Mayor Steele called the meeting to order at 4:00 pm. The Nebraska Open Meetings Act was acknowledged. Roll Call Roll call was taken, followed by introductions. Grand Island Regular Session - 11/24/2020 Page 6 / 167 2 | Page 2020/5/26 Policy Board Meeting Minutes Approval of Minutes from the May 26, 2020 Policy Board Meeting Motion by Quandt to approve the minutes from the May 26, 2020 meeting, seconded by Hehnke. Upon roll call vote, all voted in favor. Motion adopted. Approval Recommendation of Final Draft Amendment No. 1 for FY 2021 Unified Planning Work Program GIAMPO staff prepared an amendment to the FY 2021 Unified Planning Work Program (UPWP) due to changes in priorities and activities. A fifteen (15) day public comment period was made available August 7 to August 24, 2020. Such amendment changes the budget for the LRTP work element from $87,613.38 to $120,870.44, resulting in a total budget increase of the FY 2021 UPWP from $230,307.04 to $263,564.10 Motion by Peterson to approve the Final Draft Amendment No. 1 for FY 2021 Unified Planning Work Program, seconded by Wahlgren. Upon roll call vote, all voted in favor. Motion adopted. MPO Financial Update Gomez provided an update for State Fiscal Year 2020; Fourth Quarter, which is from April 1, 2020 to June 30, 2020. Long Range Transportation Plan Update Gomez gave information from the 2045 Long Range Transportation Plan (LRTP) public input that was gathered during the June 1 through June 15, 2020 online public meeting. Next Meeting Date The next meeting of the Policy Board will be on November 24, 2020 at 4:00 pm at City Hall. Adjournment There being no further business, Mayor Steele adjourned the meeting at 4:35 pm. Grand Island Regular Session - 11/24/2020 Page 7 / 167 GIAMPO – Policy Board Tuesday, November 24, 2020 Regular Session Item E1 Approval of Final Draft TIP Amendment No. 1 to FY 2021-2025 TIP Staff Contact: Andres Gomez, MPO Program Manager Grand Island Regular Session - 11/24/2020 Page 8 / 167 1 TAC Agenda Report Agenda Item No. E1 November 24, 2020 ISSUE VOTE: Amendment No. 1 to the 2021-2025 Transportation Improvement Program BACKGROUND The Transportation Improvement Program (TIP) is the region’s short-range program, identifying projects to receive federal funds and projects of regional significance to be implemented over the next five year period. The Grand Island Area Metropolitan Planning Organization (GIAMPO) amends the TIP to accommodate changes to projects in the TIP. The proposed Amendment No. 1 to the 2021-2025 TIP includes changes to one transit and seven roadway projects: •1 revised transit project: o TIP No. 2021-003 – changes include using CARES Act funding in addition to state and local funds to plan and purchase the transit facility ($1,708,000) in fiscal year 2021. •7 revised roadway project: o TIP No. 2018-003 – change the year of expenditure for right of way from 2020 to 2021, change the construction cost (Local) from $479,000 to 503,000, change the construction cost (Federal) from $1,914,000 to $2,011,000 for the 5-Points Intersection Improvements project in Grand Island, NE. o TIP No. 2016-004 – change the year of expenditure for PE from 2020 to 2022, change the year of expenditure for ROW from 2021 to 2023, change year of expenditure for construction from 2022 to 2024, change PE cost (Local) from $191,000 to 147,000, change PE cost (State) from $2,126,000 to $2,204,000, change construction cost (Local) from $2,199,000 to $2,190,000, change construction cost (State) from $20,369,000 to $23,054,000 for the US-281 West project in Grand Island, NE. o TIP No. 2016-008 – change PE cost (State) from $280,000 to $290,000, change construction cost (Local) from $170,000 to $197,000, change construction cost (Federal) from $3,636,000 to $4,007,000, change construction cost (State) from $899,000 to $969,000 for the Grand Island Bridges project in Grand Island, NE. o TIP No. 2018-001 – change PE cost (State) from $99,000 to $585,000, change ROW cost (State) from $10,000 to $0, change construction cost (Local) from $199,000 to $2,080,000, change construction cost (Federal) from $7,852,000 to $11,336,000, change construction cost (State) from $1,802,000 to $1,667,000 for the Cairo – Grand Island project. o TIP No. 2020-001 – change PE cost (State) from $74,000 to $418,000 for the Grand Island & South (SB) project. Grand Island Regular Session - 11/24/2020 Page 9 / 167 2 o TIP No. 2020-002 – change year of expenditure for PE from 2020 to 2021, change year of expenditure for construction from 2021 to 2022 for the District 4 Wetland Bank project. o TIP No. 2020-003 – change PE cost (State) from $3,000 to $27,000, change construction cost (State) from $657,000 to $1,018,000. POLICY CONSIDERATIONS/DISCUSSION GIAMPO’s Public Participation Plan requires that proposed amendments to the TIP be released for public review and comment prior to Policy Board adoption. The proposed Amendment No. 1 was made available for a 15-day public comment period from October 20 to November 4, 2020. The project in the proposed Amendment No. 1 is financially constrained, and it is consistent with the currently adopted Long Range Transportation Plan. BUDGET CONSIDERATIONS None. COMMITTEE ACTION The TAC approved the recommendation of Amendment No. 1 to the 2021-2025 TIP on October 19, 2020. RECOMMENDATION Approve Amendment No. 1 to the 2021-2025 Transportation Improvement Program. STAFF CONTACTS Andres Gomez Grand Island Regular Session - 11/24/2020 Page 10 / 167 Transportation Improvement Program Fiscal Years 2021 – 2025 Grand Island Area Metropolitan Planning Organization (GIAMPO) Disclaimer The preparation of this report has been financed in part through funds from the Federal Highway Administration and Federal Transit Administration, U. S. Department of Transportation, under the Metropolitan Planning Program, Section 104(f) of Title 23, U.S. Code. The contents of this report do not necessarily reflect the official views or policy of the U.S. Department of Transportation. Amendment No. 1 – Approved on November 24, 2020 by the GIAMPO Policy Board (Resolution 2020-5). 2021-2025 TIP – Approved on May 26, 2020 by the GIAMPO Policy Board (Resolution 2020-1) Grand Island Regular Session - 11/24/2020 Page 11 / 167 ---------- This Page was Intentionally Left Blank ---------- Grand Island Regular Session - 11/24/2020 Page 12 / 167 Table of Contents Acronyms ......................................................................................................................... 1 Introduction ...................................................................................................................... 2 Purpose of the TIP ............................................................................................................. 3 Federal Requirements for Transportation Improvement Programs............................................ 3 Time Period .................................................................................................................. 3 Public Comments ........................................................................................................... 3 Specific Project Information ............................................................................................ 3 Consistency with the Long Range Transportation Plan ....................................................... 3 Financial Constraint ....................................................................................................... 4 Process for Including Projects in the TIP........................................................................... 4 Status of Projects from the previous TIP ........................................................................... 4 Transportation Control Measures and Air Quality .............................................................. 4 The Metropolitan Planning Organization Structure ................................................................ 4 Current Membership of the Policy Board .......................................................................... 4 Current Membership of the Technical Advisory Committee ................................................ 5 Geographic Area the TIP Covers ......................................................................................... 5 Transportation Improvement Program (TIP) ......................................................................... 5 Statewide Transportation Improvement Program (STIP) ........................................................ 6 Conformance with Long Range Transportation Plan .............................................................. 6 Types of Projects included in the TIP ................................................................................... 7 Project Selection ............................................................................................................... 7 Maintenance and Operation of Current Transportation Systems............................................... 7 Public Transportation Project Prioritization Process ............................................................... 8 Financial Plan Statement .................................................................................................... 8 Public Involvement Process ................................................................................................ 8 Annual Listing of Projects .................................................................................................. 9 Congestion Mitigation and Air Quality (CMAQ) ................................................................... 9 National Performance Management Measures ....................................................................... 9 Safety ......................................................................................................................... 10 Grand Island Regular Session - 11/24/2020 Page 13 / 167 Infrastructure ............................................................................................................... 10 System Performance ..................................................................................................... 11 Transit Asset Management ............................................................................................ 11 Revising an Approved TIP/STIP ....................................................................................... 12 Amendments ............................................................................................................... 12 Administrative Modifications ........................................................................................ 12 Appendix A – Highway Projects……………………………………………………………… A-1 Appendix B – Transit Projects………………………………………………………………… B-1 Appendix C – Self-Certification of the MPO Transportation Planning Process……………… C-1 Appendix D – Comments........................................................................................................... D-1 Grand Island Regular Session - 11/24/2020 Page 14 / 167 1 | Page Acronyms AC Advanced Construction CMAQ Congestion Mitigation and Air Quality Program DOT Department of Transportation EA Earmark GIAMPO Grand Island Area Metropolitan Planning Organization HSIP Highway Safety Improvement Program FAST Act Fixing America’s Surface Transportation Act FHWA Federal Highway Administration FTA Federal Transit Administration MAP-21 Moving Ahead for Progress in the 21st Century Act MPO Metropolitan Planning Organization NDOT Nebraska Department of Transportation NHPP National Highway Performance Program STIP Statewide Transportation Improvement Program TAM Transit Asset Management TIP Transportation Improvement Program TPM Transportation Performance Management USDOT United States Department of Transportation YOE Year of Expenditure 3-C Continuing, Cooperative, and Comprehensive Grand Island Regular Session - 11/24/2020 Page 15 / 167 2 | Page Introduction The Transportation Improvement Program (TIP) for the Grand Island Area Metropolitan Planning Organization (GIAMPO) Metropolitan Planning Area is a staged, five-year schedule of transportation improvements using (or expected to use) Federal Highway Administration (FHWA) or Federal Transit Administration (FTA) funding, state funds, and other projects that have significant system impacts. The TIP is developed cooperatively by the GIAMPO Technical Advisory Committee and agencies within the GIAMPO Metropolitan Planning Area including City of Grand Island Public Works Department, Hall County Public Works Department, Merrick County Highway Department, Village of Alda, Nebraska Department of Transportation (NDOT), and others agencies as transportation related projects are developed. The GIAMPO Metropolitan Planning Area (MPA) is illustrated in Figure 1. Figure 1 – GIAMPO Metropolitan Planning Area Federal regulations require that each urbanized area, as a condition to receive federal capital or operating assistance, have a continuing, cooperative, and comprehensive (3-C) transportation planning process. The Metropolitan Planning Organization (MPO) is the organization designated to carry out the 3-C process which results in plans and programs that are consistent with the comprehensively planned development of the urbanized area. The TIP, along with the Long Range Transportation Plan, is a key element of this process. The Moving Ahead for Progress in the 21st Century Act (MAP-21) became law in 2012 which authorizes surface transportation programs and continues the basic planning requirements. The Fixing America’s Surface Transportation Act (FAST Act), became law in 2015 and continues the Metropolitan Planning programs. These programs continue the requirement for a cooperative, continuous, and comprehensive framework for making transportation investment decisions in metropolitan areas Grand Island Regular Session - 11/24/2020 Page 16 / 167 3 | Page and the joint oversight by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA). In order to remain eligible for federal transportation funding, the planning process must demonstrate that the GIAMPO Metropolitan Planning Area is in compliance with all federal requirements for metropolitan transportation planning. Purpose of the TIP The primary purpose of this document is to provide information to FHWA, FTA, NDOT, transportation agencies, and citizens regarding the TIP development process which: • Depicts the GIAMPO priorities for the expenditure of federal funds for all transportation funding categories by federal fiscal year including highway and public transportation projects; • Provides assurance to the FHWA that the project selection process has been carried out in accordance with federal requirements, Section 134 of Title 23, U.S. Code, as amended; and • Demonstrates that the TIP is financially feasible. Federal Requirements for Transportation Improvement Programs The planning and programming regulations include specific requirements for development and content of TIPs which are summarized below and addressed within this document. Time Period The TIP is to cover at least a four-year period and be updated at least every four years. The financial and project tables included in this document cover FY 2020–2024. NDOT and the MPOs have established an annual update cycle for the TIP. GIAMPO on an annual basis must submit an approved TIP to NDOT prior to June 15. Public Comments The TIP process is to provide opportunity for public review and comment on the TIP. GIAMPO’s transportation planning process allows for public involvement at various points within the transportation plan and program development. GIAMPO’s Public Participation Plan was adopted on November 24, 2015. Specific Project Information The TIP is to list capital and non-capital surface transportation projects to use a variety of federal funds or regionally significant projects requiring FHWA or FTA action. For each project or project phase the TIP shall include sufficient descriptive material including description, location, length, total cost, amount of federal funds, and responsible agency. Line items may be used for projects that are not considered to be of appropriate scale for individual identification. A complete detailed project listing is organized by project type for each project. Consistency with the Long Range Transportation Plan Each project or project phase in the TIP is to be consistent with the Long Range Transportation Plan, its goals, and performance measures. For each project included in the detailed project listing, GIAMPO staff cross-checks with the Long Range Transportation Plan to ensure consistency. Grand Island Regular Session - 11/24/2020 Page 17 / 167 4 | Page Financial Constraint The TIP is to include a financial plan including system level estimates of costs and revenue sources that are reasonably expected to be available to adequately operate and maintain federal-aid highways and public transportation. The financial plan is shown on page 14, which summarizes the TIP financial resources. Process for Including Projects in the TIP The TIP should specify the process to identify projects for inclusion in the TIP in coordination with the Long Range Transportation Plan. GIAMPO’s process annually coordinates with NDOT and local agencies to program projects in the TIP. Status of Projects from the previous TIP The TIP should list major projects from the previous TIP that were implemented or delayed. Each section lists projects under construction, completed, delayed, or moved out of the current programming period. Transportation Control Measures and Air Quality The Grand Island Area Metropolitan Planning Area is in conformance for air quality and the state does not require a State Implementation Plan for meeting Clean Air Act requirements. The Metropolitan Planning Organization Structure The governor designates the MPOs for urban areas in the state to be responsible for carrying out the urban transportation planning process through the development of a Long Range Transportation Plan and TIP. GIAMPO is the designated MPO for the Metropolitan Planning Area which includes the City of Grand Island, Village of Alda, and portions of Hall and Merrick Counties. The MPO is composed of elected and appointed officials representing local, state, and federal governments and agencies having interest or responsibility in land use planning, the quality and the location of transportation facilities, transportation safety issues on all roads, and better planning and designs. The Mayor of the City of Grand Island Area is the “Chair” of the GIAMPO Policy Board. Under the Mayor, the MPO functions through a committee structure consisting of the GIAMPO Policy Board, GIAMPO Technical Advisory Committee, subcommittees which may be created to assist the Technical Advisory Committee on various local transportation issues, and MPO administrative staff to establish and approve the Long Range Transportation Plan, TIP, and other work of the MPO. The GIAMPO Policy Board is composed of elected and appointed officials representing local, state, and federal governments or agencies having interest or responsibility in the comprehensive transportation planning process. Below is the current membership of the GIAMPO Policy Board and Technical Advisory Committee. Current Membership of the Policy Board Roger G. Steele, Mayor City of Grand Island Mitch Nickerson, Councilman City of Grand Island Julie Hehnke, Councilwoman City of Grand Island Clay Schutz, Councilman City of Grand Island Ron Peterson, District 7 Supervisor Hall County Board of Supervisors Gary Quandt, District 6 Supervisor Hall County Board of Supervisors Pat O'Neill, Chairman Hall County Planning Commission Kyle Schneweis, Director Nebraska Department of Transportation Grand Island Regular Session - 11/24/2020 Page 18 / 167 5 | Page Joseph Werning, Division Administrator FHWA Nebraska Division (Ex-Facto) Mokhtee Ahmad, Regional Administrator FTA Region VII (Ex-Facto) Current Membership of the Technical Advisory Committee Voting Jerom Janulewicz, City Administrator City of Grand Island Chad Nabity, Director Hall County Regional Planning Dept. John Collins, Public Works Director City of Grand Island Keith Kurz, Director of Engineering Services City of Grand Island Charley Falmlen, Transit Program Manager City of Grand Island Craig Wacker, Highway Planning Manager Nebraska Department of Transportation Wes Wahlgren, District 4 Engineer Nebraska Department of Transportation Steve Riehle, Public Works Director Hall County Mike Meyer, Highway Superintendent Merrick County Romana Schafer, Clerk/Treasurer Village of Alda Mike Olson, Executive Director Central Nebraska Regional Airport Non-Voting Justin Luther, Trans. Planner, Realty, Civil Rights Federal Highway Administration Logan Daniels, Transportation Program Specialist Federal Transit Administration - VII Daniel Nguyen, Community Planner Federal Transit Administration - VII Jodi Gibson, Local Projects Engineer Nebraska Department of Transportation VACANT, Assistant Planning Engineer Nebraska Department of Transportation Sara Thompson Cassidy Union Pacific Railroad Bentley Tomlin Burlington Northern Santa Fe Railroad Cindy Johnson Grand Island Chamber of Commerce Mary Berlie Grand Island Area Economic Development Corporation Patrick Brown, Finance Director City of Grand Island Shannon Callahan, Street Superintendent City of Grand Island Geographic Area the TIP Covers The Metropolitan Planning Area is the geographic area in which the metropolitan transportation planning process must be carried out. The boundaries of the Metropolitan Planning Area are determined by agreement between the Governor and the MPO. The GIAMPO Metropolitan Planning Area encompasses the City of Grand Island, Village of Alda, and portions of Hall and Merrick Counties. Transportation Improvement Program (TIP) The TIP is a programming document that identifies the timing and funding of all highway, bridge, transit, bicycle, and pedestrian transportation projects scheduled for implementation in the MPO planning area over a four -year period using federal transportation funds and is annually coordinated with the State-TIP process. According to federal regulations governing transportation planning, the TIP is to be a staged multi-year program of transportation improvement projects that "shall cover a period of not less than four years and be consistent with the urban area transportation plan." The TIP is directly related to the City’s, County's, and State’s Capital Improvement Programs which are brought forward at this time each year. The TIP identifies funding amounts by source Grand Island Regular Session - 11/24/2020 Page 19 / 167 6 | Page of funding, jurisdictional responsibility, type of project, and year of funding for these projects. This program is a listing of priority projects which are to be carried out within the next five fiscal years which include FY 2020-2021, 2021-2022, 2022-2023, 2023-2024 and 2024-2025. Projects planned for implementation beyond this time frame are not listed in this program since local funding may be tentative and federal funds for these projects cannot be obligated. The TIP reflects the priorities and direction of the region and its state and federal partners in the transportation planning process. Projects identified in the TIP must be consistent with the projects or goals and objectives identified in the current Long Range Transportation Plan for the Grand Island metropolitan region. The TIP is part of the MPO’s effort to establish and maintain the planning process required by the federal government as a condition for receipt of federal transportation funding. This program of projects depicts the MPO’s priorities for the expenditure of federal funds for all transportation funding categories by federal fiscal year including highway and public transportation projects. The TIP document may also include, for informational purposes, non-federally funded projects occurring in the planning area. The federal government regulations require the TIP to be updated and adopted by the local MPO at least every four years. Statewide Transportation Improvement Program (STIP) The TIP becomes part of the State Transportation Improvement Program (STIP) by reference and the frequency and cycle for updating the TIP is compatible with STIP development and approval process. NDOT and the Nebraska MPOs have established an annual update cycle. The STIP begins as a compilation of the regional TIPs that have been adopted by the MPOs and develops into a comprehensive list of all highway (state or local) and all transit (capital or operating) projects in urban and rural areas that propose to use federal funds. All federally funded projects proposed to begin between October 1st and September 30th from all of the regional TIPs across the state are included in this STIP including federally funded projects in rural areas. The STIP is updated every year and is to include a minimum four year listing of federal-aid projects for approval by FHWA and FTA. Conformance with Long Range Transportation Plan All projects were drawn from, or are consistent with, the GIAMPO Long Range Transportation Plan (Journey 2040), Regional Transit Needs Assessment and Feasibility Study, State Transportation Plans and Needs Studies, and the recommendations of local governments and citizens for the TIP. The projects reflect community goals and objectives and are assigned to the appropriate staging period based on the area’s priorities, the individual project urgency, and the anticipated funding capabilities of the participating governments. The TIP document was developed in conformance with the Long Range Transportation Plan for GIAMPO. A review was undertaken to ensure transportation projects programmed in the TIP were found to be consistent with the Long Range Transportation Plan. The Long Range Transportation Plan was adopted by GIAMPO on April 26, 2016. The development of the Long Range Transportation Plan included a needs assessment and financial analysis and discussed the social, economic, and environmental impacts to consider when developing new transportation projects, and where environmentally sensitive areas are located in relation to projects identified in the horizon years or 2025 and 2040. The Long Range Transportation Plan was transmitted to NDOT and to FHWA and FTA. Grand Island Regular Session - 11/24/2020 Page 20 / 167 7 | Page Types of Projects included in the TIP Federal regulations require that any transportation project within the Metropolitan Planning Area that is to be funded with U.S. Department of Transportation funds must be included in the TIP. The types of projects listed below are eligible for federal funding: a. Projects on the federal-aid system (road and bridge construction, reconstruction, resurfacing, restoration, rehabilitation, etc.). b. Public transportation (vehicle maintenance and operations, capital improvement projects, public transit system construction, etc.). c. Projects that are not on the federal-aid system, but may be eligible for federal funding for other reasons (e.g., bridge projects, bicycle and pedestrian facilities, etc.). The projects, however, must be linked to the transportation network. d. Regional projects requiring FHWA or FTA action or projects having significant regional impacts. Project Selection GIAMPO’s process for including projects in the TIP is the means by which projects move from the current Long Range Transportation Plan (LRTP) into the TIP for implementation. This process entails annual coordination with NDOT and local agencies to identify projects for programming in the TIP. Projects listed in the TIP typically originate in the LRTP developed by the MPO in cooperation with the respective implementing agencies involved in the planning process. Implementing agencies carry out the LRTP’s specific elements through the TIP process. As a result, the TIP serves as a strategic management tool to accomplish the objectives of the Long Range Transportation Plan. Project prioritization is an important element of the TIP, especially since the demand for federal-aid transportation projects usually exceeds the level of federal funds available for use. State highway projects in the TIP have been prioritized by NDOT. Local federal-aid improvement projects programmed by the City of Grand Island, Hall County, Merrick County Village of Alda, and coordinating agencies have been dependent on the availability of competitive funding using the federal Highway Safety Improvement Program, Set Aside from Surface Transportation Block Grant Program (Transportation Alternatives), and FTA funds. Other selected projects are accomplished through a coordinated effort among all parties to advance projects which preserve the existing system, increase safety and efficiency of the transportation system, improve vehicle mobility and connectivity, protect and enhance the environment, and support quality of life. Readiness to proceed and financial capacity is also considered in project selection. Maintenance and Operation of Current Transportation Systems The highest priority in the selection of projects for the TIP is to ensure the adequate reconstruction, maintenance, and operation of the current transportation system. NDOT is programming two (2) projects for highway resurfacing, one (1) project for repairs/overlays to three US-30 bridges, and construction of a 4-lane divided roadway on new alignment for a section of US-30. The City of Grand Island is programming one (1) project programmed for safety and operational improvements at the Broadwell Avenue, State Street, and Eddy Street intersection and one (1) project to widen a section of Old Potash Highway and three (3) projects to widen sections of North Road and a (1) Planning and Environmental on Broadwell Ave./ UPRR. Grand Island Regular Session - 11/24/2020 Page 21 / 167 8 | Page Public Transportation Project Prioritization Process Public transportation projects are funded with a mix of local, state, and federal funds. The public transportation element of the TIP includes projects for the City of Grand Island’s Transit Program that collectively constitutes the Program of Projects (POP) for the City of Grand Island’s Transit Program. Approval of the TIP includes the approval of the POP for the City of Grand Island’s Transit Program. The public involvement procedures used for TIP development and amendments are used to satisfy the POP requirements for FTA Section 5307 (urban) funding. In 2012, the City of Grand Island became the designated recipient to receive FTA Section 5307 funds. In 2013, the City of Grand Island and Hall County entered into an interlocal agreement for Hall County to continue to provide public transit services using unexpended FTA Section 5311(rural) funds during a transitional period. In April 2016, the City of Grand Island approved an interlocal agreement where the City of Grand Island would provide public transit services within the City of Grand Island and Hall County through a contract with a public transportation services provider up to a three year period. This interlocal agreement was renewed in April 2019 for a term of one year with an automatic renewal thereafter for successive terms of one year each unless either the City of Grand Island or Hall County provides written notice not less than 90 days prior to the termination of the then current term. In December 2017, GIAMPO completed a Regional Transit Needs and Feasibility Study, and it recommended a preferred alternative for a five year planning horizon within the Grand Island urbanized area. This plan will be used by the City of Grand Island Transit Program to plan and program transit projects in the TIP. Financial Plan Statement The projects identified in the TIP are financially constrained, meaning they can be implemented using current and proposed revenue sources based on the programs contained in the TIP. The expected and anticipated revenue sources are, therefore, reasonably expected to be in place when needed. Revenues for federally funded projects during each year are shown in the Financial Plan on page 14. Public Involvement Process The transportation planning process allows for public involvement at various points within the transportation plan and program development. This involves a series of steps from the adoption of the MPO Long Range Transportation Plan that is coordinated with the programming of projects and again for the actual construction of the transportation facilities. The critical decision points in the transportation planning process are: 1) the development of at least a 20 year transportation plan, 2) the street improvement program which identifies priorities for planned projects, 3) the development of capital improvement programs for a period of four to six years, 4) project design and project construction. The first two steps are included in the long range planning process, the third step consolidates the capital improvement programs of the City of Grand Island, Hall County, Merrick County, Village of Alda, and NDOT with the MPO TIP and the last step is the specific project design and development. The City of Grand Island, Hall County, Merrick County, and Village of Alda each have an established procedure for adopting improvement programs. Their processes include review by the County Planning Commission for compliance with the Comprehensive Plan and formal advertised public hearings before the Planning Commission and City Council or County Board. The consolidation of these improvement programs is coordinated in the TIP as reviewed by the GIAMPO Technical Advisory Committee before it is released for the public review and comment Grand Island Regular Session - 11/24/2020 Page 22 / 167 9 | Page period. The public comments are summarized, including how the comments were addressed, and incorporated in the TIP. The GIAMPO Policy Board reviews, approves, and submits the TIP to NDOT for inclusion in the STIP. Annual Listing of Projects Pursuant to the provisions of 23 U.S.C. 134(j)(7)(B) and 49 U.S.C. 5303(c)(5)(B), the MPO has published an annual listing of projects for which federal funds have been obligated in the preceding year. These are listed in the TIP by jurisdiction within each section. The published document is available for public review from the MPO and on the MPO website under the TIP Section. Congestion Mitigation and Air Quality (CMAQ) Federal legislation provides funds to be utilized in the Clean Air Act for non-attainment and maintenance areas for transportation programs and projects that contribute to attainment of National Ambient Air Quality Standards. Since the GIAMPO Metropolitan Planning Area is in compliance with the latest air quality standards, the MPO does not specifically program for CMAQ funding. National Performance Management Measures With the passing of MAP-21 transportation bill, and continuing in the FAST Act, State departments of transportations (State DOT) and MPOs are required to use a performance based planning and programming approach as part of the Transportation Performance Management (TPM) program. TPM is defined as a strategic approach that uses system information to make investment and policy decisions to achieve national performance goals. As part of TPM, FHWA and FTA issued Final Rules that include National Performance Management Measures at the system level that the State DOTs and MPOs are required to incorporate into their planning processes. The applicable National Performance Management Measures to MPOs include the following: • Safety (PM-1). Highway Safety Improvement Program/Safety Performance Management Measures [23 CFR § 924, 23 CFR § 490] • Infrastructure (PM-2). Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program [23 CFR § 490] • System Performance (PM-3). Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and Congestion Mitigation and Air Quality Improvement Program [23 CFR § 490] • Transit Asset Management (TAM) is established to evaluate the state of good repair of transit provider capital assets for safety and operations [49 CFR § 625, 630]. Each of the above National Performance Management Measures consists of a series of performance measures and corresponding target setting requirements. When State DOTs and/or transit providers have set targets, MPOs must establish performance targets at the regional level within 180 days. MPOs have the option to set its own regional targets, or to support the targets established by State DOTs and/or transit providers. Grand Island Regular Session - 11/24/2020 Page 23 / 167 10 | Page Safety FHWA published the Highway Safety Improvement Program and Safety Performance Management Measures (PM-1) Final Rules in the Federal Register on March 15, 2016. The Safety Performance Management Measures rule supports the Highway Safety Improvement Program (HSIP), as it establishes five safety performance measures to carry out the HSIP and to assess serious injuries and fatalities on all public roads. State DOTs are required to establish safety (HSIP) targets for all five performance measures by August 31 of each year. GIAMPO has agreed to support the state’s annual (CY 2020) safety performance targets set in August 2019. The targets are: GIAMPO supports these targets by reviewing and programming HSIP projects within the Metropolitan Planning Area. Working in partnership with local agencies, NDOT safety investments were identified and programmed which will construct effective countermeasures to reduce traffic fatalities and serious injuries. NDOT projects chosen for HSIP investment are based on crash history, roadway characteristics, and the existence of infrastructure countermeasures that can address the types of crashes present. Infrastructure Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program (PM-2) was identified in the FHWA Final Ruling published in the Federal Register on January 18, 2017 (82 FR 5886). This rule establishes six performance measures to assess the condition of pavement and bridges on the National Highway System (NHS) to carry out the National Highway Performance Program. State DOTs are required to establish pavement and bridge condition targets by May 20 every four years. GIAMPO has agreed to support the state’s 4-year performance period (CY 2018-2021) pavement and bridge performance targets set in May 2018. The targets are: GIAMPO will review and program pavement and bridge projects within the Metropolitan Planning Area to contribute toward the accomplishment of these targets. Performance Measure Target Number of Fatalities 239 Rate of Fatalities per 100 million vehicle miles traveled (VMT) 1.14 Number of Serious Injuries 1,442 Rate of Serious Injuries per 100 million VMT 6.8 Number of Non-motorized Fatalities and Non- motorized Serious Injuries 133 Performance Measure Target % of Interstate pavements in Good condition At least 50% % of Interstate pavements in Poor condition No more than 5% % of non-Interstate NHS pavements in Good condition At least 40% % of non-Interstate NHS pavements in Poor Condition No more than 10% % of NHS bridges by deck area classified as in Good condition At least 55% % of NHS bridges by deck area classified as in Poor condition No more than 10% Grand Island Regular Session - 11/24/2020 Page 24 / 167 11 | Page System Performance Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and Congestion Mitigation and Air Quality Improvement Program (PM-3) was identified in the FHWA Final Ruling, published in the Federal Register on January 18, 2017 (82 FR 5970). This rule establishes performance measures to assess the performance of the Interstate and non-Interstate NHS to carry out the National Highway Performance Program, freight movement on the Interstate system to carry out the National Highway Freight Program, and traffic congestion and on-road mobile source emissions for the purpose of carrying out the Congestion Mitigation and Air Quality Improvement (CMAQ) Program. There are two performance measures to assess system performance of the NHS, one performance measure to assess freight movement on the Interstate system, two performance measures to assess traffic congestion under the CMAQ program, and one performance measure to assess total emissions reductions by applicable pollutants under the CMAQ program. State DOTs are required to establish system performance, freight, and CMAQ targets by May 20 every four years. GIAMPO has agreed to the support the state’s 4-year performance period (CY 2018-2021) system performance and freight performance targets set in May 2018 (Nebraska exempt from CMAQ measures this performance period). The targets are: GIAMPO will review and program system performance and freight projects within the Metropolitan Planning Area to contribute toward the accomplishment of these targets. Transit Asset Management FTA issued a Final Rule on transit asset management (TAM) plans to evaluate the state of good repair of transit provider capital assets for safety and operations. Recipients of public transit funds–which include states, local authorities, and public transportation operators–are required to establish targets for state of good repair performance measures; to develop transit asset management and transit safety plans; and to report on their progress toward achieving targets. Public transportation operators are directed to share information with MPOs and states so that all plans and performance reports are coordinated. The Rule, “Transit Asset Management; National Transit Database,” went into effect on July 26, 2016 with the TAM plan due for transit by October 1, 2018. Transit target setting repeats annually and plans are updated every four years. The City of Grand Island (transit provider) participates in a group TAM plan, which is sponsored by NDOT. GIAMPO has agreed to establish state of good repair performance targets, which are the same targets established by NDOT and the City of Grand Island. NDOT set its targets on January 1, 2017, and the City of Grand Island set its targets on May 23, 2017. The targets are: Performance Measure Target % of Person-Miles Traveled on the Interstate that are Reliable 98.6% % of Person-Miles Traveled on the non-Interstate NHS that are Reliable 92.6% Freight Reliability 1.10 Category Class Default *ULB Performance Target Rolling Stock Cutaway bus 10 years 50% of fleet exceeds default ULB Minivan 8 years 50% of fleet exceeds default ULB Van 8 years 50% of fleet exceeds default ULB Grand Island Regular Session - 11/24/2020 Page 25 / 167 12 | Page GIAMPO supports these targets by reviewing and programing transit projects relating to capital assets within the Metropolitan Planning Area. Revising an Approved TIP/STIP Revisions are changes to a TIP/STIP that occur between their annual publications. There are two types of changes that occur under the umbrella of revision. The first is a major revision or “Amendment”. The second is a minor revision or “Administrative Modification”. Amendments An amendment is a revision to a TIP/STIP that involves a major change to a project included in the TIP/STIP. Amendments requires public review and comment and demonstration of fiscal constraint. There are four main components that can be used to determine whether a project change rises to the level of an amendment: • Project costs: Amendments are required whenever the federal-aid amount changes by 20% or $2 million, whichever is greater. For computing the % change, standard rounding procedures will be used; 19.50% and greater is considered to be 20% and therefore would require an amendment. • Additions/Deletions: Projects or phases of projects which are added or deleted from the first four years of the TIP/STIP will be processed as amendments (excluding grouped projects). • Funding sources: Adding federal funding sources or changing from one federal funding category to another (including converting advanced construction) will require an amendment. • Scope and termini changes: Substantial changes to project scope shown in the approved STIP or project termini changes greater than 0.25 mile will require an amendment. Administrative Modifications A minor revision to a TIP or STIP is an administrative modification. It includes minor changes to projects, including projects using advanced construction (AC) procedures, already included in the TIP. Administrative modifications may be made at any time and do not require public review or Policy Board action. However, GIAMPO must demonstrate financial constraint. This includes changes such as clarifying project descriptions, reducing project costs, minor adjustments to project budgets or clerical mistakes. The following components should be used to determine if a change can be processed as an administrative modification: Equipment Automobile 8 years 75% of fleet exceeds default ULB Facilities Admin/Storage 40 years 70% of facilities rated under 3.0 on TERM scale Grand Island Regular Session - 11/24/2020 Page 26 / 167 13 | Page • Project costs: Projects in which the federal-aid and/or AC amount has been changed by less than 20% or $2 million, whichever is greater, can be processed with an administrative modification. For purposes of this calculation federal-aid and AC amounts will be combined. • Additions/Deletions: Projects or phases of projects added to group listings explained earlier will be processed as administrative modifications. • Schedule changes: Changes in schedules to projects which are included in the first four years of the TIP/STIP will be considered administrative modifications • Funding sources: Redistribution of federal funding or AC among funding sources already listed with the project can be done with an administrative modification. • Scope and termini changes: Minor changes to project scope and termini changes of less than 0.25 mi. can be made with an administrative modification. Project termini not consistent with the Long Range Transportation will require an amendment. Grand Island Regular Session - 11/24/2020 Page 27 / 167 14 | Page Grand Island Regular Session - 11/24/2020 Page 28 / 167 A-1 | PageGrand Island Area Metropolitan Planning Organization Transportation Improvement Program FY 2021-2025 Appendix A – Highway ProjectsGrand IslandRegular Session - 11/24/2020Page 29 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for FY 2020‐2024State Agency Sponsored ProjectsTIP #:2016‐004State ID:41704Project #:S‐30‐4(1046)Project Name:US‐281 West, Grand IslandDescription4 lane divided roadway on new alignmentHWY:  US‐30Length (SLM):  3.7Project Sponsor:  NDOTDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2022 Local Grand Island $1472022 State NDOT $2,2042023 Local Grand Island $5082023 State NDOT $3,8632024 Local Grand Island $2,1902024 State NDOT $23,054Total Project Estimate$31,966Notes:This project was moved from FY 2022 to FY 2024.PELocation:  US‐30 from 1.4 mi west of Grand Island to 0.4 mi west of US‐281. Begin RP ‐ 308.84PhasePEROWROWCONST/CECONST/CE______________________A-1 | PageGrand IslandRegular Session - 11/24/2020Page 30 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for FY 2020‐2024State Agency Sponsored ProjectsTIP #:2016‐008State ID:42776Project #:NH‐30‐4(162)Project Name:In Grand Island BridgesDescriptionHWY:  US‐30Length (SLM):  0.4Project Sponsor:  NDOTDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2019 State NDOT$2902020 State NDOT$272021 Local Grand Island$1972021 Federal NHPP$4,0072021 State NDOT$969Total Project Estimate$5,490Notes:PE in YOE 2019 and ROW in YOE 2020 is not reflected in Financial Constraint Table. This project is in progress.Location:  Three US‐30 Bridges in Grand Island (Jct US‐30/US‐281/N‐2 bridge and from Old Lincoln Hwy to Grant St), RP ‐ 313.66PEROWCONST/CECONST/CEPhaseCONST/CE3‐bridge repair/overlays, sealing, approach slabs, mill, resurface roadway______________________A-2 | PageGrand IslandRegular Session - 11/24/2020Page 31 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for FY 2020‐2024State Agency Sponsored ProjectsTIP #:2018‐001State ID:42787Project #:NH‐2‐4(112)Project Name:Cairo ‐ Grand IslandDescriptionResurfacingHWY:  N‐2Length (SLM):  12.5Project Sponsor:  NDOTDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2019State NDOT$5852020State NDOT$02021Local Grand Island$2,0802021Federal NHPP$11,3362021State NDOT$1,667Total Project Estimate$15,668Notes:PE in YOE 2019 and ROW in YOE 2020 is not reflected in Financial Constraint Table. This project is in progress.CONST/CECONST/CELocation:  N‐2 from Cairo southeast to US‐281 in Grand Island, RP ‐ 343.73PhasePEROWCONST/CE______________________A-3 | PageGrand IslandRegular Session - 11/24/2020Page 32 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for FY 2020‐2024State Agency Sponsored ProjectsTIP #:2020‐001State ID:42819Project #:NH‐34‐4(134)Project Name:In Grand Island & South (SB)DescriptionResurfacingHWY:  US‐34Length (SLM):  5.4Project Sponsor:  NDOTDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2021 State NDOT $4182022 Federal NHPP $4,0702022 State NDOT $1,018Total Project Estimate$5,506Notes:Project is in progress.CONST/CELocation:  US‐34 from 2.2 mi south of Grand Island north to N Jct US‐281 / W Jct N‐2, RP ‐ 226.74PhasePECONST/CE______________________A-4 | PageGrand IslandRegular Session - 11/24/2020Page 33 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for FY 2020‐2024State Agency Sponsored ProjectsTIP #:2020‐002State ID:42891Project #:MISC‐40(65)Project Name:District 4 Wetland BankDescriptionHWY:Length (SLM):  0.0Project Sponsor:  NDOTDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2021 State NDOT $2302022 State NDOT $898Total Project Estimate$1,128Notes:This project is in progress.Survey, design, construct and monitor a wetland mitigation siteLocation:  Adjacent to existing Mormon Island Mitigation Bank, RP ‐ 0.00PhasePECONST/CE______________________A-5 | PageGrand IslandRegular Session - 11/24/2020Page 34 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for FY 2020‐2024State Agency Sponsored ProjectsTIP #:2020‐003State ID:42894Project #:ELEC‐80‐6(1047)Project Name:West Grand Island InterchangeDescriptionHWY:  I‐80Length (SLM):  1.5Project Sponsor:  NDOTDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2019 State NDOT $272020 State NDOT $1,018Total Project Estimate$1,045Notes:PE in YOE 2019 and CONST/ CE in YOE 2020 is not reflected in Financial Constraint Table. This project is in progress.CONST/CEBuild new high mast lighting towers, install buried cable & control boxesLocation:  I‐80 at the Grand Island Interchange, RP ‐ 311.50PhasePE______________________A-6 | PageGrand IslandRegular Session - 11/24/2020Page 35 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for FY 2020‐2024State Agency Sponsored ProjectsTIP #:2021‐008State ID:42911Project #:HSIP‐80‐7(170)  Project Name:Grand Island Area BridgesDescriptionHWY:  I‐80Length (SLM):  4.52Project Sponsor:  NDOTDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2020PE State NDOT$82021Const/CEState NDOT$1762021Const/CEFederal HSIP$1,585Total Project Estimate$1,770Notes: PE in YOE 2020 is not reflected in Financial Constraint Table. This project is in progress.Add High Friction Surface Treatment to bridges and Horizontal curves on I80Location:  (13)Bridges on I80 near the Grand Island InterchangePhase______________________A-7 | PageGrand IslandRegular Session - 11/24/2020Page 36 / 167 Status of Previous Years for State Agency Sponsored ProjectsProject Sponsor TIP ID Project Name Location Description YOE PhaseFunding DescriptionEstimate ($1,000) Status2022 PE Grand Island $1472022 PE NDOT $2,2042023 ROW Grand Island $5082023 ROW NDOT $3,8632024 CONST/CE Grand Island $2,1902024 CONST/CE NDOT $23,0542019 PE NDOT $2902020 ROW NDOT $272021 CONST/CE Grand Island $1972021 CONST/CE NHPP $4,0072021 CONST/CE NDOT $9692019 PE NDOT $5852020 ROW NDOT $02021 CONST/CE Grand Island $2,0802021 CONST/CE NHPP $11,3362021 CONST/CE NDOT $1,6672021 PE NDOT $4182022 CONST/CE NHPP $4,0702022 CONST/CE NDOT $1,0182021 PE NDOT $2302022 CONST/CE NDOT $8982019 PE NDOT $272020 CONST/CE NDOT $1,0182020 PE NDOT $82021 Const/CE     NDOT $1762021 Const/CE     HSIP $1,585Project was let.NDOT2021‐008 Grand Island Area Bridges(13)Bridges on I80 near the Grand Island InterchangeAdd High Friction Surface Treatment to bridges and Horizontal curves on I80Project currently scheduled for a 2/25/21 letting2020‐003 West Grand Island Interchange  I‐80 at the Grand Island Interchange, RP ‐ 311.50Build new high mast lighting towers, install buried cable & control boxesNDOTProject currently scheduled for 8/25/22 lettingNDOT2020‐002 District 4 Wetland BankAdjacent to existing Mormon Island Mitigation Bank, RP ‐ 0.00Survey, design, construct and monitor a wetland mitigation siteProject currently scheduled for 08/26/21 letting. FY 20222020‐001 In Grand Island & South (SB)US‐34 from 2.2 mi south of Grand Island north to N Jct US‐281 / W Jct N‐2, RP ‐ 226.74ResurfacingNDOTNDOTNDOT 2016‐004 US‐281 West, Grand IslandUS‐30 from 1.4 mi west of Grand Island to 0.4 mi west of US‐281. Begin RP ‐ 308.642018‐001 Cairo ‐ Grand IslandNDOT 2016‐008 In Grand Island BridgesThree US‐30 Bridges in Grand Island (Jct US‐30/US‐281/N‐2 bridge and from Old Lincoln Hwy to Grant St), RP ‐ 313.663‐bridge repair/overlays, sealing, approach slabs, mill, resurface roadwayN‐2 from Cairo southeast to US‐281 in Grand Island, RP ‐ 343.73ResurfacingProject is scheduled for a 8/26/21 lettingProject scheduled for 8/24/23 letting FY 2024Project has been delivered to conltracts and is currently scheduled for a 8/26/21 letting4 lane divided roadway on new alignment______________________A‐8 | PageGrand IslandRegular Session - 11/24/2020Page 37 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for 2020‐2024Local Agency Sponsored ProjectsTIP #:2018‐003State ID:42863Project #:HSIP‐5409(3)Project Name:5‐Points Intersection ImprovementsDescriptionIntersection Improvements (Roundabout)HWY:  Broadwell AvenueLength (SLM):  0.4Project Sponsor:  Grand IslandDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2019Local Grand Island$802019Federal HSIP$3182021Local Grand Island$1012021Federal HSIP$4062021Local Grand Island$5032021Federal HSIP$2,012Total Project Estimate$3,420Notes:PE in YOE 2019 is not reflected in Financial Constraint Table. This project is in progress.PhaseLocation:  Broadwell Avenue, State Street, and Eddy Street intersectionCONST/CEROWCONST/CEPEPEROW______________________ A‐9 | PageGrand IslandRegular Session - 11/24/2020Page 38 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for 2020‐2024Local Agency Sponsored ProjectsTIP #:2020‐004State ID: Project #: Project Name:Old Potash Highway ImprovementsDescriptionHWY:  Old Potash HighwayLength (SLM):  1.8Project Sponsor:  Grand IslandDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2019Local Grand Island$1,7132020Local Grand Island$2,0802021Local Grand Island$9,1622022Local Grand Island$4,975Total Project Estimate$17,930Notes:PE in YOE 2019 and 2020 is not reflected in Financial Constraint Table. This project is in progress.Widening and Intersection Improvements, including an extension of Claude RoadLocation:  Old Potash Highway from North Road to Webb Road and Claude Road from Old Potash Highway to Faidley AveCONST/CEPhasePEROWCONST/CE______________________ A‐10 | PageGrand IslandRegular Session - 11/24/2020Page 39 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for 2020‐2024Local Agency Sponsored ProjectsTIP #:2021‐004State ID: Project #:Project Name:Broadwell Ave./ UPRR ‐ Planning & EnvironmentalDescriptionHWY:  Broadwell AvenueLength (SLM):  1.0Project Sponsor:  Grand IslandDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2019Local Grand Island$882020Local Grand Island$2842021Local Grand Island$40Total Project Estimate$412Notes:Planning in YOE 2019 and 2020 is not reflected in Financial Constraint Table. This project is in progress.PhasePlanningPlanningPlanningBroadwell Ave./ UPRR ‐ Planning & Environmental Study.Location:  Broadwell Ave. ‐ Faidley Ave. to Anna St.______________________ A‐11| PageGrand IslandRegular Session - 11/24/2020Page 40 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for 2020‐2024Local Agency Sponsored ProjectsTIP #:2021‐005State ID: Project #:Project Name:North Road Improv. ‐ Highway 2 to Capital AveDescriptionHWY:  North RoadLength (SLM):  .75Project Sponsor:  Grand IslandDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2019Local Grand Island$4732019Local Grand Island$402020Local Grand Island$2882020Local Grand Island$2,8352021Local Grand Island$512021Local Grand Island$500Total Project Estimate$4,188Notes:PE and ROW in YOE 2019 and PE and Construction in YOE 2020 is not reflected in Financial Constraint Table. This project is in progress.PhaseCurb and gutter roadway section with associated sidewalk, traffic control, drainage improvements.Location:  North ‐ Highway 2 to Capital Ave.PECONST/CEPEROWCONST/CEPE______________________ A‐12 | PageGrand IslandRegular Session - 11/24/2020Page 41 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for 2020‐2024Local Agency Sponsored ProjectsTIP #:2021‐006State ID: Project #:Project Name:North Road Improv. ‐ Capital Ave. to 13th St.DescriptionHWY:  North RoadLength (SLM):  1.0Project Sponsor:  Grand IslandDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2019Local Grand Island$1002020Local Grand Island$2002020Local Grand Island$802021Local Grand Island$6362021Local Grand Island$2,8542022Local Grand Island$2,854Total Project Estimate$6,724Notes:YOE 2019 and 2020 is not reflected in Financial Constraint Table. This project is in progress.PECONST/CEROWCONST/CEPhasePEPECurb and gutter roadway section with associated sidewalk, traffic control, drainage improvements.Location:  North ‐ Capital Ave. to 13th St.______________________ A‐13 | PageGrand IslandRegular Session - 11/24/2020Page 42 / 167 Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for 2020‐2024Local Agency Sponsored ProjectsTIP #:2021‐007State ID: Project #:Project Name:North Road Improv. ‐ 13th St. to Old Potash HWYDescriptionHWY:  North RoadLength (SLM):  1.0Project Sponsor:  Grand IslandDistrict #:  4A/Q Status:  ExemptYOEFund TypeFund DescriptionEstimate ($1,000)2019Local Grand Island$902020Local Grand Island$1002021Local Grand Island$5302021Local Grand Island$1002022Local Grand Island$5382022Local Grand Island$3,0002023Local Grand Island$1,800Total Project Estimate$6,158Notes:YOE 2019 and 2020 is not reflected in Financial Constraint Table. This project is in progress.PEPEPECONST/CEROWPECONST/CEPhaseCurb and gutter roadway section with associated sidewalk, traffic control, drainage improvements.Location:  North ‐ 13th St. to Old Potash HWY______________________ A‐14 | PageGrand IslandRegular Session - 11/24/2020Page 43 / 167 Status of Previous Years for Local Agency Sponsored ProjectsProject Sponsor TIP ID Project NameLocationDescriptionYOE PhaseFunding DescriptionFederal ($1,000) Status2017 PE Grand Island $162017 PE HSIP $1442018 CONST/CE Grand Island $1,1152018 CONST/CE HSIP $1242019 PE Grand Island $802019 PE HSIP $3182020 ROW Grand Island $1012020 ROW HSIP $4062021 CONST/CE Grand Island $5032021 CONST/CE HSIP $2,012Grand IslandLetting was scheduled for September 30, 2021Intersection ImprovementsBroadwell Avenue, State Street, and Eddy Street intersection5‐Points Intersection Improvements2018‐003Construction Completed on October 2019Grand Island 2016‐010 Grand Island ‐ Stolley Park ReconfigurationFrom Webb Road to S. Locust StreetReconfigure Stolley Park Road to 3, 4, and 5 lane sections ‐ FHWA Road Diet Initiative______________________ A‐15 | PageGrand IslandRegular Session - 11/24/2020Page 44 / 167 B-1 | PageGrand Island Area Metropolitan Planning Organization Transportation Improvement Program FY 2021-2025 Appendix B – Transit ProjectsGrand IslandRegular Session - 11/24/2020Page 45 / 167 TIP #:2021‐001State ID:N/AProject Name:Operations ‐ Urban Transit Operating AssistanceLength (SLM):N/AProject #: Project Sponsor:Grand IslandDistrict #:4A/Q Status:ExemptHWY:N/ALocation:Grand Island Urbanized AreaYOEPhaseFund TypeEstimate ($1,000)Description:2021 OPR Federal 5307$4972021 OPR LocalGrand island$374*2022 OPR Federal 5307$5992022 OPR LocalGrand island$385*2023 OPR Federal 5307$5382023 OPR LocalGrand island$376*2024 OPR Federal 5307$5542024 OPR Federal Grand island$388*Total Project Estimate$3,711Notes:* This amount is subject to decrease because the City of Grand Island may receive state funds from the Nebraska Public Transportation Assistance Program.(Includes the Program of Projects for the City of Grand Transit Program)Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for FY 2021‐2025Local Agency Sponsored ProjectsFund DescriptionYOE 2021: FTA 5307 ‐ $497 (Operating ‐ $304, Bus Support Equipment/Facilities ‐ $36, Other Capital Items (Bus) ‐ $157) and Local ‐ $374 (Operating ‐ $304, Bus Support Equipment/Facilities ‐ $9, Other Capital Items (Bus) ‐ $61).YOE 2022: FTA 5307 ‐ $599 (Operating ‐ $313, Bus Support Equipment/Facilities ‐ $37, Other Capital Items (Bus) ‐ $249) and Local ‐ $385 (Operating ‐ $313, Bus Support Equipment/Facilities ‐ $9, Other Capital Items (Bus) ‐ $62)YOE 2023: FTA 5307 ‐ $538 (Operating ‐ $323, Bus Support Equipment/Facilities ‐ $38, Other Capital Items (Bus) ‐ $177) and Local ‐ $376 (Operating ‐ $323, Bus Support Equipment/Facilities ‐ $10, Other Capital Items (Bus) ‐ $44)Operating assistance for transit services in the Grand Island Urbanized Area. Includes costs associated with operating, bus support equipment/facilities (i.e., rideshare, vehicle equipment), and other capital items relating to bus activities (i.e., preventative maintenance, third‐party contracting, federal administration (City Transit Program Manager), training expenses)YOE 2024: FTA 5307 ‐ $554 (Operating ‐ $348, Bus Support Equipment/Facilities ‐ $39, Other Capital Items (Bus) ‐ $167) and Local ‐ $388 (Operating ‐ $336, Bus Support Equipment/Facilities ‐ $10, Other Capital Items (Bus) ‐ $42)______________________ B‐2 | PageGrand IslandRegular Session - 11/24/2020Page 46 / 167 (Includes the Program of Projects for the City of Grand Transit Program)Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for FY 2021‐2025Local Agency Sponsored ProjectsTIP #:2021‐002State ID:N/AProject Name:Operations ‐ Rural Transit Operating AssistanceLength (SLM):N/AProject #:2018‐005Project Sponsor:Hall CountyDistrict #:4A/Q Status:ExemptHWY:N/ALocation:Areas outside of the Grand Island Urbanized Area in Hall CountyYOEPhaseFund TypeEstimate ($1,000)Description:2021 OPR Federal 5311$202021 OPR StateNDOT$92021 OPR LocalHall County$92022 OPR Federal 5311$262022 OPR StateNDOT$92022 OPR LocalHall County$92023 OPR Federal 5311$222023 OPR StateNDOT$92023 OPR LocalHall County$92024 OPR Federal 5311$232024 OPR StateNDOT$92024 OPR LocalHall County$9Total Project Estimate$164Notes:Fund DescriptionOperating assistance for transit services in areas outside of the Grand Island Urbanized Area______________________ B‐3 | PageGrand IslandRegular Session - 11/24/2020Page 47 / 167 (Includes the Program of Projects for the City of Grand Transit Program)Grand Island Area Metropolitan Planning OrganizationTransportation Improvement Program for FY 2021‐2025Local Agency Sponsored ProjectsTIP #:2021‐003State ID:N/AProject Name:CARES Funding ProjectsLength (SLM):N/AProject #: Project Sponsor:Grand IslandDistrict #:4A/Q Status:ExemptHWY:N/ALocation:Grand Island Urbanized AreaYOEPhaseFund TypeEstimate ($1,000)Description:2021 PLANNING Federal 5307$1002021 PLANNING LocalGrand Island$02021 DESIGN Federal 5307$02021 DESIGN LocalGrand Island$02021 CAP Federal 5307$1,5002021 CAP LocalGrand Island$182021 CAP Federal 5311$02021 CAP State5339$902021 CAP LocalHall County$0Total Project Estimate$1,708Notes:Fund DescriptionPlanning and capital acquisition for projects making use of CARES funding.______________________ B-4 | PageGrand IslandRegular Session - 11/24/2020Page 48 / 167 ______________________ B-5 | Page Status of Previous Years for Local Agency Sponsored Projects Project Sponsor TIP ID Project Name Location Description YOE Phase Funding Description Federal ($1,000)Status 2021 OPR 5307 $497 2021 OPR Grand island $374 2022 OPR 5307 $599 2022 OPR Grand island $385 2023 OPR 5307 $538 2023 OPR Grand island $376 2024 OPR 5307 $554 2024 OPR Grand island $388 2021 OPR 5311 $20 2021 OPR NDOT $9 2021 OPR Hall County $9 2022 OPR 5311 $26 2022 OPR NDOT $9 2022 OPR Hall County $9 2023 OPR 5311 $22 2023 OPR NDOT $9 2023 OPR Hall County $9 2024 OPR 5311 $23 2024 OPR NDOT $9 2024 OPR Hall County $9 2021 PLANNING 5307 $100 2021 PLANNING Grand Island $0 2021 DESIGN 5307 $0 2021 DESIGN Grand Island $0 2021 CAP 5307 $1,500 2021 CAP Grand Island $18 2021 CAP 5311 $0 2021 CAP 5339 $90 2021 CAP Hall County $0 Grand Island Urbanized Area Facility planning and acquisition of facility for transit operations and vehicle storage Estimate added for YOE 2021 Grand Island 2021-003 Transit Facility Estimate revised for YOE 2021. Estimate added for YOE 2022 - 2024. Grand Island 2021-001 Operations - Urban Transit Operating Assistance Grand Island Urbanized Area Operating assistance for transit services in the Grand Island Urbanized Area Estimate revised for YOE 2021. Estimate added for YOE 2022 - 2024. Grand Island 2021-002 Operations - Rural Transit Operating Assistance Areas outside of the Grand Island Urbanized Area in Hall County Operating assistance for transit services in areas outside of the Grand Island Urbanized Area Grand Island Regular Session - 11/24/2020 Page 49 / 167 C-1 | PageGrand Island Area Metropolitan Planning Organization Transportation Improvement Program FY 2021-2025 Appendix C – Self-Certification of theMPO Transportation Planning ProcessGrand IslandRegular Session - 11/24/2020Page 50 / 167 MPO Self-CertificationThe Nebraska Department of Transportation (NDOT) and the Grand Island AreaMetropolitan Planning Organization (GIAMPO) hereby certify that the transportationplanning process is addressing the major issues in the metropolitan planning area and isbeing conducted in accordance with all the applicable requirements of;1) 23 U.S.C. 134, 49 U.S.C. 5303 and this subpart;GIAMPO collaborates with local, State and public transportation agencies to carryout a continuing, cooperative, and comprehensive (3-C) metropolitan planningprocess through its Long Range Transportation Plan (LRTP), TransportationImprovement Program (TIP), Unified Planning Work Program (UPWP), and othertransportation planning activities.2) In nonattainment and maintenance areas, sections 174 and 176 (c) and (d) ofthe Clean Air Act, as amended (42 U.S.C. 7504, 7506 (c) and (d) and 40 CFRpart 93; ;GIAMPO is designated as an attainment area.3) Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d-1) and 49CFR part 21;GIAMPO completed -its MPO Title VI Implementation Plan. The GIAMPO PolicyBoard approved this plan on May 23, 2017.4) 49 U.S.C. 5332, prohibiting discrimination on the basis of race, color, creed,national origin, sex, or age in employment or business opportunity;GIAMPO's Public Participation Plan together with the MPO Title VI ImplementationPlan and the City of Grand Island's Title VI Nondiscrimination Agreement ensuresthat no person will excluded from participation in the planning process. This appliesto GIAMPO's LRTP, TIP, UPWP, and other transportation planning activities.5) Section 1101 (b) of the FAST Act (Pub. L 114-94) and 49 CFR part 26 regardingthe involvement of disadvantaged business enterprises in USDOT fundedplanning projects;The City of Grand Transit Program maintains the Disadvantaged Business Programthat was to the Federal Transit Administration (FTA) in 2017 that includes aFostering Small Business Participation element and continues to meet therequirements ofFTA6) 23 CFR part 230, regarding the implementation of an equal employmentopportunity program on Federal and Federal-aid highway constructioncontracts; ;GIAMPO does not receive Federal-aid highway construction funds and does not letconstruction contracts. With regard to transportation planning activities related tocontracts utilizing FHWA and FTA PL funds, the selection of private consultants iscoordinated by and'adheres to NDOT and City of Grand Island Procurementguidelines.Grand IslandRegular Session - 11/24/2020Page 51 / 167 7) The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101et seq.) and 49 CFR parts 27, 37, and 38;GIAMPO completed it American with Disabilities Act (ADA) Self-Evaluation andTransition Plan. The GIAMPO Policy approved this plan on November 22, 2016.8) The Older Americans Act, as amended (42 U.S.C. 6101), prohibitingdiscrimination on the basis of age in programs or activities receiving Federalfinancial assistance;,9) Section 324 of title 23 U.S.C. regarding the prohibition of discrimination basedon gender; and10) Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR part27 regarding discrimination against individuals with disabilities.GIAMPO is a prograir] of the City of Grand Island's Public Works Department. TheCity of Grand Island has an Equal Employment Opportunity Policy that prohibitsdiscrimination in employment opportunities or practices on the basis of race, color,religion, sex, sexual orientation, mental or physical disability, marital status, nationalorigin, or genetic information. This policy along with the GIAMPO PublicParticipation Plan, MRO Title VI Implementation Plan, and ADA Self-Evaluation andTransition Plan ensures every effort will be made to assure nondiscrimination in itstransportation planning activities.By,,Rog^DateBy:RyanDate51^ y/f'^J[^^C^rSsj^ele, Mayor/Chairpersoniwsl^i^/? ,/ "/!; /.'. "r/^M^//f/Huff, Int^-modal Planning Divisions Manager,^':^ ':..cAttest:Jo^Df^eNebraska^^Slliris, Public Works DirectorDepartment of TransportationGrand IslandRegular Session - 11/24/2020Page 52 / 167 C-1 | Page Grand Island Area Metropolitan Planning Organization Transportation Improvement Program FY 2021-2025 Appendix D – Comments Grand IslandRegular Session - 11/24/2020Page 53 / 167 Grand Island Regular Session - 11/24/2020 Page 54 / 167 Grand Island Regular Session - 11/24/2020 Page 55 / 167 Public Comment Period A 14-day public comment period was held from October 20, 2020 to November 4, 2020. No public comments were received. Grand Island Regular Session - 11/24/2020 Page 56 / 167 DraftGRAND ISLAND AREA METROPOLITAN PLANNING ORGANIZATION (GIAMPO) TECHNICAL ADVISORY COMMITTEE (TAC) MINUTES October 19, 2020 at 10:00 am Grand Island City Hall – Council Chambers 100 E 1st Street, Grand Island, NE 68801 Voting Members in Attendance: Keith Kurz, City of Grand Island, Assistant Public Works Director Present John Collins, City of Grand Island, Public Works Director Present Jerry Janulewicz, City of Grand Island, City Administrator Present Chad Nabity, Hall County Regional Planning Director Present Steve Riehle, Hall County Public Works Director Present Mike Meyer, Merrick County Hwy Superintendent Absent Wes Wahlgren, NDOT District 4 Engineer Present Craig Wacker, NDOT Highway Planning Manager Present Ramona Schafer, Village of Alda Absent Mike Olson, Central Nebraska Regional Airport Present via Zoom Charley Falmlen, City of Grand Island Transit Program Manager Present Non-Voting Members in Attendance: Andres Gomez, City of Grand Island, MPO Program Manager Present Shannon Callahan, City of Grand Island,Street Superintendent Present Patrick Brown, City of Grand Island, Finance Director Present Brian Schultz,City of Grand Island, Asst. Finance Director Present Catrina DeLosh, City of Grand Island, Public Works Admin Coordinator Present Tim Golka, City of Grand Island, Project Manager Absent Stacy Nonhof, City of Grand Island, City Attorney (interim) Present Cindy Johnson, Grand Island Area Chamber of Commerce Absent Mary Berlie, Grand Island Area Economic Development Corp. Absent Justin Luther, FHWA, Transportation Planner, Realty, Civil Rights Present Mark Bechtel, FTA, Community Planner Absent Logan Daniels, FTA, Region VII Absent Eva Steinman, FTA, Region VII Community Planner Absent Gerri Doyle, FTA, Region VII Planner Present Kaine McClelland, NDOT, State Modeler Present Jeff Soula, NDOT, Local Projects Urban Engineer Absent Ryan Huff, NDOT, Planning and Project Development Engineer Absent Mark Fischer, NDOT, Assistant Planning Engineer Absent Tomlin Bentley, Burlington Northern Santa Fe Railroad Absent Kyle Nodgaard, Union Pacific Railroad Absent Sara Thompson-Kassidy, Union Pacific Railroad Absent Call to Order Nabity called the meeting to order at 10:02 am. The Nebraska Open Meetings Act was acknowledged. The attendance of Jason Carbee of HDR, Inc. was recognized. Grand Island Regular Session - 11/24/2020 Page 57 / 167 Draft2 | Page 2020/2/10 TAC Meeting Minutes Roll Call Roll call was taken. Approval of Minutes from the August 10, 2020 Technical Advisory Committee Meeting Motion by Riehle to approve the minutes of the August 10, 2020 meeting, seconded by Wahlgren. Upon voice vote, all voted aye. Motion adopted. Approval Recommendation of Final Draft TIP Amendment No. 1 to FY 2021- 2025 TIP Gomez informed the Committee that proposed Amendment No. 1 includes changes to one (1) Transit and seven (7) roadway projects. The Transit project change includes using CARES Act funding in addition to state and local funds to plan and purchase the transit facility in FY2021. The roadway project changes are a combination of updates to expenditures both in FY and dollars. Motion by Falmlen and second by Riehle to approve the Recommendation of Final Draft TIP Amendment No. 1 to FY 2021-2025 TIP. Upon voice vote, all voted aye. Motion adopted. Approval Recommendation of MPO Targets for Safety Performance Measures Gomez recommended supporting the Nebraska Department of Transportation (NDOT) 2020 safety performance targets as the most prudent and feasible alternative. With supporting the statewide 2021 targets, GIAMPO is agreeing to plan and program projects in a manner that contributes towards the accomplishment of the NDOT safety targets.These targets will ultimately be integrated into the GIAMPO Long Range Transportation Plan and Transportation Improvement Program. Motion by Wahlgren and seconded by Riehle to approve the Recommendation of MPO Targets for Safety Performance Measures. Upon voice vote, all voted aye. Motion adopted. Approval Recommendation of MPO Targets for Pavement and Bridge Condition Performance Measures Gomez recommended supporting the NDOT NHS Pavement and Bridge Condition performance targets as the most prudent alternative. With supporting the statewide targets, GIAMPO is agreeing to plan and program projects in a manner that contributes towards the accomplishments of the NDOT NHS Pavement and Bridge Condition performance targets. These targets will ultimately be integrated into the GIAMPO Long Range Transportation Plan and Transportation Improvement Program. Motion by Riehle, second by Janulewicz to approve Recommendation of MPO Targets for Pavement and Bridge Condition Performance Measures. Upon voice vote, all voted aye. Motion adopted. Approval Recommendation of MPO Targets for NHS Travel Time Reliability and Freight Reliability Performance Measures Gomez recommended supporting the NDOT NHS Travel Time Reliability and Freight Reliability performance targets as the most prudent alternative. In supporting the statewide targets, GIMAPO is agreeing to plan and program projects in a manner that contributes towards the accomplishment of the NDOT NHS Travel Time Reliability and Freight Reliability performance targets. These targets will ultimately be integrated into the GIAMPO Long Range Transportation Plan and Transportation Improvement Program. Motion by Janulewicz, seconded by Walgren to approve Recommendation of MPO Targets for NHS Travel Time Reliability and Freight Reliability Performance Measures. Upon voice vote, all vote aye. Motion adopted. Grand Island Regular Session - 11/24/2020 Page 58 / 167 Draft3 | Page 2020/2/10 TAC Meeting Minutes Long Range Transportation Plan Project Priorities Jason Carbee of HDR, Inc. presented results from the public priority exercise, working draft of plan projects, and the next steps involved with Long Range Transportation Plan 2045. There will be a public meeting on November 12, 2020 for citizens to provide feedback on the project lists. Next Meeting Date The next meeting of the TAC will be on December 14, 2020 at 10:00 am. Adjournment There being no further business, Nabity adjourned the meeting at 11:01 am. Grand Island Regular Session - 11/24/2020 Page 59 / 167 GIAMPO RESOLUTION NO. 2020-05 Grand Island Area Metropolitan Planning Organization A Resolution Amending the FY 2021-2025 Transportation Improvement Program (TIP) WHEREAS, the Grand Island Area Metropolitan Planning Organization (GIAMPO), is designated as the Metropolitan Planning Organization (MPO) for the Grand Island Urbanized Area, by the Governor acting through the Nebraska Department of Transportation in cooperation with locally elected officials of the Grand Island Urbanized Area; and WHEREAS, the MPO, pursuant to 23 USC 134 and 49 USC 5303, adopted on May 26, 2020, a Transportation Improvement Program (TIP) for fiscal years 2021-2025; and WHEREAS, the MPO has prepared an amendment to the MPO’s Fiscal Years 2021- 2025 TIP that modifies the estimate for state and local projects as identified in Exhibit A; and WHEREAS, the projects included in the amendment are consistent with Long Range Transportation Plan; and WHEREAS, the amendment was made available for public comment for a fifteen (15) day period and was reviewed and recommended for adoption by the Technical Advisory Committee (TAC) of the MPO, and now requires official approval from the Policy Board of the MPO; and NOW, THEREFORE BE IT RESOLVED, that the Policy Board of the Grand Island Area Metropolitan Planning Organization approves and adopts the amendment to the MPO’s Fiscal Years 2021-2025 TIP. BE IT FURTHER RESOLVED, that the Chairperson is hereby authorized and directed to execute such agreement on behalf of the Grand Island Area Metropolitan Planning Organization. Certification: The foregoing resolution was approved by the Grand Island Area Metropolitan Planning Organization Policy Board at its regularly scheduled meeting on November 24, 2020. By: Attest: ______________________________ ______________________________ Roger Steele, Mayor / Chairperson John Collins, Public Works Director Grand Island Regular Session - 11/24/2020 Page 60 / 167 Exhibit A Revised Projects Grand Island Area Metropolitan Planning Organization Transportation Improvement Program FY 2021 – 2025 Amendment No. 1 to the 2021-2025 TIP includes changes to one transit and seven roadway projects: • 1 revised transit project: o TIP No. 2021-003 – changes include using CARES Act funding in addition to state and local funds to plan and purchase the transit facility ($1,708,000) in fiscal year 2021. • 7 revised roadway project: o TIP No. 2018-003 – change the year of expenditure for right of way from 2020 to 2021, change the construction cost (Local) from $479,000 to 503,000, change the construction cost (Federal) from $1,914,000 to $2,011,000 for the 5-Points Intersection Improvements project in Grand Island, NE. o TIP No. 2016-004 – change the year of expenditure for PE from 2020 to 2022, change the year of expenditure for ROW from 2021 to 2023, change year of expenditure for construction from 2022 to 2024, change PE cost (Local) from $191,000 to 147,000, change PE cost (State) from $2,126,000 to $2,204,000, change construction cost (Local) from $2,199,000 to $2,190,000, change construction cost (State) from $20,369,000 to $23,054,000 for the US-281 West project in Grand Island, NE. o TIP No. 2016-008 – change PE cost (State) from $280,000 to $290,000, change construction cost (Local) from $170,000 to $197,000, change construction cost (Federal) from $3,636,000 to $4,007,000, change construction cost (State) from $899,000 to $969,000 for the Grand Island Bridges project in Grand Island, NE. o TIP No. 2018-001 – change PE cost (State) from $99,000 to $585,000, change ROW cost (State) from $10,000 to $0, change construction cost (Local) from $199,000 to $2,080,000, change construction cost (Federal) from $7,852,000 to $11,336,000, change construction cost (State) from $1,802,000 to $1,667,000 for the Cairo – Grand Island project. o TIP No. 2020-001 – change PE cost (State) from $74,000 to $418,000 for the Grand Island & South (SB) project. o TIP No. 2020-002 – change year of expenditure for PE from 2020 to 2021, change year of expenditure for construction from 2021 to 2022 for the District 4 Wetland Bank project. o TIP No. 2020-003 – change PE cost (State) from $3,000 to $27,000, change construction cost (State) from $657,000 to $1,018,000. Grand Island Regular Session - 11/24/2020 Page 61 / 167 GIAMPO RESOLUTION NO. 2020-05 Grand Island Area Metropolitan Planning Organization A Resolution Amending the FY 2021-2025 Transportation Improvement Program (TIP) WHEREAS, the Grand Island Area Metropolitan Planning Organization (GIAMPO), is designated as the Metropolitan Planning Organization (MPO) for the Grand Island Urbanized Area, by the Governor acting through the Nebraska Department of Transportation in cooperation with locally elected officials of the Grand Island Urbanized Area; and WHEREAS, the MPO, pursuant to 23 USC 134 and 49 USC 5303, adopted on May 26, 2020, a Transportation Improvement Program (TIP) for fiscal years 2021-2025; and WHEREAS, the MPO has prepared an amendment to the MPO’s Fiscal Years 2021- 2025 TIP that modifies the estimate for state and local projects as identified in Exhibit A; and WHEREAS, the projects included in the amendment are consistent with Long Range Transportation Plan; and WHEREAS, the amendment was made available for public comment for a fifteen (15) day period and was reviewed and recommended for adoption by the Technical Advisory Committee (TAC) of the MPO, and now requires official approval from the Policy Board of the MPO; and NOW, THEREFORE BE IT RESOLVED, that the Policy Board of the Grand Island Area Metropolitan Planning Organization approves and adopts the amendment to the MPO’s Fiscal Years 2021-2025 TIP. BE IT FURTHER RESOLVED, that the Chairperson is hereby authorized and directed to execute such agreement on behalf of the Grand Island Area Metropolitan Planning Organization. Certification: The foregoing resolution was approved by the Grand Island Area Metropolitan Planning Organization Policy Board at its regularly scheduled meeting on November 24, 2020. By: Attest: ______________________________ ______________________________ Roger Steele, Mayor / Chairperson John Collins, Public Works Director Grand Island Regular Session - 11/24/2020 Page 62 / 167 Exhibit A Revised Projects Grand Island Area Metropolitan Planning Organization Transportation Improvement Program FY 2021 – 2025 Amendment No. 1 to the 2021-2025 TIP includes changes to one transit and seven roadway projects: • 1 revised transit project: o TIP No. 2021-003 – changes include using CARES Act funding in addition to state and local funds to plan and purchase the transit facility ($1,708,000) in fiscal year 2021. • 7 revised roadway project: o TIP No. 2018-003 – change the year of expenditure for right of way from 2020 to 2021, change the construction cost (Local) from $479,000 to 503,000, change the construction cost (Federal) from $1,914,000 to $2,011,000 for the 5-Points Intersection Improvements project in Grand Island, NE. o TIP No. 2016-004 – change the year of expenditure for PE from 2020 to 2022, change the year of expenditure for ROW from 2021 to 2023, change year of expenditure for construction from 2022 to 2024, change PE cost (Local) from $191,000 to 147,000, change PE cost (State) from $2,126,000 to $2,204,000, change construction cost (Local) from $2,199,000 to $2,190,000, change construction cost (State) from $20,369,000 to $23,054,000 for the US-281 West project in Grand Island, NE. o TIP No. 2016-008 – change PE cost (State) from $280,000 to $290,000, change construction cost (Local) from $170,000 to $197,000, change construction cost (Federal) from $3,636,000 to $4,007,000, change construction cost (State) from $899,000 to $969,000 for the Grand Island Bridges project in Grand Island, NE. o TIP No. 2018-001 – change PE cost (State) from $99,000 to $585,000, change ROW cost (State) from $10,000 to $0, change construction cost (Local) from $199,000 to $2,080,000, change construction cost (Federal) from $7,852,000 to $11,336,000, change construction cost (State) from $1,802,000 to $1,667,000 for the Cairo – Grand Island project. o TIP No. 2020-001 – change PE cost (State) from $74,000 to $418,000 for the Grand Island & South (SB) project. o TIP No. 2020-002 – change year of expenditure for PE from 2020 to 2021, change year of expenditure for construction from 2021 to 2022 for the District 4 Wetland Bank project. o TIP No. 2020-003 – change PE cost (State) from $3,000 to $27,000, change construction cost (State) from $657,000 to $1,018,000. Grand Island Regular Session - 11/24/2020 Page 63 / 167 GIAMPO – Policy Board Tuesday, November 24, 2020 Regular Session Item E2 Approval of MPO Targets for Safety Performance Measures Staff Contact: Andres Gomez, MPO Program Manager Grand Island Regular Session - 11/24/2020 Page 64 / 167 1 Policy Board Agenda Report Agenda Item No. E2 November 24, 2020 ISSUE VOTE: MPO 2021 Targets for Safety Performance Measures BACKGROUND The current and previous federal transportation bills, FAST Act and MAP-21, respectively, included a series of requirements for Transportation Performance Management (TPM). Since the passage of MAP-21, USDOT has worked through the federal rulemaking process to establish a series of performance measures and corresponding target setting requirements. Generally, the performance measures relate to national goals of safety, infrastructure condition, air quality, and transportation system performance. Final USDOT rules related to TPM established five (5) performance measures for traffic safety (see attached fact sheet). State DOTs are required to establish safety (HSIP) targets for all five performance measures by August 31 of each year. MPOs have the option of supporting the statewide targets, or establishing their own regional targets within 180 days of the establishment of state targets. Therefore, all Nebraska MPOs must adopt safety targets by February 27 of each year. GIAMPO adopted the state’s 2020 safety performance targets set in August 2019. GIAMPO staff recommends the support of the Nebraska Department of Transportation (NDOT) 2021 safety performance targets (see attached NDOT Safety Targets) as the most prudent and feasible alternative. The core reasons to not establishing regional targets include the following: •Regarding midway progress towards the state’s 2019 safety targets, each of the five targets was either “met” or was “better than baseline” •Need to determine the methodology to estimate annual vehicle miles traveled (VMT) for all public roads within the GIAMPO metropolitan planning area from 2015 to 2019, if GIAMPO would establish rate targets •Need to process the accident data within the GIAMPO metropolitan planning area from 2011 to 2014 to determine the 5-year rolling average for 2015, 2016, 2017, and 2018 on the five performance measures for comparative purposes and to determine a baseline, if GIAMPO would establish targets POLICY CONSIDERATIONS/DISCUSSION With supporting the statewide 2021 targets, GIAMPO is agreeing to plan and program projects in a manner that contributes towards the accomplishment of the NDOT safety targets. These targets will ultimately be integrated into the GIAMPO Long Range Transportation Plan and Transportation Improvement Program. Grand Island Regular Session - 11/24/2020 Page 65 / 167 2 BUDGET CONSIDERATIONS None. COMMITTEE ACTION The TAC approved the recommendation to support the state targets as the MPO safety performance targets for the GIAMPO metropolitan planning area on October 19, 2020. RECOMMENDATION Approve to support state targets as the MPO 2021 safety performance targets for the GIAMPO metropolitan planning area. STAFF CONTACTS Andres Gomez Grand Island Regular Session - 11/24/2020 Page 66 / 167 2019 2021 2019 2021 2021 Yearend Actual Values Yearend Actual Values Actual 2016-2021 (B) Baseline 2014-2019 (C) Target Achieved? Number of Fatalities 240.4 243.3 248.0 241.0 *234.0 Fatality Rate 1.098 1.138 1.167 1.130 *1.126 Number of Serious Injuries 1,302.4 1,408.1 1,400.0 1,408.0 1,476.0 Serious Injury Rate 5.914 6.502 6.591 6.507 7.102 Number of Non-motorized Fatalities and Serious Injuries 120.6 126.6 129.0 126.6 134.2 Baseline Year 2019 Calendar Years:2017 Through 2021 Calendar Years:2015 Through 2019 HSIP Apport. Year Target Calendar Year Implementation Year 2020 2021 2024 Target Year (A) Calendar Year (CY) 2021 Targets are established and reported in the August 31, 2020 HSIP Annual Report. 0.005 added to targets for fatality rate and serious injury rate to offset rounding issues in FHWA calculations. Nebraska HSO shares 3 targets with HSIP. Nebraska HSO submits number targets rounded to the nearest integer and rate targets rounded to the nearest hundredth. The 3 shared targets have been rounded to match the Nebraksa HSO method. HSIP PERFORMANCE MEASURE Projected 2017- 2021 Actual Avg Better Than Baseline? Met or Made Significant Progress? Projected 2017-2021 Rolling Avg. 5-Year Rolling Average NEBRASKA HSIP PERFORMANCE MEASURES - Baseline NDOT Target 2016-2021 (A) *Selected targets based on a 1% reduction of projected outcome of the current increasing trend. If a State has not met or made significant progress toward meeting its targets, the State must comply with the provisions set forth in 23 USC 148(i) for the subsequent fiscal year. The State shall: 1. Use obligation authority equal to the HSIP apportionment for the year prior to the target year, only for HSIP projects. CONFIDENTIAL INFORMATION: Federal Law, 23 U.S.C. §409, prohibits the production of this document or its contents in discovery or its use in evidence in a State or Federal Court. The State of Nebraska has not waived any privilege it may assert as provided by that law through the dissemination of this document and has not authorized further distribution of this document or its contents to anyone other than the original recipient. 2. Submit an HSIP Implementation Plan that describes actions the State will take to meet or make significant progress toward meeting its targets. The HSIP Implementation Plan should guide the State's project decisions so that the combined 148(i) provisions lead to the State meeting or making significant progress toward meeting its safety performance targets in subsequent years. (B) Actual performance is the 5-year rolling average ending in the year for which the targets were established. (C) Baseline performance is the 5-year rolling average that ends prior to the year in which the targets were established. Baseline performance is calculated in order to compare whether the actual outcome was better than the baseline performance If the State is determined to have not met or made significant progress toward meeting its CY targets, the State will have to use obligation authority equal to the defined HSIP apportionment year only for HSIP projects in the defined implementation year and submit an HSIP Implementation Plan for the same year. Grand Island Regular Session - 11/24/2020 Page 67 / 167 Year State Hall County Hall County - MPA Merrick County - MPA Total MPA 2012 212 6 3 0 3 2013 211 6 4 0 4 2014 225 5 1 1 2 2015 246 5 3 0 3 2016 218 5 2 0 2 2017 228 11 8 0 8 2018 230 5 3 0 3 2019 248 8 2 0 2 Year State Hall County Hall County - MPA Merrick County - MPA Total MPA 2012 1661 61 49 0 49 2013 1536 40 31 0 31 2014 1620 55 38 4 42 2015 1520 43 33 0 33 2016 1588 64 50 1 51 2017 1478 54 40 1 41 2018 1394 55 45 0 45 2019 1400 47 35 0 35 Year State Hall County Hall County - MPA Merrick County - MPA Total MPA 2012 152 4 4 0 4 2013 141 2 2 0 2 2014 137 5 5 0 5 2015 147 3 3 0 3 2016 125 3 2 0 2 2017 143 5 5 0 5 2018 127 3 3 0 3 2019 129 3 3 0 3 Number of Fatalities Number of Serious Injuries Number of Non-Motorized Fatalities and Serious Injuries Grand Island Regular Session - 11/24/2020 Page 68 / 167 Metropolitan Planning Organization Safety Performance Measures Fact Sheet Safety Performance Measures The Safety Performance Management Measures regulation supports the Highway Safety Improvement Program (HSIP) and requires State Departments of Transportation (DOTs) and Metropolitan Planning Organizations (MPOs) to set HSIP targets for 5 safety performance measures. This document highlights the requirements specific to MPOs and provides a comparison of MPO and State DOT responsibilities. How do MPOs establish HSIP targets? Coordination is the key for all stakeholders in setting HSIP targets. Stakeholders should work together to share data, review strategies and understand outcomes. MPOs must work with the State DOT. MPOs should also coordinate with the State Highway Safety Office, transit operators, local governments, the FHWA Division Office, National Highway Transportation Safety Administration (NHTSA) Regional Office, law enforcement and emergency medical services agencies, and others. By working together, considering and integrating the plans and programs of various safety stakeholders, MPOs will be better able to understand impacts to safety performance to establish appropriate HSIP targets. Coordination should start with the Strategic Highway Safety Plan (SHSP). More information on the SHSP is available at http://safety.fhwa.dot.gov/hsip/shsp/. HSIP Safety Targets Established by MPOs 1 Number of fatalities 2 Rate of fatalities 3 Number of serious injuries 4 Rate of serious injuries 5 Number of non-motorized fatalities and non-motorized serious injuries MPOs establish HSIP targets by either: 1. agreeing to plan and program projects so that they contribute toward the accomplishment of the State DOT HSIP target or 2. committing to a quantifiable HSIP target for the metropolitan planning area. To provide MPOs with flexibility, MPOs may support all the State HSIP targets, establish their own specific numeric HSIP targets for all of the performance measures, or any combination. MPOs may support the State HSIP target for one or more individual performance measures and establish specific numeric targets for the other performance measures. If an MPO agrees to support a State HSIP target, the MPO would … If an MPO establishes its own HSIP target, the MPO would…  Work with the State and safety stakeholders to address areas of concern for fatalities or serious injuries within the metropolitan planning area  Coordinate with the State and include the safety performance measures and HSIP targets for all public roads in the metropolitan area in the MTP (Metropolitan Transportation Plan)  Integrate into the metropolitan transportation planning process, the safety goals, objectives, performance measures and targets described in other State safety transportation plans and processes such as applicable portions of the HSIP, including the SHSP  Include a description in the TIP (Transportation Improvement Program) of the anticipated effect of the TIP toward achieving HSIP targets in the MTP, linking investment priorities in the TIP to those safety targets  Establish HSIP targets for all public roads in the metropolitan planning area in coordination with the State  Estimate vehicles miles traveled (VMT) for all public roads within the metropolitan planning area for rate targets  Include safety (HSIP) performance measures and HSIP targets in the MTP  Integrate into the metropolitan transportation planning process, the safety goals, objectives, performance measures and targets described in other State safety transportation plans and processes such as applicable portions of the HSIP, including the SHSP  Include a description in the TIP of the anticipated effect of the TIP toward achieving HSIP targets in the MTP, linking investment priorities in the TIP to those safety targets FHWA-SA-16-084 Grand Island Regular Session - 11/24/2020 Page 69 / 167 Volumes for HSIP Rate Targets: MPOs that establish fatality rate or serious injury rate HSIP targets must report the VMT estimate used for such targets, and the methodology used to develop the estimate, to the State DOT. For more information on volumes for HSIP rate targets, see http://www.fhwa.dot.gov/planning/processes/tools/technical_guidance/index.cfm. Roads addressed by MPO HSIP Targets: HSIP targets cover all public roadways within the metropolitan planning area boundary regardless of ownership or functional classification, just as State HSIP targets cover all public roads in the State. How do MPOs with multi-State boundaries establish HSIP targets? MPOs with multi-State boundaries must coordinate with all States involved. If an MPO with multi-State boundaries chooses to support a State HSIP target, it must do so for each State. For example, an MPO that extends into two States would agree to plan and program projects to contribute to two separate sets of HSIP targets (one for each State). If a multi-State MPO decides to establish its own HSIP target, the MPO would establish the target for the entire metropolitan planning area. When do MPOs need to establish these targets? States establish HSIP targets and report them for the upcoming calendar year in their HSIP annual report that is due August 31 each year. MPOs must establish HSIP targets within 180 days of the State establishing and reporting its HSIP targets. Since FHWA deems the HSIP reports submitted on August 31, MPOs must establish HSIP targets no later than February 27 of each year. Top 5 Things to Know about MPO HSIP Safety Performance Targets  All MPOs must set a target for each of the 5 HSIP Safety Performance Measures  MPOs may adopt and support the State’s HSIP targets, develop their own HSIP targets, or use a combination of both  MPOs must establish their HSIP targets by February 27 of the calendar year for which they apply  MPO HSIP targets are reported to the State DOT  MPO HSIP targets are not annually assessed for significant progress toward meeting targets; State HSIP targets are assessed annually Where do MPOs report targets? While States report their HSIP targets to FHWA in their annual HSIP report, MPOs do not report their HSIP targets directly to FHWA. Rather, the State(s) and MPO mutually agree on the manner in which the MPO reports the targets to its respective DOT(s). MPOs must include baseline safety performance, HSIP targets and progress toward achieving HSIP targets in the system performance report in the MTP. Whether an MPO agrees to support a State HSIP target or establishes its own HSIP target the MPO would include in the MTP a systems performance report evaluating the condition and performance of the transportation system with respect to the safety performance targets described in the MTP including progress achieved by the MPO in achieving safety performance targets Assessment of Significant Progress While FHWA will determine whether a State DOT has met or made significant progress toward meeting HSIP targets, it will not directly assess MPO progress toward meeting HSIP targets. However, FHWA will review MPO performance as part of ongoing transportation planning process reviews including the Transportation Management Area certification review and the Federal Planning Finding associated with the approval of the Statewide Transportation Improvement Program. FHWA-SA-16-084 Grand Island Regular Session - 11/24/2020 Page 70 / 167 GIAMPO RESOLUTION NO. 2020-6 Grand Island Area Metropolitan Planning Organization A Resolution the MPO Targets for Safety Performance Measures WHEREAS, the Grand Island Area Metropolitan Planning Organization (GIAMPO), is designated as the Metropolitan Planning Organization (MPO) for the Grand Island Urbanized Area, by the Governor acting through the Nebraska Department of Transportation in cooperation with locally elected officials of the Grand Island Urbanized Area; and WHEREAS, the Moving Ahead for Progress in the 21st Century Act (MAP-21) required the U.S. Secretary of Transportation to develop rules to establish a system to monitor and manage public transportation assets, to improve safety and increase reliability and performance, and to establish performance measures, and the Fixing America’s Surface Transportation (FAST) Act reaffirmed this requirement; and WHEREAS, the Highway Safety Improvement Program (HSIP) Final 23 CFR Part 490 became effective April 14, 2016 and establishes targets for five performance measures based on five-year rolling averages for: Performance Measures Number of Fatalities Rate of Fatalities* Number of Serious Injuries Rate of Serious Injuries* Number of Non-motorized Fatalities and Serious Injuries *Rates are per 100 million vehicle miles traveled (VMT) WHEREAS, the Nebraska Department of Transportation is to adopt safety performance measures in their Highway Safety Improvement Program by August 31, 2020; and WHEREAS, the MPO Policy Board may establish safety targets by agreeing to plan and program projects that contribute toward the accomplishment of the State’s targets, or establish its own targets within 180 days of the State establishing and reporting its safety targets; and WHEREAS, the MPO Policy Board will adopt to support the 2021 targets for the Nebraska Department of Transportation; and WHEREAS, the MPO targets for safety performance measures has been reviewed and recommended for adoption by the MPO Technical Advisory Committee (TAC), and now require official approval from the MPO Policy Board; and NOW, THEREFORE BE IT RESOLVED, that the Policy Board of the Grand Island Area Metropolitan Planning Organization has agreed to support the Nebraska Department of Grand Island Regular Session - 11/24/2020 Page 71 / 167 Transportation 2021 targets for safety performance measures as identified in Exhibit A. BE IT FURTHER RESOLVED, that the Chairperson is hereby authorized and directed to execute such agreement on behalf of the Grand Island Area Metropolitan Planning Organization. Certification: The foregoing resolution was approved by the Grand Island Area Metropolitan Planning Organization Policy Board at its regularly scheduled meeting on November 24, 2020. By: Attest: Roger G. Steele, Mayor / Chairperson John Collins, Public Works Director Grand Island Regular Session - 11/24/2020 Page 72 / 167 Exhibit A Grand Island Regular Session - 11/24/2020 Page 73 / 167 GIAMPO – Policy Board Tuesday, November 24, 2020 Regular Session Item E3 Approval of MPO Targets for Pavement and Bridge Condition Performance Measures Staff Contact: Andres Gomez, MPO Program Manager Grand Island Regular Session - 11/24/2020 Page 74 / 167 1 Policy Board Agenda Report Agenda Item No. E3 November 24, 2020 ISSUE VOTE: MPO Targets for NHS Pavement and Bridge Condition Performance Measures BACKGROUND The current and previous federal transportation bills, FAST Act and MAP-21, respectively, included a series of requirements for Transportation Performance Management (TPM). Since the passage of MAP-21, USDOT has worked through the federal rulemaking process to establish a series of performance measures and corresponding target setting requirements. Generally, the performance measures relate to national goals of safety, infrastructure condition, air quality, and transportation system performance. Final USDOT rules related to TPM established performance measures to assess the condition of pavements and bridges on the National Highway System (NHS). There are four performance measures for pavement condition and two performance measures for bridge condition (see attached TPM fact sheets). State DOTs were required to establish performance targets for these measures by May 20, 2018. MPOs have the option of supporting the statewide targets, or establishing their own regional targets within 180 days of the establishment of state targets. Therefore, all Nebraska MPOs must adopt targets for NHS Pavement and Bridge Condition performance measures by November 17, 2018. After two years there will be a mid-point review, at which point the targets could be adjusted for NDOT and MPOs based on collected data. State DOTs will establish targets every four years. GIAMPO staff recommends the support of the NDOT NHS Pavement and Bridge Condition performance targets (see attached NDOT’s Statewide Performance Measure Targets (PM2)) as the most prudent alternative. The transportation performance management state biennial performance report for performance period 2018-2021 is included. The core reasons for not establishing regional targets include the following: •The Interstate and Non-Interstate NHS routes in the GIAMPO metropolitan planning area are State NHS routes. •Statewide, 80.3% of pavements of the Interstate System are in Good condition. •Statewide, 0.01% of pavements of the Interstate System are in Poor condition. •Statewide, 58.1% of pavements of the Non-Interstate System are in Good condition. •Statewide, 2.1% of pavements of the Non-Interstate System are in Poor condition. •State is the owner of the NHS bridges in the GIAMPO region. •Statewide, 56.5% of NHS bridges are classified as Good condition. •Statewide, 1.9% of NHS bridges are classified as Poor condition. Grand Island Regular Session - 11/24/2020 Page 75 / 167 2 POLICY CONSIDERATIONS/DISCUSSION With supporting the statewide targets, GIAMPO is agreeing to plan and program projects in a manner that contributes towards the accomplishment of the NDOT NHS Pavement and Bridge Condition performance targets. These targets will ultimately be integrated into the GIAMPO Long Range Transportation Plan and Transportation Improvement Program. BUDGET CONSIDERATIONS None. COMMITTEE ACTION The TAC approved the recommendation to support the state targets as the MPO NHS Pavement and Bridge Condition performance targets for the GIAMPO metropolitan planning area on October 19, 2020. RECOMMENDATION Approve to support state targets as the MPO NHS Pavement and Bridge Condition performance targets for the GIAMPO metropolitan planning area. STAFF CONTACT Andres Gomez Grand Island Regular Session - 11/24/2020 Page 76 / 167 This document is exempt under discovery or admission under 23 USC § 409. Data provided by Nebraska Department of Transportation. Information relating to the GIAMPO metropolitan planning area (MPA) was determined by GIAMPO staff. 1 NDOT’s Statewide Performance Measure Targets (PM2) The Nebraska Department of Transportation (NDOT) recommends the following pavement and bridge condition targets for the state. Pavement and bridge condition performance measures are defined in accordance with the final USDOT rule on Pavement and Bridge Condition Performance Measures, authorized by 23 CFR Part 490. At least 50% of pavements of the Interstate System in Good condition. No more than 5% of pavements of the Interstate System in Poor condition. At least 40% of the Non-Interstate National Highway System (NHS) in Good condition. No more than 10% of the Non-Interstate National Highway System in Poor condition. No more than 10% of the total deck area of bridges in the state on the National Highway System is located on bridges that have been classified as structurally deficient. At least 55% of bridges on the State system and NHS in Good or Fair condition. Grand Island Regular Session - 11/24/2020 Page 77 / 167 Pavement Performance Measures Performance Measures % of Interstate pavements in Good condition % of Interstate pavements in Poor condition % of non-Interstate NHS pavements in Good condition % of non-Interstate NHS pavements in Poor condition Target Setting State DOTs: •Must establish targets, regardless of ownership, for the full extent of the Interstate and non-Interstate NHS. •Must establish statewide 2-and 4-year targets for the non-Interstate NHS and 4-year targets for the Interstate by May 20, 2018, and report by October 1, 2018. •May adjust targets at the Mid Performance Period Progress Report (October 1, 2020). Metropolitan Planning Organizations (MPOs): •Support the relevant State DOT(s) 4- year target or establish their own by 180 days after the State DOT(s) target is established. Penalty Provisions If FHWA determines the State DOT’s Interstate pavement condition falls below the minimum level for the most recent year, the State DOT must obligate a portion of National Highway Performance Program (NHPP) and transfer a portion of Surface Transportation Program (STP) funds to address Interstate pavement condition. About Condition •Good condition: Suggests no major investment is needed. •Poor condition: Suggests major reconstruction investment is needed. Final Rulemaking The Federal Highway Administration (FHWA) published in the Federal Register (82 FR 5886) a final rule establishing performance measures for State Departments of Transportation (DOTs) to use in managing pavement and bridge performance on the National Highway System (NHS). The National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program Final Rule addresses requirements established by the Moving Ahead for Progress in the 21st Century Act (MAP-21) and reflects passage of the Fixing America’s Surface Transportation (FAST) Act. The rule is effective May 20, 2017. Grand Island Regular Session - 11/24/2020 Page 78 / 167 Pavement Performance Measures Visit www.fhwa.dot.gov/tpm/to learn about training, guidance, and other implementation-related information. Key Dates May 20, 2017 Final rule effective date. January 1,2018 1st 4-year performance period begins. May 20,2018 State DOT targets must be established. January 1, 2018 State DOTs collect data for Interstate pavements that conform to the final rule (IRI,Rutting, Cracking %, Faulting, and Inventory). Within 180 days of relevant State DOT(s) target establishment MPOs must commit to support state target or establish separate quantifiable target. October 1, 2018 Baseline Performance Period Report for 1st Performance Period due. State DOTs report 4-year targets for Interstate and 2-year and 4-year targets for non-Interstate NHS; etc. April 15, 2019, and each April 15 thereafter State DOTs submit first Interstate data that conform to the final rule. January 1, 2020 State DOTs collect data for non-Interstate NHS pavements that conform to the final rules. October 1,2020 Mid Performance Period Progress Report for the 1st Performance Period due. State DOTs report 2-year condition/performance; progress toward achieving 2-year targets; etc. June 15, 2021, and each June 15 thereafter State DOTs submit non-Interstate NHS data that conform to the final rule. December 31, 2021 1st 4-year performance period ends. October 1, 2022 Full Performance Period Progress Report for 1st Performance Period due. State DOTs reports 4-year condition/performance; progress toward achieving 4-year targets, etc. Baseline Performance Period Report for 2nd Performance Period due. State DOTs report 2-year and 4-year targets for Interstate and non-Interstate NHS; baseline condition; etc. Grand Island Regular Session - 11/24/2020 Page 79 / 167 Bridge Performance Measures Performance Measures % of NHS bridges by deck area classified as in Good condition % of NHS bridges by deck area classified as in Poor condition Condition-Based Performance Measures•Measures are based on deck area. •The classification is based on National Bridge Inventory (NBI) condition ratings for item 58 -Deck, 59 -Superstructure, 60 -Substructure, and 62 -Culvert. •Condition is determined by the lowest rating of deck, superstructure, substructure, or culvert. If the lowest rating is greater than or equal to 7, the bridge is classified as good; if is less than or equal to 4, the classification is poor. (Bridges rated below 7 but above 4 will be classified as fair; there is no related performance measure.) •Deck area is computed using NBI item 49 -Structure Length, and 52 -Deck Width or 32 -Approach Roadway Width (for some culverts). Target Setting State DOTs: •Must establish targets for all bridges carrying the NHS, which includes on-and off-ramps connected to the NHS within a State, and bridges carrying the NHS that cross a State border, regardless of ownership. •Must establish statewide 2-and 4- year targets by May 20, 2018, and report targets by October 1, 2018, in the Baseline Performance Period Report. •May adjust 4-year targets at the Mid Performance Period Progress Report (October 1, 2020). Metropolitan Planning Organizations (MPOs): •Support the relevant State DOT(s) 4-year target or establish their own by 180 days after the State DOT(s) target is established. Final Rulemaking The Federal Highway Administration (FHWA) published in the Federal Register (82 FR5886)a final rule establishing performance measures for State Departments of Transportation (DOTs) to use in managing pavement and bridge performance on the National Highway System (NHS). The National Performance Management Measures; Assessing Pavement Condition for the National Highway Performance Program and Bridge Condition for the National Highway Performance Program Final Rule addresses requirements established by the Moving Ahead for Progress in the 21st Century Act (MAP-21) and reflects passage of the Fixing America’s Surface Transportation (FAST) Act. The rule is effective May 20, 2017. Grand Island Regular Session - 11/24/2020 Page 80 / 167 Bridge Performance Measures Key Dates May 20, 2017 Final rule effective date. January 1,2018 1st 4-year performance period begins. May 20, 2018 Initial 2-and 4-year targets established. October 1, 2018 Baseline Performance Period Report for the 1st Performance Period due. State DOTs report 2-year and 4-year targets; etc. Within 180 days of relevant State DOT(s) target establishment MPOs must commit to support State target or establish separate quantifiable target. October 1,2020 Mid Performance Period Progress Report for the 1st Performance Period due. State DOTs report 2-year condition/performance; progress toward achieving 2-year targets; etc. December 31, 2021 1st 4-year performance period ends. October 1, 2022 Full Performance Period Progress Report for 1st performance period due. State DOTs report 4-year condition/ performance; progress toward achieving 4-year targets; etc. Baseline report due for 2nd performance period due. State DOTs report 2-and 4-year targets; baseline condition, etc. Other Specifics •State DOT targets should be determined from asset management analyses and procedures and reflect investment strategies that work toward achieving a state of good repair over the life cycle of assets at minimum practicable cost. State DOTs may establish additional measures and targets that reflect asset management objectives. •The rule applies to bridges carrying the NHS, including bridges on on-and off-ramps connected to the NHS. •If for 3 consecutive years more than 10.0% of a State DOT’s NHS bridges’ total deck area is classified as Structurally Deficient, the State DOT must obligate and set aside National Highway Performance Program (NHPP) funds for eligible projects on bridges on the NHS. •Deck area of all border bridges counts toward both States DOTs’totals. Visit www.fhwa.dot.gov/tpm/to learn about training, guidance, and other implementation-related information. Grand Island Regular Session - 11/24/2020 Page 81 / 167 Page 1 of 29 Transportation Performance Management State Biennial Performance Report for Performance Period 2018-2021 2020 MID PERFORMANCE PERIOD (MPP) PROGRESS REPORT Nebraska Report Due: 10/1/2020 Report Status: Submitted Report Updated On: Report Exported on 9/28/2020 This document is exported from the Federal Highway Administration’s (FHWA) web-based Performance Management Form (PMF) of the Policy Information Data Portal (PIDP). The web-based PMF is the State’s official report to FHWA. Grand Island Regular Session - 11/24/2020 Page 82 / 167 Page 2 of 29 State Contact: Name : Korey Donahoo Phone number : 4024794619 Email : korey.donahoo@nebraska.gov Grand Island Regular Session - 11/24/2020 Page 83 / 167 Page 3 of 29 Summary of Performance Measures and Targets Performance Measures Baseline 2-Year Condition/ Performance 2-Year Target 4-Year Target 4-Year Adjustment Percentage of Pavements of the Interstate System in Good Condition 80.3%50.0% Percentage of Pavements of the Interstate System in Poor Condition 0.1%5.0% Percentage of Pavements of the Non- Interstate NHS in Good Condition 63.4%63.0% Percentage of Pavements of the Non- Interstate NHS in Good Condition (Full Distress + IRI) 58.1%40.0%40.0% Percentage of Pavements of the Non- Interstate NHS in Poor Condition 11.5%12.2% Percentage of Pavements of the Non- Interstate NHS in Poor Condition (Full Distress + IRI) 2.1%10.0%10.0% Percentage of NHS Bridges Classified as in Good Condition 61.0%56.5%55.0%55.0% Percentage of NHS Bridges Classified as in Poor Condition 1.9%1.9%10.0%10.0% Percent of the Person-Miles Traveled on the Interstate That Are Reliable 98.9%97.5%98.9%98.9%94.0% Percent of the Person-Miles Traveled on the Non-Interstate NHS That Are Reliable 91.3%92.6%88.0% Truck Travel Time Reliability (TTTR) Index 1.10 1.15 1.10 1.10 1.25 Total Emission Reductions: PM2.5 Total Emission Reductions: NOx Total Emission Reductions: VOC Total Emission Reductions: PM10 Total Emission Reductions: CO Grand Island Regular Session - 11/24/2020 Page 84 / 167 Page 4 of 29 Overview OVERVIEW SECTION 1 Question No Description Field Type O1 Please provide a discussion on the effectiveness of the investment strategies developed and documented in the State asset management plan for the National Highway System (NHS) required under [23 CFR 490.107(b)(2)(ii)(C)]. NDOT’s investment strategies emphasizing pavement preservation have been very effective in not only meeting but exceeding performance measure targets as well as maintaining the NHS system in a state of good repair as seen below. O2 Please use this space to provide any general comments that may assist FHWA in its review of your submission. You can use this space to provide greater context for your targets and current condition/performance, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) OVERVIEW SECTION 2 Question No Description Field Type O3 Who should FHWA contact with questions?Korey Donahoo O4 What is the phone number for this contact? Please provide 10-digit number (area code and phone number) without formatting. (e.g., 1234567890) 4024794619 O5 What is the email address for this contact?korey.donahoo@nebraska.gov Grand Island Regular Session - 11/24/2020 Page 85 / 167 Page 5 of 29 Pavement Pavement Performance Overview Question No Description Field Type P1 Please use this space to provide any general comments that may assist FHWA in its review of this part of the submission. You can use this space to provide greater context for your targets and current condition, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) Statewide Performance Target for the Percentage of Pavements on the Interstate System in Good Condition Question No Description Field Type P2 The 2-year statewide percentage of pavements on the Interstate System in Good condition. This value is the actual 2-year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] For the 2018-2021 Performance Period, this 2-year condition value will be used as the baseline value for this measure per the phase-in of new requirements for this measure. [23 CFR 490.105(e)(7)(iii)] 80.3 P3 The 4-year target for the statewide percentage of pavements on the Interstate System in Good condition for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 50.0 P4 Does the State DOT wish to adjust the 4-year target for the statewide percentage of pavements on the Interstate System in Good condition? [23 CFR 490.105(e)(6)] No P4a Please provide the adjusted 4-year target for the statewide percentage of pavements on the Interstate System in Good condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] The adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5. [23 CFR 490.101 (Target definition) and 23 CFR 490.313(f)(2)] P4b Please provide the basis for adjustment of the 4-year target for the statewide percentage of pavements on the Interstate System in Good condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] Statewide Performance Target for the Percentage of Pavements on the Interstate System in Poor Condition Grand Island Regular Session - 11/24/2020 Page 86 / 167 Page 6 of 29 Question No Description Field Type P5 The 2-year statewide percentage of pavements on the Interstate System in Poor condition. This value is the actual 2-year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] For the 2018-2021 Performance Period, this 2-year condition value will be used as the baseline value for this measure per the phase-in of new requirements for this measure. [23 CFR 490.105(e)(7)(iii)] 0.1 P6 The 4-year target for the statewide percentage of pavements on the Interstate System in Poor condition for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 5.0 P7 Does the State DOT wish to adjust the 4-year target for the statewide percentage of pavements on the Interstate System in Poor condition? [23 CFR 490.105(e)(6)] No P7a Please provide the adjusted 4-year target for the statewide percentage of pavements on the Interstate System in Poor condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.313(f)(3)] P7b Please provide the basis for adjustment of the 4-year target for the statewide percentage of pavements on the Interstate System in Poor condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] Statewide Performance Target for the Percentage of Pavements on the Non-Interstate NHS in Good Condition. Question No Description Field Type P8 The baseline statewide percentage of pavements on the Non-Interstate NHS in Good condition. This value is from the 2018 Baseline Performance Period Report, and is the condition derived from the latest data collected through the beginning date of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] For the first performance period, FHWA calculated this value using IRI only (or PSR values for road sections where speed is less than 40 mph). [23 CFR 490.313(e)] 63.4 P9 The 2-year statewide percentage of pavements on the Non- Interstate NHS in Good condition. This value is the actual 2- year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] 63.0 Grand Island Regular Session - 11/24/2020 Page 87 / 167 Page 7 of 29 For the first performance period, FHWA calculated this value using IRI only (or PSR values for road sections where speed is less than 40 mph). [23 CFR 490.313(e)] P10 If the State DOT reported its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition based on “Full Distress + IRI” data in the 2018 Baseline Performance Period Report, FHWA has calculated an actual condition level using “Full Distress + IRI” data. [23 CFR 490.313 (c) and (d)] When a State DOT reported the 2-year target based on “Full Distress + IRI” data, FHWA will use this value to determine whether the actual condition level is equal to or better than the established 2-year target as part of the 2-year significant progress determination. [23 CFR 490.109(e)(2)(ii)] 58.1 P11 The 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 40.0 P12 Please provide a discussion of the progress made toward achieving the 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year condition with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B) For State DOTs that established a 2-year target using IRI only, the baseline value (P17), actual condition calculated with IRI only (P18), and the 2-year target (P20) all use the same metrics and can be compared to each other. State DOTs that established a 2-year target using “Full Distress + IRI” will see an actual condition value in both P18 and P19. These values must be used correctly in order to provide a meaningful discussion of progress. [23 CFR 490.107(b)(2)(ii)(B)] -The actual condition calculated with IRI only (P18) is ONLY comparable to the baseline value calculated with IRI only (P17). -The actual condition calculated with “Full Distress + IRI” (P19) is ONLY comparable to the State DOT’s 2-year target established based on “Full distress + IRI” (P20). NDOT’s 2-year target using full distress + IRI was achieved and exceeded. The initial target was set based on historical condition data and projected funding. The target was initially set somewhat conservatively due to limited data. Due to a change in how cracking is measured (previously a cracking index vs. wheel path cracking) historical cracking data is limited to two years. As additional data is obtained to establish a reliable trend, the target will be re- evaluated. In addition, NDOT is currently experiencing unusual financial instability due to impacts of historic flooding in 2019, reduced revenues resulting from the Covid 19 Epidemic, and significant construction inflation pricing. Projected funding levels are expected to result in a decrease in system performance. Given limited data and financial uncertainty, NDOT chose to keep the same target. P13 The 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 40.0 P14 Does the State DOT wish to adjust the 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition? [23 CFR 490.105(e)(6)] No Grand Island Regular Session - 11/24/2020 Page 88 / 167 Page 8 of 29 P14a Please provide the adjusted 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5. [23 CFR 490.101 (Target definition) and 23 CFR 490.313(f)(4)] P14b Please provide the basis for adjustment of the 4-year target for the statewide percentage of pavements on the Non- Interstate NHS in Good condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] P15 Please provide a summary of prior accomplishments and planned activities that will be conducted during the remainder of the performance period to make significant progress toward achievement of the 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition. [23 CFR 490.107(b)(2)(ii)(F)] NDOT’s 2-year target using full distress + IRI was achieved and exceeded. NDOT will continue to employ the investment strategies emphasizing pavement preservation in accordance with the approved Transportation Asset Management Plan to meet performance targets, maintain the system in a state of good repair, and make the most of scarce taxpayer dollars. P16 Are there any extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition? [23 CFR 490.107(b)(2)(ii)(G)] No P16a Please select the extenuating circumstance(s) that apply. [23 CFR 490.109(e)(5)] P16b Please explain the extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition and quantify the impacts that resulted from these circumstances. [23 CFR 490.107(b)(2)(ii)(G)] Statewide Performance Target for the Percentage of Pavements on the Non-Interstate NHS in Poor Condition. Question No Description Field Type P17 The baseline statewide percentage of pavements on the Non-Interstate NHS in Poor condition. This value is from the 2018 Baseline Performance Period Report, and is the condition derived from the latest data collected through the beginning date of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] For the first performance period, FHWA calculated this value 11.5 Grand Island Regular Session - 11/24/2020 Page 89 / 167 Page 9 of 29 using IRI only (or PSR values for road sections where speed is less than 40 mph). [23 CFR 490.313(e)] P18 The 2-year statewide percentage of pavements on the Non- Interstate NHS in Poor condition. This value is the actual 2- year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] For the first performance period, FHWA calculated this value using IRI only (or PSR values for road sections where speed is less than 40 mph). [23 CFR 490.313(e)] 12.2 P19 If the State DOT reported its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition based on “Full Distress + IRI” data in the 2018 Baseline Performance Period Report, FHWA has calculated an actual condition level using “Full Distress + IRI” data. [23 CFR 490.313 (c) and (d)] When a State DOT reported the 2-year target based on “Full Distress + IRI” data, FHWA will use this value to determine whether the actual condition level is equal to or better than the established 2-year target as part of the 2-year significant progress determination. [23 CFR 490.109(e)(2)(ii)] 2.1 P20 The 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 10.0 P21 Please provide a discussion of the progress made toward achieving the 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year condition with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] For State DOTs that established a 2-year target using IRI only, the baseline value (P17), actual condition calculated with IRI only (P18), and the 2-year target (P20) all use the same metrics and can be compared to each other. State DOTs that established a 2-year target using “Full Distress + IRI” will see an actual condition value in both P18 and P19. These values must be used correctly in order to provide a meaningful discussion of progress. [23 CFR 490.107(b)(2)(ii)(B)] -The actual condition calculated with IRI only (P18) is ONLY comparable to the baseline value calculated with IRI only (P17). -The actual condition calculated with “Full Distress + IRI” (P19) is ONLY comparable to the State DOT’s 2-year target established based on “Full distress + IRI” (P20). NDOT’s 2-year target using full distress + IRI was achieved. The initial target was set based on historical condition data and projected funding. The target was initially set somewhat conservatively due to limited data. Due to a change in how cracking is measured (previously a cracking index vs. wheel path cracking) historical cracking data is limited to two years. As additional data is obtained to establish a reliable trend, the target will be re- evaluated. In addition, NDOT is currently experiencing unusual financial instability due to impacts of historic flooding in 2019, reduced revenues resulting from the Covid 19 Epidemic, and significant construction inflation pricing. Projected funding levels are expected to result in a decrease in system performance. Given limited data and financial uncertainty, NDOT chose to keep the same target. P22 The 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 10.0 Grand Island Regular Session - 11/24/2020 Page 90 / 167 Page 10 of 29 P23 Does the State DOT wish to adjust the 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition? [23 CFR 490.105(e)(6)] No P23a Please provide the adjusted 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.313(f)(5)] P23b Please provide the basis for adjustment of the 4-year target for the statewide percentage of pavements on the Non- Interstate NHS in Poor condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] P24 Please provide a summary of prior accomplishments and planned activities that will be conducted during the remainder of the performance period to make significant progress toward achievement of the 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition. [23 CFR 490.107(b)(2)(ii)(F)] NDOT’s 2-year target using full distress + IRI was achieved. NDOT will continue to employ the investment strategies emphasizing pavement preservation in accordance with the approved Transportation Asset Management Plan to meet performance targets, maintain the system in a state of good repair, and make the most of scarce taxpayer dollars. P25 Are there any extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition for the 2018-2021 Performance Period? [23 CFR 490.107(b)(2)(ii)(G)] No P25a Please select the extenuating circumstance(s) that apply. [23 CFR 490.109(e)(5)] P25b Please explain the extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition and quantify the impacts that resulted from these circumstances. [23 CFR 490.107(b)(2)(ii)(G)] Grand Island Regular Session - 11/24/2020 Page 91 / 167 Page 11 of 29 Bridge Bridge Performance Overview Question No Description Field Type B1 Please use this space to provide any general comments that may assist FHWA in its review of this part of the submission. You can use this space to provide greater context for your targets and current condition, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) Targets for bridge conditions have been met. No change to performance targets is proposed for the next review period. Statewide Performance Target for Bridges on the NHS Classified as in Good Condition Question No Description Field Type B2 The baseline statewide percentage of deck area of bridges on the NHS classified as in Good condition. This value is from the 2018 Baseline Performance Period Report, and is the condition derived from the latest data collected through the beginning date of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] 61.0 B3 The 2-year statewide percentage of deck area of bridges on the NHS classified as in Good condition. This value is the actual 2-year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] 56.5 B4 The 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 55.0 B5 Please provide a discussion of the progress made toward achieving the 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year condition achieved (based on data contained within the National Bridge Inventory as of June 15, 2020, and made available by FHWA) with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] Combined State and Local system NHS bridges are currently at 57.0% Good condition. It is anticipated that some large bridges could impact this measure if deck transitions from 7 to 6 in the next inspection cycle. B6 The 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 55.0 B7 Does the State DOT wish to adjust the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition? [23 CFR 490.105(e)(6)] No Grand Island Regular Session - 11/24/2020 Page 92 / 167 Page 12 of 29 B7a Please provide the adjusted 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.409(c)(1)] B7b Please provide the basis for adjustment of the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] B8 Please provide a summary of prior accomplishments and planned activities that will be conducted during the remainder of the performance period to make significant progress toward achievement of the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition. [23 CFR 490.107(b)(2)(ii)(F)] The scheduled bridge construction program has been delivered as anticipated with an emphasis on strategies that slow deterioration and minimize future costs. B9 Are there any extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition for the 2018-2021 Performance Period? [23 CFR 490.107(b)(2)(ii)(G)] No B9a Please select the extenuating circumstance(s) that apply. [23 CFR 490.109(e)(5)] B9b Please explain the extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition and quantify the impacts that resulted from these circumstances. [23 CFR 490.107(b)(2)(ii)(G)] Statewide Performance Target for Bridges on the NHS Classified as in Poor Condition Question No Description Field Type B10 The baseline statewide percentage of deck area of bridges on the NHS classified as in Poor condition. This value is from the 2018 Baseline Performance Period Report, and is the condition derived from the latest data collected through the beginning date of the performance 1.9 Grand Island Regular Session - 11/24/2020 Page 93 / 167 Page 13 of 29 period. [23 CFR 490.107(b)(1)(ii)(B)] B11 The 2-year statewide percentage of deck area of bridges on the NHS classified as in Poor condition. This value is the actual 2-year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] 1.9 B12 The 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 10.0 B13 Please provide a discussion of the progress made toward achieving the 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year condition achieved (based on data contained within the National Bridge Inventory as of June 15, 2020, and made available by FHWA) with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] Performance Targets for percent Poor on the NHS have been met. B14 The 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 10.0 B15 Does the State DOT wish to adjust the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition? [23 CFR 490.105(e)(6)] No B15a Please provide the adjusted 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.409(c)(2)] B15b Please provide the basis for adjustment of the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] B16 Please provide a summary of prior accomplishments and planned activities that will be conducted during the remainder The scheduled bridge construction program has been delivered as Grand Island Regular Session - 11/24/2020 Page 94 / 167 Page 14 of 29 of the performance period to make significant progress toward achievement of the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition. [23 CFR 490.107(b)(2)(ii)(F)] anticipated with an emphasis on strategies that slow deterioration and minimize future costs. B17 Are there any extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition for the 2018-2021 Performance Period? [23 CFR 490.107(b)(2)(ii)(G)] No B17a Please select the extenuating circumstance(s) that apply. [23 CFR 490.109(e)(5)] B17b Please explain the extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition and quantify the impacts that resulted from these circumstances. [23 CFR 490.107(b)(2)(ii)(G)] Grand Island Regular Session - 11/24/2020 Page 95 / 167 Page 15 of 29 Reliability Travel Time Reliability Performance Overview Question No Description Field Type R1 Please use this space to provide any general comments that may assist FHWA in its review of this part of the submission. You can use this space to provide greater context for your targets and current performance, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) Statewide Performance Target for the Percent of the Person-Miles Traveled on the Interstate That Are Reliable Question No Description Field Type R2 The baseline statewide percent of the person-miles traveled on the Interstate that are reliable. This value is from the 2018 Baseline Performance Period Report, and is the condition derived from the latest data collected through the beginning date of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] 98.9 R3 The 2-year statewide percent of the person-miles traveled on the Interstate that are reliable. This value is the actual 2-year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] 97.5 R4 The 2-year target for the statewide percent of the person- miles traveled on the Interstate that are reliable for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 98.9 R5 Please provide a discussion of the progress made toward achieving the 2-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] Nebraska’s 2-year performance was 97.5 compared to a target of 98.9. The target of 98.9 was based on performance in 2017 alone, as a trendline had not yet been established when the target was set. The 2 year performance of 97.5 shows strong reliability while not achieving the target. The nominal difference can be explained by traffic congestion variability, variable weather impacts, etc. Nebraska has managed to maintain its strong reliability rate through existing high levels of performance and scheduled roadway improvements. R6 The 4-year target for the statewide percent of the person- miles traveled on the Interstate that are reliable for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 98.9 Grand Island Regular Session - 11/24/2020 Page 96 / 167 Page 16 of 29 R7 Does the State DOT wish to adjust the 4-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable? [23 CFR 490.105(e)(6)] Yes R7a Please provide the adjusted 4-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.513(b)] 94.0 R7b Please provide the basis for adjustment of the 4-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] Nebraska’s adjustment to 94.0 is based on trend analysis of performance in 2017-2019. The 2017 performance was 98.9 and was utilized to set the baseline since NDOT had no previous reliability data from which to draw a trend. The 2018 performance was also 98.9 before dropping to 97.4 in 2019. This drop suggests a slight negative trend in performance, though existing high levels of performance and planned improvements as part of NDOT’s ongoing project selection process will enable NDOT to maintain strong performance levels. A projection of 94.0 is consistent with this trendline while still setting a goal of strong reliability. R8 Please provide a summary of prior accomplishments and planned activities that will be conducted during the remainder of the performance period to make significant progress toward achievement of the 4-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable. [23 CFR 490.107(b)(2)(ii)(F)] NDOT continues to include reliability performance in its design and project selection processes and is exploring options for investing in intermodal sites, which could result in reduced freight congestion. R9 Are there any extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(G)] No R9a Please select the extenuating circumstance(s) that apply. [23 CFR 490.109(e)(5)] R9b Please explain the extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide Grand Island Regular Session - 11/24/2020 Page 97 / 167 Page 17 of 29 percent of the person-miles traveled on the Interstate that are reliable and quantify the impacts that resulted from these circumstances. [23 CFR 490.107(b)(2)(ii)(G)] Statewide Performance Target for the Percent of the Person-Miles Traveled on the Non-Interstate NHS That Are Reliable Question No Description Field Type R10 The 2-year statewide percent of the person-miles traveled on the non-Interstate NHS that are reliable. This value is the actual 2-year performance derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] For the 2018-2021 Performance Period, this 2-year performance value will be used as the baseline value for this measure per the phase-in of new requirements for this measure. [23 CFR 490.105(e)(7)(iii)] 91.3 R11 The 4-year target for the statewide percent of the person- miles traveled on the non-Interstate NHS that are reliable for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 92.6 R12 Does the State DOT wish to adjust the 4-year target for the statewide percent of the person-miles traveled on the non- Interstate NHS that are reliable? [23 CFR 490.105(e)(6)] Yes R12a Please provide the adjusted 4-year target for the statewide percent of the person-miles traveled on the non-Interstate NHS that are reliable. The adjusted target should reflect expected performance by the end of the Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.513(c)] 88.0 R12b Please provide the basis for adjustment of the 4-year target for the statewide percent of the person-miles traveled on the non-Interstate NHS that are reliable and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] Nebraska’s adjustment to 88.0 is based on trend analysis of performance in 2017-2019. The 2017 performance was 92.6, 2018 was 92.2, and 2019 was 91.3. This trend suggests a slight decline in performance, though existing high levels of performance and planned improvements as part of asset management and capital improvement projects will enable NDOT to maintain strong performance levels. A projection of 88.0 is consistent with this trendline while still setting a goal of strong reliability. Grand Island Regular Session - 11/24/2020 Page 98 / 167 Page 18 of 29 Grand Island Regular Session - 11/24/2020 Page 99 / 167 Page 19 of 29 Freight Freight Reliability (Movement) Performance Overview Question No Description Field Type F1 Please use this space to provide any general comments that may assist FHWA in its review of this part of the submission. You can use this space to provide greater context for your targets and current performance, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) F2 Please discuss progress of the State DOT’s efforts in addressing congestion at truck freight bottlenecks within the State (described in § 490.107(b)(1)(ii)(E)) through comprehensive freight improvement efforts of State Freight Plan or MPO freight plans; the Statewide Transportation Improvement Program and Transportation Improvement Program; regional or corridor level efforts; other related planning efforts; and operational and capital activities targeted to improve freight movement on the Interstate System. If the State has prepared a State Freight Plan under 49 U.S.C. 70202, within the previous 2 years, then it may serve as the basis for addressing congestion at truck freight bottlenecks. If the State Freight Plan has not been updated since the previous State Biennial Performance Report, then an updated analysis of congestion at truck freight bottlenecks must be completed. [23 CFR 490.107(b)(2)(ii)(D)] Please upload related document(s) in the “Attachment” tab. In 2017, the NDOT finalized its first state freight plan. At that time, certain aspects of the freight plan highlighted the opportunity to mitigate freight bottlenecks and limit truck congestion on the state highway system. In addition, the mitigation of bottlenecks was identified by freight stakeholders as a priority for NDOT and its freight project evaluation criteria. Subsequently, the NDOT identified and reported a variety of bottlenecks to the FHWA reporting portal in 2018, based on 1 years’ worth of data. Subsequently, the NDOT utilized the data from 2017 to identify a variety of bottlenecks which were provided via attachment to the FHWA reporting portal in 2018. Beyond this, bottlenecks were one of many “needs and opportunities” identified and prioritized through the planning process. Other opportunities included, “Support Freight Related Development”, “Prepare for Future Growth”, and “Preserve the Highway Condition”, to name a few. Based on these things, the State Freight Plan’s associated Freight Investment Plan was developed to address these high priority opportunities. This investment plan includes projects along I-80, which is a prominent freight corridor in Nebraska and is listed as part of the National Freight Network. . These projects are large reconstruction projects that maintain the existing asset and ensure continued freight flows across the country. Since the reach of the freight investment plan was limited to I-80, Grand Island Regular Session - 11/24/2020 Page 100 / 167 Page 20 of 29 the NDOT routinely assesses whether bottlenecks exist by reviewing travel times and truck travel reliability performance data. These reviews include a high-level review of the State (as a whole) and its MPOs. For example, the state’s largest MPO, which encompasses the Omaha metropolitan area, had a TTTR of 1.37 in 2019. As a state, TTTR was 1.15 in 2019. In either case, the TTTR performance was still well below 1.5, which is considered to be the national threshold for reliable truck travel. With this in mind, the NDOT has revised its definition of a bottleneck to reflect the national threshold. This change is based on a comparison of Nebraska’s reliability to performance in other states. As a result, this has caused the NDOT to conclude there are no bottlenecks in the state. Despite this, the NDOT will continue to monitor performance data for bottlenecks. In addition, this definition of bottlenecks will be revisited with stakeholders as part of the 2022 update of the Nebraska State Freight Plan and full Biennial Performance Report. Grand Island Regular Session - 11/24/2020 Page 101 / 167 Page 21 of 29 Peak Hour Excess Delay (PHED) Annual Hours of Peak Hour Excessive Delay (PHED) Per Capita Performance Overview Question No Description Field Type D1 Please use this space to provide any general comments that may assist FHWA in its review of this part of the submission. You can use this space to provide greater context for your targets and current performance, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) D2 The total number of applicable UZA(s) required to establish targets and report progress for the Traffic Congestion Measures in your State are: Grand Island Regular Session - 11/24/2020 Page 102 / 167 Page 22 of 29 Question No Description Field Type E11 The baseline emissions reductions (total daily kilograms) of PM2.5. This value is from the 2018 Baseline Performance Period Report and is the performance derived from the latest data collected through the cumulative statewide estimated emissions reductions (total daily kilograms) for the previous 4 Federal Fiscal Years before the start of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] This value is carried over from the 2018 Baseline Performance Period Report. E12 Please provide the current estimated emissions reductions (total daily kilograms) of PM2.5. [23 CFR 490.107(b)(2)(ii)(A) and 23 CFR 490.107(c)(3)(iii)(B)] The current data for the performance period must include the cumulative reductions in emissions (total daily kilograms) over the Federal Fiscal Years 2018 and 2019. The data needed to calculate the measure shall come from the CMAQ Public Access System. [23 CFR 490.809(a) and 23 CFR 490(b)(2). The data must be reported to the nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] FHWA provided the prepopulated data from the CMAQ Public Access System. If the DOT feels that a different value is appropriate due to an error, please contact the FHWA Division Office in your State. E13 The 2-year target for cumulative emissions reduction (total daily kilograms) of PM2.5 for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E14 Please provide a discussion of the progress made toward achieving the 2-year target for cumulative emissions reduction (total daily kilograms) of PM2.5. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] E15 The 4-year target for cumulative emissions reduction (total daily kilograms) of PM2.5 established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E16 Does the State DOT wish to adjust the 4-year target for cumulative emissions reduction (total daily kilograms) of PM2.5? [23 CFR 490.105(e)(6)] Grand Island Regular Session - 11/24/2020 Page 103 / 167 Page 23 of 29 E16a Please provide the adjusted 4-year target for cumulative emissions reduction (total daily kilograms) of PM2.5. The adjusted target should reflect expected performance by the end of Federal Fiscal Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] E16b Please provide the basis for adjustments of the 4-year target for cumulative emissions reduction (total daily kilograms) of PM2.5 established for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(E) and 23 CFR 490.107(c)(3)(ii)(B)] Statewide Total Emission Reductions NOx Target #2 Question No Description Field Type E17 The baseline emissions reductions (total daily kilograms) of NOx. This value is from the 2018 Baseline Performance Period Report and is the performance derived from the latest data collected through the cumulative statewide estimated emissions reductions (total daily kilograms) for the previous 4 Federal Fiscal Years before the start of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] E18 Please provide the current estimated emissions reductions (total daily kilograms) of NOx. [23 CFR 490.107(b)(2)(ii)(A) and 23 CFR 490.107(c)(3)(iii)(B)] The current data for the performance period must include the cumulative reductions in emissions (total daily kilograms) over the Federal Fiscal Years 2018 and 2019. The data needed to calculate the measure shall come from the CMAQ Public Access System. [23 CFR 490.809(a) and 23 CFR 490(b)(2). The data must be reported to the nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] FHWA provided the prepopulated data from the CMAQ Public Access System. If the DOT feels that a different value is appropriate due to an error, please contact the FHWA Division Office in your State. E19 The 2-year target for cumulative emissions reduction (total daily kilograms) of NOx for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E20 Please provide a discussion of the progress made toward achieving the 2-year target for cumulative emissions reduction (total daily kilograms) of NOx. At a minimum, this discussion should address overall progress as of the Grand Island Regular Session - 11/24/2020 Page 104 / 167 Page 24 of 29 midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2- year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] E21 The 4-year target for cumulative emissions reduction (total daily kilograms) of NOx established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E22 Does the State DOT wish to adjust the 4-year target for cumulative emissions reduction (total daily kilograms) of NOx? [23 CFR 490.105(e)(6)] E22a Please provide the adjusted 4-year target for cumulative emissions reduction (total daily kilograms) of NOx. The adjusted target should reflect expected performance by the end of Federal Fiscal Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] E22b Please provide the basis for adjustments of the 4-year target for cumulative emissions reduction (total daily kilograms) of NOx established for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(E) and 23 CFR 490.107(c)(3)(ii)(B)]. Statewide Total Emission Reductions VOC Target #3 Question No Description Field Type E23 The baseline emissions reductions (total daily kilograms) of VOC. This value is from the 2018 Baseline Performance Period Report and is the performance derived from the latest data collected through the cumulative statewide estimated emissions reductions (total daily kilograms) for the previous 4 Federal Fiscal Years before the start of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] E24 Please provide the current estimated emissions reductions (total daily kilograms) of VOC. [23 CFR 490.107(b)(2)(ii)(A) and 23 CFR 490.107(c)(3)(iii)(B)] The current data for the performance period must include the cumulative reductions in emissions (total daily kilograms) over the Federal Fiscal Years 2018 and 2019. The data needed to calculate the measure shall come from the CMAQ Public Access System. [23 CFR 490.809(a) and 23 CFR 490(b)(2). The data must be reported to the nearest one Grand Island Regular Session - 11/24/2020 Page 105 / 167 Page 25 of 29 thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] FHWA provided the prepopulated data from the CMAQ Public Access System. If the DOT feels that a different value is appropriate due to an error, please contact the FHWA Division Office in your State. E25 The 2-year target for cumulative emissions reduction (total daily kilograms) of VOC for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E26 Please provide a discussion of the progress made toward achieving the 2-year target for cumulative emissions reduction (total daily kilograms) of VOC. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] E27 The 4-year target for cumulative emissions reduction (total daily kilograms) of VOC established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E28 Does the State DOT wish to adjust the 4-year target for cumulative emissions reduction (total daily kilograms) of VOC? [23 CFR 490.105(e)(6)] E28a Please provide the adjusted 4-year target for cumulative emissions reduction (total daily kilograms) of VOC. The adjusted target should reflect expected performance by the end of Federal Fiscal Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] E28b Please provide the basis for adjustments of the 4-year target for cumulative emissions reduction (total daily kilograms) of VOC established for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(E) and [23 CFR 490.107(c)(3)(ii)(B)]. Statewide Total Emission Reductions PM10 Target #4 Question No Description Field Type E29 The baseline emissions reductions (total daily kilograms) of PM10. Grand Island Regular Session - 11/24/2020 Page 106 / 167 Page 26 of 29 This value is from the 2018 Baseline Performance Period Report and is the performance derived from the latest data collected through the cumulative statewide estimated emissions reductions (total daily kilograms) for the previous 4 Federal Fiscal Years before the start of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] E30 Please provide the current estimated emissions reductions (total daily kilograms) of PM10. [23 CFR 490.107(b)(2)(ii)(A) and 23 CFR 490.107(c)(3)(iii)(B)] The current data for the performance period must include the cumulative reductions in emissions (total daily kilograms) over the Federal Fiscal Years 2018 and 2019. The data needed to calculate the measure shall come from the CMAQ Public Access System. [23 CFR 490.809(a) and 23 CFR 490(b)(2). The data must be reported to the nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] FHWA provided the prepopulated data from the CMAQ Public Access System. If the DOT feels that a different value is appropriate due to an error, please contact the FHWA Division Office in your State. E31 The 2-year target for cumulative emissions reduction (total daily kilograms) of PM10 for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E32 Please provide a discussion of the progress made toward achieving the 2-year target for cumulative emissions reduction (total daily kilograms) of PM10. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] E33 The 4-year target for cumulative emissions reduction (total daily kilograms) of PM10 established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E34 Does the State DOT wish to adjust the 4-year target for cumulative emissions reduction (total daily kilograms) of PM10?[23 CFR 490.105(e)(6)] E34a Please provide the adjusted 4-year target for cumulative emissions reduction (total daily kilograms) of PM10. The adjusted target should reflect expected performance by the end of Federal Fiscal Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] Grand Island Regular Session - 11/24/2020 Page 107 / 167 Page 27 of 29 This adjusted target must be reported to nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] E34b Please provide the basis for adjustments of the 4-year target for cumulative emissions reduction (total daily kilograms) of PM10 established for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(E) and 23 CFR 490.107(c)(3)(ii)(B)]. Statewide Total Emission Reductions CO Target #5 Question No Description Field Type E35 The baseline emissions reductions (total daily kilograms) of CO. This value is from the 2018 Baseline Performance Period Report and is the performance derived from the latest data collected through the cumulative statewide estimated emissions reductions (total daily kilograms) for the previous 4 Federal Fiscal Years before the start of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] E36 Please provide the current estimated emissions reductions (total daily kilograms) of CO. [23 CFR 490.107(b)(2)(ii)(A) and 23 CFR 490.107(c)(3)(iii)(B)] The current data for the performance period must include the cumulative reductions in emissions (total daily kilograms) over the Federal Fiscal Years 2018 and 2019. The data needed to calculate the measure shall come from the CMAQ Public Access System. [23 CFR 490.809(a) and 23 CFR 490(b)(2). The data must be reported to the nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] FHWA provided the prepopulated data from the CMAQ Public Access System. If the DOT feels that a different value is appropriate due to an error, please contact the FHWA Division Office in your State. E37 The 2-year target for cumulative emissions reduction (total daily kilograms) of CO for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E38 Please provide a discussion of the progress made toward achieving the 2-year target for cumulative emissions reduction (total daily kilograms) of CO. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] Grand Island Regular Session - 11/24/2020 Page 108 / 167 Page 28 of 29 (total daily kilograms) of CO established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E39 The 4-year target for cumulative emissions reduction (total daily kilograms) of CO established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E40 Does the State DOT wish to adjust the 4-year target for cumulative emissions reduction (total daily kilograms) of CO? [23 CFR 490.105(e)(6)] E40a Please provide the adjusted 4-year target for cumulative emissions reduction (total daily kilograms) of CO. The adjusted target should reflect expected performance by the end of Federal Fiscal Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] E40b Please provide the basis for adjustments of the 4-year target for cumulative emissions reduction (total daily kilograms) of CO established for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(E) and 23 CFR 490.107(c)(3)(ii)(B)]. Grand Island Regular Session - 11/24/2020 Page 109 / 167 Page 29 of 29 Attachments S.No Section Attachment Detail Filename: Notes: Attachment Url: There are no attachments. Grand Island Regular Session - 11/24/2020 Page 110 / 167 GIAMPO RESOLUTION NO. 2020-7 Grand Island Area Metropolitan Planning Organization A Resolution Approving the MPO Targets for NHS Pavement and Bridge Condition Performance Measures WHEREAS, the Grand Island Area Metropolitan Planning Organization (GIAMPO), is designated as the Metropolitan Planning Organization (MPO) for the Grand Island Urbanized Area, by the Governor acting through the Nebraska Department of Transportation in cooperation with locally elected officials of the Grand Island Urbanized Area; and WHEREAS, the Moving Ahead for Progress in the 21st Century Act (MAP-21) required the U.S. Secretary of Transportation to develop rules to establish a system to monitor and manage public transportation assets, to improve safety and increase reliability and performance, and to establish performance measures, and the Fixing America’s Surface Transportation (FAST) Act reaffirmed this requirement; and WHEREAS, the Pavement and Bridge Condition Final 23 CFR Part 490 became effective May 20, 2017 and establishes targets for the following six performance measures: Performance Measures Pavement • Percentage of Pavements of the Interstate System in Good Condition • Percentage of Pavements of the Interstate System in Poor Condition • Percentage of Pavements of the Non-Interstate NHS in Good Condition • Percentage of Pavements of the Non-Interstate NHS in Poor Condition Bridge • Percentage of NHS Bridges Classified as in Good Condition • Percentage of NHS Bridges Classified as in Poor Condition WHEREAS, the Nebraska Department of Transportation is to adopt the pavement and bridge condition performance measures by May 20, 2018; and WHEREAS, the MPO Policy Board may establish pavement and bridge condition targets by agreeing to plan and program projects that contribute toward the accomplishment of the State’s targets, or establish its own targets within 180 days of the State establishing and reporting its pavement and bridge condition targets; and WHEREAS, the GIAMPO will adopt to support the 4-year performance period (CY Grand Island Regular Session - 11/24/2020 Page 111 / 167 2018-2021) targets for the Nebraska Department of Transportation; and WHEREAS, the MPO targets for pavement and bridge condition performance measures has been reviewed and recommended for adoption by the MPO Technical Advisory Committee (TAC), and now require official approval from the MPO Policy Board; and NOW, THEREFORE BE IT RESOLVED, that the Policy Board of the Grand Island Area Metropolitan Planning Organization has agreed to support the Nebraska Department of Transportation 4-year performance period (CY 2018-2021) targets for pavement and bridge condition performance measures as identified in Exhibit A. BE IT FURTHER RESOLVED, that the Chairperson is hereby authorized and directed to execute such agreement on behalf of the Grand Island Area Metropolitan Planning Organization. Certification: The foregoing resolution was approved by the Grand Island Area Metropolitan Planning Organization Policy Board at its regularly scheduled meeting on November 24, 2020. By: Attest: ______________________________ ______________________________ Jeremy Jensen, Mayor / Chairperson John Collins, Public Works Director Grand Island Regular Session - 11/24/2020 Page 112 / 167 Exhibit A Nebraska 4-Year Performance Period (CY 2018-2021) Targets for Pavement and Bridge Condition Performance Measures The Nebraska Department of Transportation established the below targets for the National Highway System (NHS) Pavement and Bridge Condition performance measures. • At least 50% of pavements of the Interstate System in Good condition. • No more than 5% of pavements of the Interstate System in Poor condition. • At least 40% of the Non-Interstate NHS in Good condition. • No more than 10% of the Non-Interstate NHS in Poor condition. • No more than 10% of the total deck area of bridges in the state on the NHS is located on bridges that have been classified as structurally deficient. • At least 55% of bridges on the State system and NHS in Good or Fair condition. Grand Island Regular Session - 11/24/2020 Page 113 / 167 GIAMPO – Policy Board Tuesday, November 24, 2020 Regular Session Item E4 Approval of MPO Targets for NHS Travel Time Reliability and Freight Reliability Performance Measures Staff Contact: Andres Gomez, MPO Program Manager Grand Island Regular Session - 11/24/2020 Page 114 / 167 1 Policy Board Agenda Report Agenda Item No. E4 November 24, 2020 ISSUE VOTE: MPO Targets for NHS Travel Time Reliability and Freight Reliability Performance Measures BACKGROUND The current and previous federal transportation bills, FAST Act and MAP-21, respectively, included a series of requirements for Transportation Performance Management (TPM). Since the passage of MAP-21, USDOT has worked through the federal rulemaking process to establish a series of performance measures and corresponding target setting requirements. Generally, the performance measures relate to national goals of safety, infrastructure condition, air quality, and transportation system performance. Final USDOT rules related to TPM established performance measures for system performance and freight (PM3), which are two performance measures for NHS Travel Time Reliability and one performance measure for Freight Reliability (see attached TPM fact sheet). State DOTs were required to establish performance targets for these measures by May 20, 2018. MPOs have the option of supporting the statewide targets, or establishing their own regional targets within 180 days of the establishment of state targets. Therefore, all Nebraska MPOs must adopt targets for NHS Travel Time Reliability and Freight Reliability performance measures by November 17, 2018. After two years there will be a mid-point review, at which point the targets could be adjusted for NDOT and MPOs based on collected data. State DOTs will establish targets every four years. GIAMPO staff recommends the support of the NDOT NHS Travel Time Reliability and Freight Reliability performance targets (see attached Mid Performance Period Progress Report) as the most prudent alternative. The core reasons to not establishing regional targets include the following: •GIAMPO region outperforms the State on all performance measures. •The Interstate and Non-Interstate NHS routes in the GIAMPO metropolitan planning area are State NHS routes. Nebraska PM3 Performance Measures and Target Setting The Nebraska DOT completed their mid- performance period progress report on October 1, 2020. NDOT adjusted the targets based on data collection. The original and adjusted targets are in the table below. Grand Island Regular Session - 11/24/2020 Page 115 / 167 2 Performance Measures Baseline 2-Year Target Original 4- Year Target Updated 4- Year Target % Change % of Reliable Person Miles Traveled on Interstate 98.6 98.6 98.6 94.0 (-) 4.6 % of Reliable Person Miles Traveled on Non- Interstate 92.6 88.0 (-) 4.6 Truck Travel Time Reliability 1.10 1.10 1.10 1.25 (+) .15 POLICY CONSIDERATIONS/DISCUSSION With supporting the statewide targets, GIAMPO is agreeing to plan and program projects in a manner that contributes towards the accomplishment of the NDOT NHS Travel Time Reliability and Freight Reliability performance targets. These targets will ultimately be integrated into the GIAMPO Long Range Transportation Plan and Transportation Improvement Program. BUDGET CONSIDERATIONS None. COMMITTEE ACTION The TAC approved the recommendation to support the state targets as the MPO NHS Travel Time Reliability and Freight Reliability performance targets for the GIAMPO metropolitan planning area on October 19, 2020. RECOMMENDATION Approve to support state targets as the MPO NHS Travel Time Reliability and Freight Reliability performance targets for the GIAMPO metropolitan planning area. STAFF CONTACTS Andres Gomez Grand Island Regular Session - 11/24/2020 Page 116 / 167 TRANSPORTATION PERFORMANCE MANAGEMENT The Federal Highway Administration (FHWA) has finalized six interrelated performance rulemakings to implement the TPM framework established by the Moving Ahead for Progress in the 21st Century Act (MAP-21) and the Fixing America’s Surface Transportation (FAST) Act. Collectively, the rules address challenges facing the U.S. transportation system, including: •improving safety •maintaining infrastructure condition •reducing traffic congestion •improving efficiency of the system and freight movement •protecting the environment and •reducing delays in project delivery. The rules establish national performance measures; State Departments of Transportation (DOTs) and metropolitan planning organizations (MPOs) will establish targets for applicable measures. New and existing plans will document the strategies and investments used to achieve the targets; progress toward the targets will be reported through new and existing mechanisms. Learn more at the FHWA TPM web site: (http://www.fhwa.dot.gov/tpm/ Grand Island Regular Session - 11/24/2020 Page 117 / 167 NHS Travel Time Reliability Measures WHAT: Measurement of travel time reliability on the Interstate and non- Interstate National Highway System (NHS). Read the final rule in the Federal Register [82 FR 5970 (January 18, 2017)]. WHO:State DOTs, as well as MPOs with Interstate and/or non-Interstate NHS within their metropolitan planning area. WHY: Through MAP-21, Congress required FHWA to establish measures to assess performance in 12 areas, including performance on the Interstate and non-Interstate NHS. [See 23 CFR 490.507(a)] WHEN:Implementation differs for the Interstate and non-Interstate NHS measures for the first performance period. State DOTs must establish 2-and 4- year targets for the Interstate, but only a 4-year target for the non-Interstate NHS, by May 20, 2018. Those targets will be reported in the State’s baseline performance period report due by October 1, 2018. The State DOTs have the option to adjust 4-year targets in their mid performance period progress report, due October 1, 2020. For the first performance period only, there is no requirement for States to report baseline condition/performance or 2-year targets for the non-Interstate NHS before the mid performance period progress report. This will allow State DOTs to consider more complete data. The process will align for both Interstate and non-Interstate measures with the beginning of the second performance period on January 1, 2022. MPOs must either support the State target or establish their own quantifiable 4- year targets within 180 days of the State target establishment. HOW: Level of Travel Time Reliability (LOTTR) is defined as the ratio of the longer travel times (80th percentile) to a “normal” travel time (50th percentile), using data from FHWA’s National Performance Management Research Data Set (NPMRDS) or equivalent. Data are collected in 15-minute segments during all time periods between 6 a.m. and 8 p.m. local time. The measures are the percent of person-miles traveled on the relevant portion of the NHS that are reliable. Person-miles take into account the users of the NHS. Data to reflect the users can include bus, auto, and truck occupancy levels. Note: The FHWA is preparing guidance on how all rules should be implemented. Grand Island Regular Session - 11/24/2020 Page 118 / 167 Freight Reliability Measure WHAT: Measurement of travel time reliability on the Interstate System (Truck Travel Time Reliability (TTTR) Index). Read the final rule in the Federal Register [82 FR 5970 (January 18, 2017)]. WHO: State DOTs and MPOs. WHY: Through MAP-21, Congress required FHWA to establish measures to assess performance in 12 areas, including freight movement on the Interstate. The measure considers factors that are unique to this industry, such as the use of the system during all hours of the day and the need to consider more extreme impacts to the system in planning for on-time arrivals. [23 CFR 490.607] WHEN: State DOTs must establish 2-and 4-year targets by May 20, 2018. Those targets will be reported in the State’s baseline performance period report due by October 1, 2018. The State DOTs have the option to adjust 4-year targets in their mid performance period progress report, due October 1, 2020. MPOs must either support the State target or establish their own quantifiable 4- year targets within 180 days of the State target establishment. HOW: Freight movement will be assessed by the TTTR Index. Reporting is divided into five periods: morning peak (6-10 a.m.), midday (10 a.m.-4 p.m.) and afternoon peak (4-8 p.m.) Mondays through Fridays; weekends (6 a.m.-8 p.m.); and overnights for all days (8 p.m.-6 a.m.). The TTTR ratio will be generated by dividing the 95th percentile time by the normal time (50th percentile) for each segment. The TTTR Index will be generated by multiplying each segment’s largest ratio of the five periods by its length, then dividing the sum of all length-weighted segments by the total length of Interstate. State DOTs and MPOs will have the data they need in FHWA’s National Performance Management Research Data Set (NPMRDS) as data set includes truck travel times for the full Interstate System. State DOTs and MPOs may use an equivalent data set if they prefer. Note: The FHWA is preparing guidance on how all rules should be implemented. Grand Island Regular Session - 11/24/2020 Page 119 / 167 Page 1 of 29 Transportation Performance Management State Biennial Performance Report for Performance Period 2018-2021 2020 MID PERFORMANCE PERIOD (MPP) PROGRESS REPORT Nebraska Report Due: 10/1/2020 Report Status: Submitted Report Updated On: Report Exported on 9/28/2020 This document is exported from the Federal Highway Administration’s (FHWA) web-based Performance Management Form (PMF) of the Policy Information Data Portal (PIDP). The web-based PMF is the State’s official report to FHWA. Grand Island Regular Session - 11/24/2020 Page 120 / 167 Page 2 of 29 State Contact: Name : Korey Donahoo Phone number : 4024794619 Email : korey.donahoo@nebraska.gov Grand Island Regular Session - 11/24/2020 Page 121 / 167 Page 3 of 29 Summary of Performance Measures and Targets Performance Measures Baseline 2-Year Condition/ Performance 2-Year Target 4-Year Target 4-Year Adjustment Percentage of Pavements of the Interstate System in Good Condition 80.3%50.0% Percentage of Pavements of the Interstate System in Poor Condition 0.1%5.0% Percentage of Pavements of the Non- Interstate NHS in Good Condition 63.4%63.0% Percentage of Pavements of the Non- Interstate NHS in Good Condition (Full Distress + IRI) 58.1%40.0%40.0% Percentage of Pavements of the Non- Interstate NHS in Poor Condition 11.5%12.2% Percentage of Pavements of the Non- Interstate NHS in Poor Condition (Full Distress + IRI) 2.1%10.0%10.0% Percentage of NHS Bridges Classified as in Good Condition 61.0%56.5%55.0%55.0% Percentage of NHS Bridges Classified as in Poor Condition 1.9%1.9%10.0%10.0% Percent of the Person-Miles Traveled on the Interstate That Are Reliable 98.9%97.5%98.9%98.9%94.0% Percent of the Person-Miles Traveled on the Non-Interstate NHS That Are Reliable 91.3%92.6%88.0% Truck Travel Time Reliability (TTTR) Index 1.10 1.15 1.10 1.10 1.25 Total Emission Reductions: PM2.5 Total Emission Reductions: NOx Total Emission Reductions: VOC Total Emission Reductions: PM10 Total Emission Reductions: CO Grand Island Regular Session - 11/24/2020 Page 122 / 167 Page 4 of 29 Overview OVERVIEW SECTION 1 Question No Description Field Type O1 Please provide a discussion on the effectiveness of the investment strategies developed and documented in the State asset management plan for the National Highway System (NHS) required under [23 CFR 490.107(b)(2)(ii)(C)]. NDOT’s investment strategies emphasizing pavement preservation have been very effective in not only meeting but exceeding performance measure targets as well as maintaining the NHS system in a state of good repair as seen below. O2 Please use this space to provide any general comments that may assist FHWA in its review of your submission. You can use this space to provide greater context for your targets and current condition/performance, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) OVERVIEW SECTION 2 Question No Description Field Type O3 Who should FHWA contact with questions?Korey Donahoo O4 What is the phone number for this contact? Please provide 10-digit number (area code and phone number) without formatting. (e.g., 1234567890) 4024794619 O5 What is the email address for this contact?korey.donahoo@nebraska.gov Grand Island Regular Session - 11/24/2020 Page 123 / 167 Page 5 of 29 Pavement Pavement Performance Overview Question No Description Field Type P1 Please use this space to provide any general comments that may assist FHWA in its review of this part of the submission. You can use this space to provide greater context for your targets and current condition, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) Statewide Performance Target for the Percentage of Pavements on the Interstate System in Good Condition Question No Description Field Type P2 The 2-year statewide percentage of pavements on the Interstate System in Good condition. This value is the actual 2-year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] For the 2018-2021 Performance Period, this 2-year condition value will be used as the baseline value for this measure per the phase-in of new requirements for this measure. [23 CFR 490.105(e)(7)(iii)] 80.3 P3 The 4-year target for the statewide percentage of pavements on the Interstate System in Good condition for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 50.0 P4 Does the State DOT wish to adjust the 4-year target for the statewide percentage of pavements on the Interstate System in Good condition? [23 CFR 490.105(e)(6)] No P4a Please provide the adjusted 4-year target for the statewide percentage of pavements on the Interstate System in Good condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] The adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5. [23 CFR 490.101 (Target definition) and 23 CFR 490.313(f)(2)] P4b Please provide the basis for adjustment of the 4-year target for the statewide percentage of pavements on the Interstate System in Good condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] Statewide Performance Target for the Percentage of Pavements on the Interstate System in Poor Condition Grand Island Regular Session - 11/24/2020 Page 124 / 167 Page 6 of 29 Question No Description Field Type P5 The 2-year statewide percentage of pavements on the Interstate System in Poor condition. This value is the actual 2-year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] For the 2018-2021 Performance Period, this 2-year condition value will be used as the baseline value for this measure per the phase-in of new requirements for this measure. [23 CFR 490.105(e)(7)(iii)] 0.1 P6 The 4-year target for the statewide percentage of pavements on the Interstate System in Poor condition for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 5.0 P7 Does the State DOT wish to adjust the 4-year target for the statewide percentage of pavements on the Interstate System in Poor condition? [23 CFR 490.105(e)(6)] No P7a Please provide the adjusted 4-year target for the statewide percentage of pavements on the Interstate System in Poor condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.313(f)(3)] P7b Please provide the basis for adjustment of the 4-year target for the statewide percentage of pavements on the Interstate System in Poor condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] Statewide Performance Target for the Percentage of Pavements on the Non-Interstate NHS in Good Condition. Question No Description Field Type P8 The baseline statewide percentage of pavements on the Non-Interstate NHS in Good condition. This value is from the 2018 Baseline Performance Period Report, and is the condition derived from the latest data collected through the beginning date of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] For the first performance period, FHWA calculated this value using IRI only (or PSR values for road sections where speed is less than 40 mph). [23 CFR 490.313(e)] 63.4 P9 The 2-year statewide percentage of pavements on the Non- Interstate NHS in Good condition. This value is the actual 2- year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] 63.0 Grand Island Regular Session - 11/24/2020 Page 125 / 167 Page 7 of 29 For the first performance period, FHWA calculated this value using IRI only (or PSR values for road sections where speed is less than 40 mph). [23 CFR 490.313(e)] P10 If the State DOT reported its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition based on “Full Distress + IRI” data in the 2018 Baseline Performance Period Report, FHWA has calculated an actual condition level using “Full Distress + IRI” data. [23 CFR 490.313 (c) and (d)] When a State DOT reported the 2-year target based on “Full Distress + IRI” data, FHWA will use this value to determine whether the actual condition level is equal to or better than the established 2-year target as part of the 2-year significant progress determination. [23 CFR 490.109(e)(2)(ii)] 58.1 P11 The 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 40.0 P12 Please provide a discussion of the progress made toward achieving the 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year condition with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B) For State DOTs that established a 2-year target using IRI only, the baseline value (P17), actual condition calculated with IRI only (P18), and the 2-year target (P20) all use the same metrics and can be compared to each other. State DOTs that established a 2-year target using “Full Distress + IRI” will see an actual condition value in both P18 and P19. These values must be used correctly in order to provide a meaningful discussion of progress. [23 CFR 490.107(b)(2)(ii)(B)] -The actual condition calculated with IRI only (P18) is ONLY comparable to the baseline value calculated with IRI only (P17). -The actual condition calculated with “Full Distress + IRI” (P19) is ONLY comparable to the State DOT’s 2-year target established based on “Full distress + IRI” (P20). NDOT’s 2-year target using full distress + IRI was achieved and exceeded. The initial target was set based on historical condition data and projected funding. The target was initially set somewhat conservatively due to limited data. Due to a change in how cracking is measured (previously a cracking index vs. wheel path cracking) historical cracking data is limited to two years. As additional data is obtained to establish a reliable trend, the target will be re- evaluated. In addition, NDOT is currently experiencing unusual financial instability due to impacts of historic flooding in 2019, reduced revenues resulting from the Covid 19 Epidemic, and significant construction inflation pricing. Projected funding levels are expected to result in a decrease in system performance. Given limited data and financial uncertainty, NDOT chose to keep the same target. P13 The 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 40.0 P14 Does the State DOT wish to adjust the 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition? [23 CFR 490.105(e)(6)] No Grand Island Regular Session - 11/24/2020 Page 126 / 167 Page 8 of 29 P14a Please provide the adjusted 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5. [23 CFR 490.101 (Target definition) and 23 CFR 490.313(f)(4)] P14b Please provide the basis for adjustment of the 4-year target for the statewide percentage of pavements on the Non- Interstate NHS in Good condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] P15 Please provide a summary of prior accomplishments and planned activities that will be conducted during the remainder of the performance period to make significant progress toward achievement of the 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition. [23 CFR 490.107(b)(2)(ii)(F)] NDOT’s 2-year target using full distress + IRI was achieved and exceeded. NDOT will continue to employ the investment strategies emphasizing pavement preservation in accordance with the approved Transportation Asset Management Plan to meet performance targets, maintain the system in a state of good repair, and make the most of scarce taxpayer dollars. P16 Are there any extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition? [23 CFR 490.107(b)(2)(ii)(G)] No P16a Please select the extenuating circumstance(s) that apply. [23 CFR 490.109(e)(5)] P16b Please explain the extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Good condition and quantify the impacts that resulted from these circumstances. [23 CFR 490.107(b)(2)(ii)(G)] Statewide Performance Target for the Percentage of Pavements on the Non-Interstate NHS in Poor Condition. Question No Description Field Type P17 The baseline statewide percentage of pavements on the Non-Interstate NHS in Poor condition. This value is from the 2018 Baseline Performance Period Report, and is the condition derived from the latest data collected through the beginning date of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] For the first performance period, FHWA calculated this value 11.5 Grand Island Regular Session - 11/24/2020 Page 127 / 167 Page 9 of 29 using IRI only (or PSR values for road sections where speed is less than 40 mph). [23 CFR 490.313(e)] P18 The 2-year statewide percentage of pavements on the Non- Interstate NHS in Poor condition. This value is the actual 2- year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] For the first performance period, FHWA calculated this value using IRI only (or PSR values for road sections where speed is less than 40 mph). [23 CFR 490.313(e)] 12.2 P19 If the State DOT reported its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition based on “Full Distress + IRI” data in the 2018 Baseline Performance Period Report, FHWA has calculated an actual condition level using “Full Distress + IRI” data. [23 CFR 490.313 (c) and (d)] When a State DOT reported the 2-year target based on “Full Distress + IRI” data, FHWA will use this value to determine whether the actual condition level is equal to or better than the established 2-year target as part of the 2-year significant progress determination. [23 CFR 490.109(e)(2)(ii)] 2.1 P20 The 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 10.0 P21 Please provide a discussion of the progress made toward achieving the 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year condition with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] For State DOTs that established a 2-year target using IRI only, the baseline value (P17), actual condition calculated with IRI only (P18), and the 2-year target (P20) all use the same metrics and can be compared to each other. State DOTs that established a 2-year target using “Full Distress + IRI” will see an actual condition value in both P18 and P19. These values must be used correctly in order to provide a meaningful discussion of progress. [23 CFR 490.107(b)(2)(ii)(B)] -The actual condition calculated with IRI only (P18) is ONLY comparable to the baseline value calculated with IRI only (P17). -The actual condition calculated with “Full Distress + IRI” (P19) is ONLY comparable to the State DOT’s 2-year target established based on “Full distress + IRI” (P20). NDOT’s 2-year target using full distress + IRI was achieved. The initial target was set based on historical condition data and projected funding. The target was initially set somewhat conservatively due to limited data. Due to a change in how cracking is measured (previously a cracking index vs. wheel path cracking) historical cracking data is limited to two years. As additional data is obtained to establish a reliable trend, the target will be re- evaluated. In addition, NDOT is currently experiencing unusual financial instability due to impacts of historic flooding in 2019, reduced revenues resulting from the Covid 19 Epidemic, and significant construction inflation pricing. Projected funding levels are expected to result in a decrease in system performance. Given limited data and financial uncertainty, NDOT chose to keep the same target. P22 The 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 10.0 Grand Island Regular Session - 11/24/2020 Page 128 / 167 Page 10 of 29 P23 Does the State DOT wish to adjust the 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition? [23 CFR 490.105(e)(6)] No P23a Please provide the adjusted 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.313(f)(5)] P23b Please provide the basis for adjustment of the 4-year target for the statewide percentage of pavements on the Non- Interstate NHS in Poor condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] P24 Please provide a summary of prior accomplishments and planned activities that will be conducted during the remainder of the performance period to make significant progress toward achievement of the 4-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition. [23 CFR 490.107(b)(2)(ii)(F)] NDOT’s 2-year target using full distress + IRI was achieved. NDOT will continue to employ the investment strategies emphasizing pavement preservation in accordance with the approved Transportation Asset Management Plan to meet performance targets, maintain the system in a state of good repair, and make the most of scarce taxpayer dollars. P25 Are there any extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition for the 2018-2021 Performance Period? [23 CFR 490.107(b)(2)(ii)(G)] No P25a Please select the extenuating circumstance(s) that apply. [23 CFR 490.109(e)(5)] P25b Please explain the extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of pavements on the Non-Interstate NHS in Poor condition and quantify the impacts that resulted from these circumstances. [23 CFR 490.107(b)(2)(ii)(G)] Grand Island Regular Session - 11/24/2020 Page 129 / 167 Page 11 of 29 Bridge Bridge Performance Overview Question No Description Field Type B1 Please use this space to provide any general comments that may assist FHWA in its review of this part of the submission. You can use this space to provide greater context for your targets and current condition, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) Targets for bridge conditions have been met. No change to performance targets is proposed for the next review period. Statewide Performance Target for Bridges on the NHS Classified as in Good Condition Question No Description Field Type B2 The baseline statewide percentage of deck area of bridges on the NHS classified as in Good condition. This value is from the 2018 Baseline Performance Period Report, and is the condition derived from the latest data collected through the beginning date of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] 61.0 B3 The 2-year statewide percentage of deck area of bridges on the NHS classified as in Good condition. This value is the actual 2-year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] 56.5 B4 The 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 55.0 B5 Please provide a discussion of the progress made toward achieving the 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year condition achieved (based on data contained within the National Bridge Inventory as of June 15, 2020, and made available by FHWA) with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] Combined State and Local system NHS bridges are currently at 57.0% Good condition. It is anticipated that some large bridges could impact this measure if deck transitions from 7 to 6 in the next inspection cycle. B6 The 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 55.0 B7 Does the State DOT wish to adjust the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition? [23 CFR 490.105(e)(6)] No Grand Island Regular Session - 11/24/2020 Page 130 / 167 Page 12 of 29 B7a Please provide the adjusted 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.409(c)(1)] B7b Please provide the basis for adjustment of the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] B8 Please provide a summary of prior accomplishments and planned activities that will be conducted during the remainder of the performance period to make significant progress toward achievement of the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition. [23 CFR 490.107(b)(2)(ii)(F)] The scheduled bridge construction program has been delivered as anticipated with an emphasis on strategies that slow deterioration and minimize future costs. B9 Are there any extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition for the 2018-2021 Performance Period? [23 CFR 490.107(b)(2)(ii)(G)] No B9a Please select the extenuating circumstance(s) that apply. [23 CFR 490.109(e)(5)] B9b Please explain the extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Good condition and quantify the impacts that resulted from these circumstances. [23 CFR 490.107(b)(2)(ii)(G)] Statewide Performance Target for Bridges on the NHS Classified as in Poor Condition Question No Description Field Type B10 The baseline statewide percentage of deck area of bridges on the NHS classified as in Poor condition. This value is from the 2018 Baseline Performance Period Report, and is the condition derived from the latest data collected through the beginning date of the performance 1.9 Grand Island Regular Session - 11/24/2020 Page 131 / 167 Page 13 of 29 period. [23 CFR 490.107(b)(1)(ii)(B)] B11 The 2-year statewide percentage of deck area of bridges on the NHS classified as in Poor condition. This value is the actual 2-year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] 1.9 B12 The 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 10.0 B13 Please provide a discussion of the progress made toward achieving the 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year condition achieved (based on data contained within the National Bridge Inventory as of June 15, 2020, and made available by FHWA) with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] Performance Targets for percent Poor on the NHS have been met. B14 The 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 10.0 B15 Does the State DOT wish to adjust the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition? [23 CFR 490.105(e)(6)] No B15a Please provide the adjusted 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.409(c)(2)] B15b Please provide the basis for adjustment of the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] B16 Please provide a summary of prior accomplishments and planned activities that will be conducted during the remainder The scheduled bridge construction program has been delivered as Grand Island Regular Session - 11/24/2020 Page 132 / 167 Page 14 of 29 of the performance period to make significant progress toward achievement of the 4-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition. [23 CFR 490.107(b)(2)(ii)(F)] anticipated with an emphasis on strategies that slow deterioration and minimize future costs. B17 Are there any extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition for the 2018-2021 Performance Period? [23 CFR 490.107(b)(2)(ii)(G)] No B17a Please select the extenuating circumstance(s) that apply. [23 CFR 490.109(e)(5)] B17b Please explain the extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percentage of deck area of bridges on the NHS classified as in Poor condition and quantify the impacts that resulted from these circumstances. [23 CFR 490.107(b)(2)(ii)(G)] Grand Island Regular Session - 11/24/2020 Page 133 / 167 Page 15 of 29 Reliability Travel Time Reliability Performance Overview Question No Description Field Type R1 Please use this space to provide any general comments that may assist FHWA in its review of this part of the submission. You can use this space to provide greater context for your targets and current performance, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) Statewide Performance Target for the Percent of the Person-Miles Traveled on the Interstate That Are Reliable Question No Description Field Type R2 The baseline statewide percent of the person-miles traveled on the Interstate that are reliable. This value is from the 2018 Baseline Performance Period Report, and is the condition derived from the latest data collected through the beginning date of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] 98.9 R3 The 2-year statewide percent of the person-miles traveled on the Interstate that are reliable. This value is the actual 2-year condition derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] 97.5 R4 The 2-year target for the statewide percent of the person- miles traveled on the Interstate that are reliable for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 98.9 R5 Please provide a discussion of the progress made toward achieving the 2-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] Nebraska’s 2-year performance was 97.5 compared to a target of 98.9. The target of 98.9 was based on performance in 2017 alone, as a trendline had not yet been established when the target was set. The 2 year performance of 97.5 shows strong reliability while not achieving the target. The nominal difference can be explained by traffic congestion variability, variable weather impacts, etc. Nebraska has managed to maintain its strong reliability rate through existing high levels of performance and scheduled roadway improvements. R6 The 4-year target for the statewide percent of the person- miles traveled on the Interstate that are reliable for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 98.9 Grand Island Regular Session - 11/24/2020 Page 134 / 167 Page 16 of 29 R7 Does the State DOT wish to adjust the 4-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable? [23 CFR 490.105(e)(6)] Yes R7a Please provide the adjusted 4-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable. The adjusted target should reflect expected condition by the end of Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.513(b)] 94.0 R7b Please provide the basis for adjustment of the 4-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] Nebraska’s adjustment to 94.0 is based on trend analysis of performance in 2017-2019. The 2017 performance was 98.9 and was utilized to set the baseline since NDOT had no previous reliability data from which to draw a trend. The 2018 performance was also 98.9 before dropping to 97.4 in 2019. This drop suggests a slight negative trend in performance, though existing high levels of performance and planned improvements as part of NDOT’s ongoing project selection process will enable NDOT to maintain strong performance levels. A projection of 94.0 is consistent with this trendline while still setting a goal of strong reliability. R8 Please provide a summary of prior accomplishments and planned activities that will be conducted during the remainder of the performance period to make significant progress toward achievement of the 4-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable. [23 CFR 490.107(b)(2)(ii)(F)] NDOT continues to include reliability performance in its design and project selection processes and is exploring options for investing in intermodal sites, which could result in reduced freight congestion. R9 Are there any extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide percent of the person-miles traveled on the Interstate that are reliable for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(G)] No R9a Please select the extenuating circumstance(s) that apply. [23 CFR 490.109(e)(5)] R9b Please explain the extenuating circumstance(s) beyond the State DOT’s control that prevented it from making significant progress toward achieving its 2-year target for the statewide Grand Island Regular Session - 11/24/2020 Page 135 / 167 Page 17 of 29 percent of the person-miles traveled on the Interstate that are reliable and quantify the impacts that resulted from these circumstances. [23 CFR 490.107(b)(2)(ii)(G)] Statewide Performance Target for the Percent of the Person-Miles Traveled on the Non-Interstate NHS That Are Reliable Question No Description Field Type R10 The 2-year statewide percent of the person-miles traveled on the non-Interstate NHS that are reliable. This value is the actual 2-year performance derived from the latest data collected through the midpoint of the performance period. [23 CFR 490.107(b)(2)(ii)(A)] For the 2018-2021 Performance Period, this 2-year performance value will be used as the baseline value for this measure per the phase-in of new requirements for this measure. [23 CFR 490.105(e)(7)(iii)] 91.3 R11 The 4-year target for the statewide percent of the person- miles traveled on the non-Interstate NHS that are reliable for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A)] 92.6 R12 Does the State DOT wish to adjust the 4-year target for the statewide percent of the person-miles traveled on the non- Interstate NHS that are reliable? [23 CFR 490.105(e)(6)] Yes R12a Please provide the adjusted 4-year target for the statewide percent of the person-miles traveled on the non-Interstate NHS that are reliable. The adjusted target should reflect expected performance by the end of the Calendar Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to the nearest tenth of a percent. For example, enter 86.5% as 86.5 [23 CFR 490.101 (Target definition) and 23 CFR 490.513(c)] 88.0 R12b Please provide the basis for adjustment of the 4-year target for the statewide percent of the person-miles traveled on the non-Interstate NHS that are reliable and describe how the adjusted target supports expectations documented in longer range plans, such as the State asset management plan and the long-range statewide transportation plan. [23 CFR 490.107(b)(2)(ii)(E)] Nebraska’s adjustment to 88.0 is based on trend analysis of performance in 2017-2019. The 2017 performance was 92.6, 2018 was 92.2, and 2019 was 91.3. This trend suggests a slight decline in performance, though existing high levels of performance and planned improvements as part of asset management and capital improvement projects will enable NDOT to maintain strong performance levels. A projection of 88.0 is consistent with this trendline while still setting a goal of strong reliability. Grand Island Regular Session - 11/24/2020 Page 136 / 167 Page 18 of 29 Grand Island Regular Session - 11/24/2020 Page 137 / 167 Page 19 of 29 Freight Freight Reliability (Movement) Performance Overview Question No Description Field Type F1 Please use this space to provide any general comments that may assist FHWA in its review of this part of the submission. You can use this space to provide greater context for your targets and current performance, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) F2 Please discuss progress of the State DOT’s efforts in addressing congestion at truck freight bottlenecks within the State (described in § 490.107(b)(1)(ii)(E)) through comprehensive freight improvement efforts of State Freight Plan or MPO freight plans; the Statewide Transportation Improvement Program and Transportation Improvement Program; regional or corridor level efforts; other related planning efforts; and operational and capital activities targeted to improve freight movement on the Interstate System. If the State has prepared a State Freight Plan under 49 U.S.C. 70202, within the previous 2 years, then it may serve as the basis for addressing congestion at truck freight bottlenecks. If the State Freight Plan has not been updated since the previous State Biennial Performance Report, then an updated analysis of congestion at truck freight bottlenecks must be completed. [23 CFR 490.107(b)(2)(ii)(D)] Please upload related document(s) in the “Attachment” tab. In 2017, the NDOT finalized its first state freight plan. At that time, certain aspects of the freight plan highlighted the opportunity to mitigate freight bottlenecks and limit truck congestion on the state highway system. In addition, the mitigation of bottlenecks was identified by freight stakeholders as a priority for NDOT and its freight project evaluation criteria. Subsequently, the NDOT identified and reported a variety of bottlenecks to the FHWA reporting portal in 2018, based on 1 years’ worth of data. Subsequently, the NDOT utilized the data from 2017 to identify a variety of bottlenecks which were provided via attachment to the FHWA reporting portal in 2018. Beyond this, bottlenecks were one of many “needs and opportunities” identified and prioritized through the planning process. Other opportunities included, “Support Freight Related Development”, “Prepare for Future Growth”, and “Preserve the Highway Condition”, to name a few. Based on these things, the State Freight Plan’s associated Freight Investment Plan was developed to address these high priority opportunities. This investment plan includes projects along I-80, which is a prominent freight corridor in Nebraska and is listed as part of the National Freight Network. . These projects are large reconstruction projects that maintain the existing asset and ensure continued freight flows across the country. Since the reach of the freight investment plan was limited to I-80, Grand Island Regular Session - 11/24/2020 Page 138 / 167 Page 20 of 29 the NDOT routinely assesses whether bottlenecks exist by reviewing travel times and truck travel reliability performance data. These reviews include a high-level review of the State (as a whole) and its MPOs. For example, the state’s largest MPO, which encompasses the Omaha metropolitan area, had a TTTR of 1.37 in 2019. As a state, TTTR was 1.15 in 2019. In either case, the TTTR performance was still well below 1.5, which is considered to be the national threshold for reliable truck travel. With this in mind, the NDOT has revised its definition of a bottleneck to reflect the national threshold. This change is based on a comparison of Nebraska’s reliability to performance in other states. As a result, this has caused the NDOT to conclude there are no bottlenecks in the state. Despite this, the NDOT will continue to monitor performance data for bottlenecks. In addition, this definition of bottlenecks will be revisited with stakeholders as part of the 2022 update of the Nebraska State Freight Plan and full Biennial Performance Report. Grand Island Regular Session - 11/24/2020 Page 139 / 167 Page 21 of 29 Peak Hour Excess Delay (PHED) Annual Hours of Peak Hour Excessive Delay (PHED) Per Capita Performance Overview Question No Description Field Type D1 Please use this space to provide any general comments that may assist FHWA in its review of this part of the submission. You can use this space to provide greater context for your targets and current performance, provide additional background detail or clarification, note any assumptions, or discuss complications. This text may be shared verbatim online. (Optional) D2 The total number of applicable UZA(s) required to establish targets and report progress for the Traffic Congestion Measures in your State are: Grand Island Regular Session - 11/24/2020 Page 140 / 167 Page 22 of 29 Question No Description Field Type E11 The baseline emissions reductions (total daily kilograms) of PM2.5. This value is from the 2018 Baseline Performance Period Report and is the performance derived from the latest data collected through the cumulative statewide estimated emissions reductions (total daily kilograms) for the previous 4 Federal Fiscal Years before the start of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] This value is carried over from the 2018 Baseline Performance Period Report. E12 Please provide the current estimated emissions reductions (total daily kilograms) of PM2.5. [23 CFR 490.107(b)(2)(ii)(A) and 23 CFR 490.107(c)(3)(iii)(B)] The current data for the performance period must include the cumulative reductions in emissions (total daily kilograms) over the Federal Fiscal Years 2018 and 2019. The data needed to calculate the measure shall come from the CMAQ Public Access System. [23 CFR 490.809(a) and 23 CFR 490(b)(2). The data must be reported to the nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] FHWA provided the prepopulated data from the CMAQ Public Access System. If the DOT feels that a different value is appropriate due to an error, please contact the FHWA Division Office in your State. E13 The 2-year target for cumulative emissions reduction (total daily kilograms) of PM2.5 for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E14 Please provide a discussion of the progress made toward achieving the 2-year target for cumulative emissions reduction (total daily kilograms) of PM2.5. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] E15 The 4-year target for cumulative emissions reduction (total daily kilograms) of PM2.5 established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E16 Does the State DOT wish to adjust the 4-year target for cumulative emissions reduction (total daily kilograms) of PM2.5? [23 CFR 490.105(e)(6)] Grand Island Regular Session - 11/24/2020 Page 141 / 167 Page 23 of 29 E16a Please provide the adjusted 4-year target for cumulative emissions reduction (total daily kilograms) of PM2.5. The adjusted target should reflect expected performance by the end of Federal Fiscal Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] E16b Please provide the basis for adjustments of the 4-year target for cumulative emissions reduction (total daily kilograms) of PM2.5 established for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(E) and 23 CFR 490.107(c)(3)(ii)(B)] Statewide Total Emission Reductions NOx Target #2 Question No Description Field Type E17 The baseline emissions reductions (total daily kilograms) of NOx. This value is from the 2018 Baseline Performance Period Report and is the performance derived from the latest data collected through the cumulative statewide estimated emissions reductions (total daily kilograms) for the previous 4 Federal Fiscal Years before the start of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] E18 Please provide the current estimated emissions reductions (total daily kilograms) of NOx. [23 CFR 490.107(b)(2)(ii)(A) and 23 CFR 490.107(c)(3)(iii)(B)] The current data for the performance period must include the cumulative reductions in emissions (total daily kilograms) over the Federal Fiscal Years 2018 and 2019. The data needed to calculate the measure shall come from the CMAQ Public Access System. [23 CFR 490.809(a) and 23 CFR 490(b)(2). The data must be reported to the nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] FHWA provided the prepopulated data from the CMAQ Public Access System. If the DOT feels that a different value is appropriate due to an error, please contact the FHWA Division Office in your State. E19 The 2-year target for cumulative emissions reduction (total daily kilograms) of NOx for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E20 Please provide a discussion of the progress made toward achieving the 2-year target for cumulative emissions reduction (total daily kilograms) of NOx. At a minimum, this discussion should address overall progress as of the Grand Island Regular Session - 11/24/2020 Page 142 / 167 Page 24 of 29 midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2- year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] E21 The 4-year target for cumulative emissions reduction (total daily kilograms) of NOx established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E22 Does the State DOT wish to adjust the 4-year target for cumulative emissions reduction (total daily kilograms) of NOx? [23 CFR 490.105(e)(6)] E22a Please provide the adjusted 4-year target for cumulative emissions reduction (total daily kilograms) of NOx. The adjusted target should reflect expected performance by the end of Federal Fiscal Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] E22b Please provide the basis for adjustments of the 4-year target for cumulative emissions reduction (total daily kilograms) of NOx established for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(E) and 23 CFR 490.107(c)(3)(ii)(B)]. Statewide Total Emission Reductions VOC Target #3 Question No Description Field Type E23 The baseline emissions reductions (total daily kilograms) of VOC. This value is from the 2018 Baseline Performance Period Report and is the performance derived from the latest data collected through the cumulative statewide estimated emissions reductions (total daily kilograms) for the previous 4 Federal Fiscal Years before the start of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] E24 Please provide the current estimated emissions reductions (total daily kilograms) of VOC. [23 CFR 490.107(b)(2)(ii)(A) and 23 CFR 490.107(c)(3)(iii)(B)] The current data for the performance period must include the cumulative reductions in emissions (total daily kilograms) over the Federal Fiscal Years 2018 and 2019. The data needed to calculate the measure shall come from the CMAQ Public Access System. [23 CFR 490.809(a) and 23 CFR 490(b)(2). The data must be reported to the nearest one Grand Island Regular Session - 11/24/2020 Page 143 / 167 Page 25 of 29 thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] FHWA provided the prepopulated data from the CMAQ Public Access System. If the DOT feels that a different value is appropriate due to an error, please contact the FHWA Division Office in your State. E25 The 2-year target for cumulative emissions reduction (total daily kilograms) of VOC for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E26 Please provide a discussion of the progress made toward achieving the 2-year target for cumulative emissions reduction (total daily kilograms) of VOC. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] E27 The 4-year target for cumulative emissions reduction (total daily kilograms) of VOC established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E28 Does the State DOT wish to adjust the 4-year target for cumulative emissions reduction (total daily kilograms) of VOC? [23 CFR 490.105(e)(6)] E28a Please provide the adjusted 4-year target for cumulative emissions reduction (total daily kilograms) of VOC. The adjusted target should reflect expected performance by the end of Federal Fiscal Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] E28b Please provide the basis for adjustments of the 4-year target for cumulative emissions reduction (total daily kilograms) of VOC established for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(E) and [23 CFR 490.107(c)(3)(ii)(B)]. Statewide Total Emission Reductions PM10 Target #4 Question No Description Field Type E29 The baseline emissions reductions (total daily kilograms) of PM10. Grand Island Regular Session - 11/24/2020 Page 144 / 167 Page 26 of 29 This value is from the 2018 Baseline Performance Period Report and is the performance derived from the latest data collected through the cumulative statewide estimated emissions reductions (total daily kilograms) for the previous 4 Federal Fiscal Years before the start of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] E30 Please provide the current estimated emissions reductions (total daily kilograms) of PM10. [23 CFR 490.107(b)(2)(ii)(A) and 23 CFR 490.107(c)(3)(iii)(B)] The current data for the performance period must include the cumulative reductions in emissions (total daily kilograms) over the Federal Fiscal Years 2018 and 2019. The data needed to calculate the measure shall come from the CMAQ Public Access System. [23 CFR 490.809(a) and 23 CFR 490(b)(2). The data must be reported to the nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] FHWA provided the prepopulated data from the CMAQ Public Access System. If the DOT feels that a different value is appropriate due to an error, please contact the FHWA Division Office in your State. E31 The 2-year target for cumulative emissions reduction (total daily kilograms) of PM10 for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E32 Please provide a discussion of the progress made toward achieving the 2-year target for cumulative emissions reduction (total daily kilograms) of PM10. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] E33 The 4-year target for cumulative emissions reduction (total daily kilograms) of PM10 established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E34 Does the State DOT wish to adjust the 4-year target for cumulative emissions reduction (total daily kilograms) of PM10?[23 CFR 490.105(e)(6)] E34a Please provide the adjusted 4-year target for cumulative emissions reduction (total daily kilograms) of PM10. The adjusted target should reflect expected performance by the end of Federal Fiscal Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] Grand Island Regular Session - 11/24/2020 Page 145 / 167 Page 27 of 29 This adjusted target must be reported to nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] E34b Please provide the basis for adjustments of the 4-year target for cumulative emissions reduction (total daily kilograms) of PM10 established for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(E) and 23 CFR 490.107(c)(3)(ii)(B)]. Statewide Total Emission Reductions CO Target #5 Question No Description Field Type E35 The baseline emissions reductions (total daily kilograms) of CO. This value is from the 2018 Baseline Performance Period Report and is the performance derived from the latest data collected through the cumulative statewide estimated emissions reductions (total daily kilograms) for the previous 4 Federal Fiscal Years before the start of the performance period. [23 CFR 490.107(b)(1)(ii)(B)] E36 Please provide the current estimated emissions reductions (total daily kilograms) of CO. [23 CFR 490.107(b)(2)(ii)(A) and 23 CFR 490.107(c)(3)(iii)(B)] The current data for the performance period must include the cumulative reductions in emissions (total daily kilograms) over the Federal Fiscal Years 2018 and 2019. The data needed to calculate the measure shall come from the CMAQ Public Access System. [23 CFR 490.809(a) and 23 CFR 490(b)(2). The data must be reported to the nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] FHWA provided the prepopulated data from the CMAQ Public Access System. If the DOT feels that a different value is appropriate due to an error, please contact the FHWA Division Office in your State. E37 The 2-year target for cumulative emissions reduction (total daily kilograms) of CO for the 2018-2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E38 Please provide a discussion of the progress made toward achieving the 2-year target for cumulative emissions reduction (total daily kilograms) of CO. At a minimum, this discussion should address overall progress as of the midpoint of the performance period, and shall include a comparison of the actual 2-year performance with the 2-year target and any reasons for differences in the actual and target values. [23 CFR 490.107(b)(2)(ii)(B)] Grand Island Regular Session - 11/24/2020 Page 146 / 167 Page 28 of 29 (total daily kilograms) of CO established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E39 The 4-year target for cumulative emissions reduction (total daily kilograms) of CO established for the 2018- 2021 Performance Period that was reported in the 2018 Baseline Performance Period Report. [23 CFR 490.107(b)(1)(ii)(A) and 23 CFR 490.107(c)(3)(ii)(B)] E40 Does the State DOT wish to adjust the 4-year target for cumulative emissions reduction (total daily kilograms) of CO? [23 CFR 490.105(e)(6)] E40a Please provide the adjusted 4-year target for cumulative emissions reduction (total daily kilograms) of CO. The adjusted target should reflect expected performance by the end of Federal Fiscal Year 2021. This adjustment is only permitted in the MPP Progress Report. [23 CFR 490.105(e)(6) and 23 CFR 490.107(b)(2)(ii)(E)] This adjusted target must be reported to nearest one thousandths. For example, enter 86.512. [23 CFR 490.101 (Target definition) and 23 CFR 490.811(b)] E40b Please provide the basis for adjustments of the 4-year target for cumulative emissions reduction (total daily kilograms) of CO established for the 2018-2021 Performance Period. [23 CFR 490.107(b)(2)(ii)(E) and 23 CFR 490.107(c)(3)(ii)(B)]. Grand Island Regular Session - 11/24/2020 Page 147 / 167 Page 29 of 29 Attachments S.No Section Attachment Detail Filename: Notes: Attachment Url: There are no attachments. Grand Island Regular Session - 11/24/2020 Page 148 / 167 GIAMPO RESOLUTION NO. 2020-8 Grand Island Area Metropolitan Planning Organization A Resolution Approving the MPO Targets for NHS Travel Time Reliability and Freight Reliability Performance Measures WHEREAS, the Grand Island Area Metropolitan Planning Organization (GIAMPO), is designated as the Metropolitan Planning Organization (MPO) for the Grand Island Urbanized Area, by the Governor acting through the Nebraska Department of Transportation in cooperation with locally elected officials of the Grand Island Urbanized Area; and WHEREAS, the Moving Ahead for Progress in the 21st Century Act (MAP-21) required the U.S. Secretary of Transportation to develop rules to establish a system to monitor and manage public transportation assets, to improve safety and increase reliability and performance, and to establish performance measures, and the Fixing America’s Surface Transportation (FAST) Act reaffirmed this requirement; and WHEREAS, the System Performance/Freight Reliability/Congestion Mitigation and Air Quality (CMAQ) Final 23 CFR Part 490 became effective May 20, 2017 and establishes targets for the following six performance measures: Performance Measures System Performance (NHS Travel Time Reliability) • Percent of Person-Miles on the Interstate System that are Reliable • Percent of Person-Miles on the Non-Interstate NHS that are Reliable Freight Reliability • Measurement of Travel Time Reliability on the Interstate System Using a Truck Travel Time Reliability (TTTR) Index CMAQ • Annual Hour of Peak Hour Excessive Delay* • Percent of Non-Single-Occupant Vehicle Travel* • Total Emissions Reduction* * Nebraska exempt from CMAQ measures this performance period WHEREAS, the Nebraska Department of Transportation is to adopt the system performance and freight reliability performance measures by May 20, 2018; and WHEREAS, the MPO Policy Board may establish system performance and freight reliability targets by agreeing to plan and program projects that contribute toward the accomplishment of the State’s targets, or establish its own targets within 180 days of the State establishing and reporting its system performance and freight reliability targets; and Grand Island Regular Session - 11/24/2020 Page 149 / 167 WHEREAS, the GIAMPO will adopt to support the 4-year performance period (CY 2018-2021) targets for the Nebraska Department of Transportation; and WHEREAS, the MPO targets for system performance and freight reliability performance measures has been reviewed and recommended for adoption by the MPO Technical Advisory Committee (TAC), and now require official approval from the MPO Policy Board; and NOW, THEREFORE BE IT RESOLVED, that the Policy Board of the Grand Island Area Metropolitan Planning Organization has agreed to support the Nebraska Department of Transportation 4-year performance period (CY 2018-2021) targets for system performance and freight reliability performance measures as identified in Exhibit A. BE IT FURTHER RESOLVED, that the Chairperson is hereby authorized and directed to execute such agreement on behalf of the Grand Island Area Metropolitan Planning Organization. Certification: The foregoing resolution was approved by the Grand Island Area Metropolitan Planning Organization Policy Board at its regularly scheduled meeting on November 24, 2020. By: Attest: ______________________________ ______________________________ Roger G. Steele, Mayor / Chairperson John Collins, Public Works Director Grand Island Regular Session - 11/24/2020 Page 150 / 167 Exhibit A Nebraska 4-Year Performance Period (CY 2018-2021) Targets for System Performance and Freight Reliability Performance Measures Performance Measure Target Percent of Person-Miles Traveled on the Interstate That Are Reliable 94.0% Percent of Person-Miles Traveled on the Non-Interstate NHS That Are Reliable 88.0% Freight Reliability 1.25 Source: Nebraska Department of Transportation; Mid Performance Period Progress Report, October 1, 2020. Grand Island Regular Session - 11/24/2020 Page 151 / 167 GIAMPO – Policy Board Tuesday, November 24, 2020 Regular Session Item E5 Long Range Transportation Plan Project Priorities Staff Contact: Andres Gomez, MPO Program Manager Grand Island Regular Session - 11/24/2020 Page 152 / 167 LRTP Update GIAMPO Policy Board November 24, 2020 Grand Island Regular Session - 11/24/2020 Page 153 / 167 Agenda •Public Priorities Exercise Results •Working Draft of Plan Projects •Next Steps Grand Island Regular Session - 11/24/2020 Page 154 / 167 Online Project Prioritization Exercise Exercise Objective Get feedback from public on their top roadway, bicycle & pedestrian, and transit projects. Provide public education on transportation funding. Exercise Dates September 14 –30, 2020 Exercise Responses 669 Grand Island Regular Session - 11/24/2020 Page 155 / 167 Public Roadway Ranking Broadwell & UPRR Grade Separation Broadwell Avenue Widening & Extension Claude Road Extension East Bypass Stuhr Road / Sky Park Road Corridor & Grade Separation Stuhr Road Widening US-281 Intersection Improvements West US-30 Bypass 1.US-281 Intersection Improvements 2.Tied: * Broadwell & UPRR Grade Separation * Broadwell Avenue Widening & Extension 3.Stuhr Road Widening 4.Claude Road Extension 5.West US-30 Bypass 6.Stuhr Road / Sky Park Road Corridor & Grade Separation 7.East Bypass Grand Island Regular Session - 11/24/2020 Page 156 / 167 Public Bike and Pedestrian Ranking Downtown Curb Extensions Mormon Island Trail North Broadwell Avenue Trail Oak Street Bicycle Boulevard Riverway Trail Extension Shoemaker and Moore Creek Trails Stolley Park Trail Stuhr Road Trail US-281 South Trail 1.North Broadwell Avenue Trail 2.Shoemaker and Moore Creek Trails 3.US-281 South Trail 4.Stolley Park Trail 5.Riverway Trail Extension 6.Downtown Curb Extensions 7.Mormon Island Trail 8.Stuhr Road Trail 9.Oak Street Bicycle Boulevard Grand Island Regular Session - 11/24/2020 Page 157 / 167 Public Transit Ranking 1.Enhancements to Transit Service 2.Vehicle Replacement and Maintenance 3.New Transit Operations Building 0 20 40 60 80 100 120 140 160 Choice 1 Choice 2 Choice 3 Continued Replacement and Maintenance of Transit Vehicles Enhancements to Transit Service New Transit Operations Building Grand Island Regular Session - 11/24/2020 Page 158 / 167 Draft Plan Project List •Is “Fiscally-Constrained” •Based on what we can reasonably afford through 2045 •Draft Projects Selected Through: •Goals and Objectives •Identified System Needs •Public Input •Costs / Revenue Grand Island Regular Session - 11/24/2020 Page 159 / 167 Transportation Goals System Safety Multi-modal Connectivity and Accessibility Economic Vitality System Preservation Environment and System Resiliency Traffic Operations and System Reliability Grand Island Regular Session - 11/24/2020 Page 160 / 167 Roadway Projects Grand Island Regular Session - 11/24/2020 Page 161 / 167 Bicycle & Pedestrian Projects Grand Island Regular Session - 11/24/2020 Page 162 / 167 Transit Projects –Draft List •New Transit Facility •Continued Funding of Transit Operations and Maintenance •Updated Transit Development Plan •Transit Service Enhancements Grand Island Regular Session - 11/24/2020 Page 163 / 167 Next Steps •Get Your Feedback on Project Lists •Draft Plan Document: December Grand Island Regular Session - 11/24/2020 Page 164 / 167 Thank You! Questions? Grand Island Regular Session - 11/24/2020 Page 165 / 167 GIAMPO – Policy Board Tuesday, November 24, 2020 Regular Session Item E6 MPO Financial Update Staff Contact: Andres Gomez, MPO Program Manager Grand Island Regular Session - 11/24/2020 Page 166 / 167 Financial Update Unified Planning Work Program State Fiscal Year 2021 – First Quarter (July 1, 2020 to September 30, 2020) Work Completed for First Quarter • Developed the Draft FY 2021-2025 Transportation Improvement Program - Amendment 1. • Developed the Draft FY 2021 Unified Planning Work Program – Amendment 1. • Planning, preparation and outreach effort for the September project prioritization online public meeting. • Posted the LRTP advertisement on Facebook and worked with the Chamber of Commerce and Economic Development Corporation to encourage the community to participate in the online public meeting. • Started planning for the November Draft LRTP in person public meeting. • Reviewed and comment on the fiscally constrained and vision project list. • Processed NDOT crash data in relation to targets for safety performance measures. • Processed bike/ pedestrian counts along the John Brownell Trail. • Prepared materials for and/or held Transportation Advisory Committee meetings in August and Policy Board meeting in August. • Participated and attended transportation planning related meetings. Category Total Budget 1st Quarter Expenditure Total Expenditure Total Percent Expenditure Unified Planning Work Program 12,382$ 1,618$ 1,618$ 13% Transportation Improvement Program 10,834$ 2,648$ 2,648$ 24% Public Participation Plan 10,787$ 918$ 918$ 9% Short Range Studies 15,049$ 4,266$ 4,266$ 28% Long Range Transportation Plan 36,836$ 12,141$ 12,141$ 33% - Travel Demand Model and LRTP Update (Outside Services) $ 120,870 48,817$ 48,817$ 40% Transit Planning 11,834$ -$ -$ 0% Administration 44,971$ 4,324$ 4,324$ 10% Total 263,564$ 74,732$ 74,732$ 28% Grand Island Regular Session - 11/24/2020 Page 167 / 167