07-17-2018 City Council Study Session Packet
City of Grand Island
Tuesday, July 17, 2018
Study Session Packet
City Council:
Linna Dee Donaldson
Michelle Fitzke
Chuck Haase
Julie Hehnke
Jeremy Jones
Vaughn Minton
Mitchell Nickerson
Mike Paulick
Roger Steele
Mark Stelk
Mayor:
Jeremy L. Jensen
City Administrator:
Marlan Ferguson
City Clerk:
RaNae Edwards
6:00 PM
Council Chambers - City Hall
100 East 1st Street, Grand Island, NE 68801
Grand Island Study Session - 7/17/2018 Page 1 / 64
City of Grand Island Tuesday, July 17, 2018
Call to Order
This is an open meeting of the Grand Island City Council. The City of Grand Island abides by the Open
Meetings Act in conducting business. A copy of the Open Meetings Act is displayed in the back of this room
as required by state law.
The City Council may vote to go into Closed Session on any agenda item as allowed by state law.
Invocation
Pledge of Allegiance
Roll Call
A - SUBMITTAL OF REQUESTS FOR FUTURE ITEMS
Individuals who have appropriate items for City Council consideration should complete the Request for
Future Agenda Items form located at the Information Booth. If the issue can be handled administratively
without Council action, notification will be provided. If the item is scheduled for a meeting or study
session, notification of the date will be given.
B - RESERVE TIME TO SPEAK ON AGENDA ITEMS
This is an opportunity for individuals wishing to provide input on any of tonight's agenda items to reserve
time to speak. Please come forward, state your name and address, and the Agenda topic on which you will
be speaking.
Grand Island Study Session - 7/17/2018 Page 2 / 64
City of Grand Island
Tuesday, July 17, 2018
Study Session
Item -1
Discussion on Capital Improvement Fund
Staff Contact: John Collins
Grand Island Study Session - 7/17/2018 Page 3 / 64
Public Works
Capital Projects 2018/2019
Grand Island Study Session - 7/17/2018 Page 4 / 64
Public Works
2018 Planned Projects – In Progress
Stolley Park Rd Restriping/Rehabilitation
Webb Road Paving Assessments (City share)
South Front Street Bridge Replacement &
Sycamore St Underpass Rehabilitation
Old Potash; North Road to E of Webb Road
Master Plan
13th Street Improvements
Curb Ramp Installation- CDBG
Project
Five Points Intersection
Improvements
William Street Realignment
Northwest Flood Control Project
Moores Creek Drain Extension
Grand Island Study Session - 7/17/2018 Page 5 / 64
Public Works
2018 Planned Projects
Completed Projects
Capital Ave; Webb Rd to Broadwell Ave Widening (includes trail)
Annual Curb Ramp Installation
Adams St Paving Project No. 2016-P-2
Shady Bend Drainage Project No. 2017-D-2
N Broadwell Drainage Project No. 2017-D-3
Grand Island Study Session - 7/17/2018 Page 6 / 64
2018 Capital Improvement Projects
Funded by Gas Tax Money
2018 Budget 2018 Forecast
Capital Avenue; Webb Rd to Broadwell Ave Widening (includes trail)$ 184,000 $ 93,682
Stolley Park Rd Restriping/Rehab $ 285,400 $ 172,000
Annual Curb Ramp Installation $ 104,800 $ 142,403
Webb Rd Paving Assessments (City share)$ 130,000 $ 125,531
South Front St Bridge Replacement & Sycamore Underpass Rehab $ 1,200,000 $ 190,000
Curb Ramp Installation CDBG Project (2018-CR-2)$ 0 $ 20,668
Adams St Paving Project No. 2016-P-2 $ 0 $ 16,663
Old Potash; North Rd to E of Webb Rd Master Plan $ 150,000 $ 175,000
13th Street Improvements $ 1,945,775 $ 2,271,295
Five Points Intersection Improvements $ 0 $ 3,000
William Street Realignment $ 0 $ 150,000
TOTAL $ 3,999,975 $ 3,360,242
Grand Island Study Session - 7/17/2018 Page 7 / 64
2018 Capital Improvement Projects
Funded by General Fund & Special Assessments
2018 Budget 2018 Forecast
Northwest Flood Control Project $ 937,042 $ 638,036
Moores Creek Drain Extension $ 1,041,200 $ 90,000
Shady Bend Drainage Project No. 2017-D-2 $ 0 $ 828
N Broadwell Drainage Project No. 2017-D-3 $ 0 $ 110,563
TOTAL $ 1,978,242 $ 839,427
Grand Island Study Session - 7/17/2018 Page 8 / 64
Summary of Capital Improvement Projects
2018 Budget 2018 Forecast
Funded by Gas Tax Money $ 3,999,975 $ 3,360,242
Funded by General Fund & Special Assessments $ 1,978,242 $ 839,427
TOTAL CAPITAL REQUESTS $ 5,978,217 $ 4,199,669
Grand Island Study Session - 7/17/2018 Page 9 / 64
Public Works
Proposed Capital Projects for 2018/2019
Annual Curb Ramp Installation
South Front St Bridge Replacement &
Sycamore St Underpass Rehab
Pavement Condition Survey
13th Street Improvements
Old Potash Phase I; Claude Rd to
Webb Rd (PE/ROW)
West US Highway 30 Realignment
Five Points Intersection Improvements
(PE/ROW)
Webb Road Paving Assessments (City
share)
US Highway 281 Lighting (Stolley
Park Rd to US Hwy 30 Overpass)
Broadwell/UPRR Grade Separation
Feasibility Study
Traffic Services Evaluation- Various
Locations
Northwest Flood Control Project
N Broadwell Ave Drainage
Kaufman Detention Cell Outlet
W US Highway 30 Drainage &
Pedestrian Under Crossing
Drainage W of Harrison Street
Grand Island Study Session - 7/17/2018 Page 10 / 64
Public Works
Annual Curb Ramp Installation
$150,000
Required per Federal American
Disabilities Act (ADA) Regulations – City
of Grand Island’s handicap ramp
installation program follows the previous
year’s asphalt program and other priority
corridors. Additional locations are added
as funds allow.
Grand Island Study Session - 7/17/2018 Page 11 / 64
Public Works
South Front St Bridge Replacement & Sycamore St Underpass Rehab
$2,200,000
($2.9M total project cost)Replace bridge deck, two (2) abutment walls, patch and seal
retaining walls, improve drainage, and reconstruct pump
station
Construction anticipated to begin
August 2018, with completion
August 2019
Grand Island Study Session - 7/17/2018 Page 12 / 64
Grand Island Study Session - 7/17/2018 Page 13 / 64
Pavement Condition Survey
$150,000Data gathered determines roadways to become part of the
annual maintenance/rehabilitation projects, and those that
require more substantial work or rebuild
Minimum requirement to assess
roadway pavement every three
(3) years
Information is used for the
City’s annual audit, as well as
GASB 34
Grand Island Study Session - 7/17/2018 Page 14 / 64
Public Works
13th Street Improvements
$200,000
($2.5M total project cost)Construction began May 2018, with completion
slated for November 2018
Budget will address cleanup work and final payouts
Grand Island Study Session - 7/17/2018 Page 15 / 64
Public Works
Old Potash Phase I; Claude Rd to Webb Rd (PE/ROW)
$600,000 ($13M - $17M total project cost)The interaction between the various traffic features is complex,
prompting the creation of a master plan for the corridor to ensure that
the individual street and intersection projects will function together
Preferred alternative was recently presented, which included widening
and reconfiguring Old Potash, signal and geometric improvements at
each intersection, and increased connectivity to roadway network
Anticipated expenditures will include design engineering and property
acquisition
Grand Island Study Session - 7/17/2018 Page 16 / 64
Grand Island Study Session - 7/17/2018 Page 17 / 64
Public Works
West US Highway 30 Realignment
$1,533,000
($30.7M total project- City share is $2.3M)
Expansion of West US Highway 30 from a 2-lane to
4-lane divided highway, with majority being
realigned
NDOT project lead
Partially funded with Nebraska Build Act
Grand Island Study Session - 7/17/2018 Page 18 / 64
Grand Island Study Session - 7/17/2018 Page 19 / 64
Public Works
Five Points Intersection Improvements (PE/ROW)
$170,000
(Total Project Cost = $2,265,300)80% Federally funded safety project through Nebraska
Department of Transportation (NDOT)
Consists of geometric improvements, new traffic signal or
multi-lane roundabout
Will right size the lane configuration to optimize safety
and efficiency, and meet the Federal Highway
Administration (FHWA) safety program requirements
Grand Island Study Session - 7/17/2018 Page 20 / 64
Public Works
Grand Island Study Session - 7/17/2018 Page 21 / 64
Public Works
Webb Road Paving Assessment (City share)
$130,000
The City portion of the Webb Road paving improvements
under District No. 1260 were set at $803,896.74
Installments are set to be paid over the ten (10) year
timeframe set by the Board of Equalization – 2019 is
payment year four (4)
Grand Island Study Session - 7/17/2018 Page 22 / 64
Public Works
US Highway 281 Lighting
(Stolley Park Rd to US Hwy 30 Overpass)
$95,000
Addition of roadway lighting to allow for improved
safety by creating consistent lighting for commuters
on US Highway 281
Last section from north to south side through the City
Grand Island Study Session - 7/17/2018 Page 23 / 64
Grand Island Study Session - 7/17/2018 Page 24 / 64
Public Works
Broadwell/UPRR Grade Separation Feasibility Study
$125,000
Required report to become eligible for NDOT Rail
Safety funds (up to 90% of project cost)
Assess potential solutions to
vehicle traffic conflicts with
railroad crossing
Anticipate 10 year
process to acquire funds
Grand Island Study Session - 7/17/2018 Page 25 / 64
Grand Island Study Session - 7/17/2018 Page 26 / 64
Public Works
Traffic Services Evaluation- Various Locations
$100,000
Evaluate pedestrian/traffic crossings at various locations
Analyze signal timing along Hwy 281 corridor
Grand Island Study Session - 7/17/2018 Page 27 / 64
Public Works
Northwest Flood Control project
$641,355 ($26M total project cost)
Drainage Project (CPNRD) – City/CPNRD cost sharing project for
flood control improvements along the Prairie, Moores & Silver
Creek watershed to alleviate flooding in the northwest area of
Grand Island. A flood zone map revision for NW Grand Island will
follow.
The final portion of this project is the levy, which was bid June
2018, with completion slated in early 2019
Funding is over a 14 year period, which began in FY 2005
Grand Island Study Session - 7/17/2018 Page 28 / 64
Public Works
North Broadwell Ave Drainage
$200,000
Remove trees and regrade
ditch to allow for proper
maintenance and improved
channel flow
Grand Island Study Session - 7/17/2018 Page 29 / 64
Public Works
Kaufman Detention Cell Outlet
$500,000
Drainage in connection with Old Potash Highway
improvements
Additional impermeable surface due to development in
area has increased the need
for detention and drainage
Project will reduce
standing water
Grand Island Study Session - 7/17/2018 Page 30 / 64
Grand Island Study Session - 7/17/2018 Page 31 / 64
Public Works
West US Highway 30 Drainage & Pedestrian Under Crossing
$460,000 ($900k total project cost)
An oversized box culvert under US Highway 30 will
facilitate drainage and allow for pedestrian under crossing
This fits in with the recently developed Bike / Pedestrian
Master Plan
Grand Island Study Session - 7/17/2018 Page 32 / 64
Public Works
Drainage West of Harrison Street
$200,000
Between Arthur & Harrison
Enclose ditch along hike/bike
trail to aid in maintenance &
safety
Drainage pipe extension –
Sugar Beet ditch
Grand Island Study Session - 7/17/2018 Page 33 / 64
2019 Capital Improvement Projects
Funded with Gas Tax Money
2019 Budget
Annual Handicap Ramp Installation $ 150,000
South Front St Bridge Replacement & Sycamore St Underpass Rehab $ 2,200,000
Pavement Condition Survey $ 150,000
13th Street Improvements $ 200,000
Old Potash Phase I; Claude Rd to Webb Rd (PE/ROW)$ 600,000
West US Highway 30 Realignment $ 1,533,000
Five Points Intersection Improvements (PE/ROW)$ 170,000
Webb Rd Paving Assessments (City share)$ 130,000
US Highway 281 Lighting (Stolley Park Rd to US Hwy 30 Overpass)$ 95,000
Broadwell/UPRR Grade Separation Feasibility Study $ 125,000
Traffic Services Evaluation- Various Locations $ 100,000
TOTAL $ 5,453,000
Grand Island Study Session - 7/17/2018 Page 34 / 64
2019 Capital Improvement Projects
Funded by Other Revenue
2019 Budget
Northwest Flood Control Project $ 641,355
N Broadwell Ave Drainage $ 200,000
Kaufman Detention Cell Outlet $ 500,000
West US Hwy 30 Drainage & Pedestrian Under Crossing $ 460,000
Drainage West of Harrison Street $ 200,000
TOTAL $ 2,001,355
Grand Island Study Session - 7/17/2018 Page 35 / 64
2019 Capital Improvement Budget Summary
2019 Budget
Funded by Gas Tax Money (Streets)$ 5,453,000
Funded by Other Revenue (Drainage)$ 2,001,355
TOTAL CAPITAL REQUESTS $ 7,454,355
•$300,000 of capital dollars is mandated
•$1,703,000 of capital dollars is funding Federal Aid projects
Grand Island Study Session - 7/17/2018 Page 36 / 64
2019 Funding Sources- 210 Fund
Balance Forward $ 2,659,168
State Gas Tax Fund $ 5,417,759
NDOT Buy Backs $ 937,841
Other Revenue $ 4,055,275
Total available funding $ 13,070,043
210 Fund Capital Projects $ 5,453,000
210 Streets Operating & Maintenance $ 6,047,538
Remaining 210 Funds $ 1,569,505
Grand Island Study Session - 7/17/2018 Page 37 / 64
Public Works
2019 Future Project Expenses
Project 2020 2021 2022 2023
Annual Curb Ramp Installation $ 153,000 $ 156,000 $ 159,181 $ 162,365
Old Potash Phase I; Claude Rd to Webb Rd $3,000,000 $3,000,000
Webb Road Paving Assessments (City share)$ 130,000 $ 130,000 $ 130,000 $ 130,000
Pavement Condition Survey $ 154,500
Five Points Roundabout Safety Project $ 420,000
US Highway 30 West Realignment (NDOT project)$ 800,000
Construction of NW Flood Control Project $ 160,131
Moores Creek Extension $2,000,000
TOTALS $4,243,131 $3,706,000 $2,443,681 $292,365
Grand Island Study Session - 7/17/2018 Page 38 / 64
City of Grand Island
Tuesday, July 17, 2018
Study Session
Item -2
Discussion on Half Cent Sales Tax
Staff Contact: Marlan Ferguson, William Clingman
Grand Island Study Session - 7/17/2018 Page 39 / 64
Administration
Sales Tax
Let’s Keep Grand Island Growing
Grand Island Study Session - 7/17/2018 Page 40 / 64
State Statute 77-27,142 allows incorporated
municipalities to impose a sales and use tax of up to ½%
above the allowed 1 ½%
Ø Must be approved by 70% of the City Council to allow
for a vote
Ø Must be voted on at a primary or general election
Ø Proceeds can only be used for public infrastructure
projects and capital equipment purchases
What do we know?
Grand Island Study Session - 7/17/2018 Page 41 / 64
Ø Shall terminate no more than 10 years after its effective
date, or if bonds are issued and the sales tax revenue is
used for payment of bonds.
Ø An interlocal agreement must be established with a
political subdivision within the City/County. Cannot be
one that was in existence for 1-year preceding the
election.
Ø If vote fails, cannot be voted on again for at least 23
months.
What do we know? (cont.)
Grand Island Study Session - 7/17/2018 Page 42 / 64
LB357-Local Option Sales Tax Bill
Passed April 18, 2012 to allow cities an additional ½%
17 Other Nebraska communities have adopted an additional
sales tax (greater than 1 ½%)
History
Grand Island Study Session - 7/17/2018 Page 43 / 64
Goal
Our goal is to put before the voters an additional ½% sales tax on
all eligible purchases made in Grand Island. The additional ½%
would begin in April, 2019.
THE VOTE: November 6, 2018
We believe that the increase, shared by Grand Islanders and all who visit,
will provide the City the additional financial resources needed
to make continued infrastructure improvements and public safety equipment
purchases.
Grand Island Study Session - 7/17/2018 Page 44 / 64
Interlocal Agreement with
Community Redevelopment Authority
§State Statue requirement
§Cannot be one that was in existence for 1-year
preceding the election
§Not required to use funds for the purpose of the
agreement
Grand Island Study Session - 7/17/2018 Page 45 / 64
Proposed Ballot Language Summary
Shall the governing body of the City of Grand Island increase the local sales and use tax
rate by an additional one-half of one percent (1/2%) from the current rate of one and one-
half percent (1 ½%) to a rate of two percent (2%) and impose a sales and use tax at the
increased rate upon the same transactions within such municipality on which the State of
Nebraska is authorized to impose a tax, the revenue from such increased rate to be used for
public infrastructure projects as allowed pursuant to the Local Option Revenue Act, which
increased rate shall terminate no more than ten years after the effective date of the increased
sales and use tax or, if bonds are issued and the local option sales and use tax revenue is
pledged for payment of such bonds, upon payment of such bonds and any refunding bonds,
whichever date is later, and increase its budgeted restricted funds for fiscal year 2019-2020
by $5,500,000, sixteen percent (16%) over the current year’s restricted funds, to permit the
expenditure of revenue derived from the increased rate?
Grand Island Study Session - 7/17/2018 Page 46 / 64
The additional revenue would be used
to fund Infrastructure Projects and General Fund Capital
Equipment
Additional Dollars
½% = $5,500,000
Infrastructure Projects:
$3,000,000 (54%) = Replace $1,500,000 Wheel Tax Funds
$1,500,000 New Funds
Capital Equipment Fund:
$2,500,000 (46%) = Public Safety
$1,250,000 Capital Equipment
$1,250,000 General Fund Capital Equipment
Grand Island Study Session - 7/17/2018 Page 47 / 64
Infrastructure Projects
Ø Old Potash Highway
Ø North Road
Ø Downtown Parking Lots
Ø Sidewalks: (Examples – Independence and George Park)
Ø Upgrade Gravel Streets: (Examples – Macron and Jay Street)
Ø Handicap Ramp Installations
Ø Moores Creek Flood Control
Ø South Locust – Koenig to Fonner
Ø State Street
Ø Eddy Street Underpass
Grand Island Study Session - 7/17/2018 Page 48 / 64
Capital Equipment Projects
Public Safety
Fire Department – 5 Year Plan:
•$ 510,000: Fire Engine (Replace a 2000 model)
•$ 500,000: Ambulances (Replace 2000 and a 2003)
•$ 40,000: Shift Commander Vehicle (Replace 2012)
•$ 375,000: Fire Station remodel (Station #1 and #2)
•$ 325,000: SCBA replacement
•$1,000,000: Ladder Truck Replacement (Replace 1999 model) (6-10 years)
Police Department:
•Police Vehicles: $ 83,000 per year (1-5 years)
•Police Vehicles: $122,000 per year (6-10 years)
•Other Equipment: $200,000 per year (1-10 years)
Grand Island Study Session - 7/17/2018 Page 49 / 64
Capital Equipment General Fund
Ø Street Department
Ø Engineering
Ø Building
Grand Island Study Session - 7/17/2018 Page 50 / 64
DISCUSSION
Grand Island Study Session - 7/17/2018 Page 51 / 64
Broadwell / UPRR Grade Separation Feasibility 125,000.00$
Annual Handicap Ramp Installation 150,000.00$
Webb Rd Assessment Payments 130,000.00$
S Front St over Sycamore Underpass Rehab 2,200,000.00$
Pavement Condition Survey 150,000.00$
Hwy 30 Realignment 1,530,000.00$
Old Potash; Claude to Webb (PE/ROW)600,000.00$
Hwy 281 Lighting (Stolley Park to Hwy 30 overpass)95,000.00$
5-Points Intersection (PE/ROW)170,000.00$
Various Traffic Study Locations 100,000.00$
North Rd & 13th 200,000.00$
TOTAL 5,450,000.00$
Current Plan Plan with 1/2 Cent Sales Tax
5-Points Intersection (CONST/CE) - pay ahead for 2021 CONST 420,000.00$ 5-Points Intersection (CONST/CE) - pay ahead for 2021 CONST 420,000.00$
Old Potash; Claude to Webb (PE/ROW)2,884,000.00$ Old Potash; Claude to Webb (PE/ROW)2,884,000.00$
Webb Rd Assessment Payments 133,900.00$ Webb Rd Assessment Payments 133,900.00$
Annual Handicap Ramp Installation 250,000.00$ Annual Handicap Ramp Installation 154,500.00$
Annual Sidewalk Program 51,500.00$
Downtown Parking - Phase 1 1,854,000.00$
TOTAL 3,687,900.00$ TOTAL 5,497,900.00$
Hwy 2 Resurfacing 198,000.00$ Hwy 2 Resurfacing 198,000.00$
Old Potash; Claude to Webb (1/2 CE, 1/2 CONST)4,243,600.00$ Old Potash; Claude to Webb (1/2 CE, 1/2 CONST)4,880,140.00$
Annual Handicap Ramp Installation 159,135.00$ Annual Handicap Ramp Installation 159,135.00$
Webb Rd Assessment Payments 130,000.00$ North Road; Hwy 2 to Capital (PE/ROW)318,270.00$
Webb Rd Assessment Payments 130,000.00$
Annual Sidewalk Program 53,045.00$
TOTAL 4,730,735.00$ TOTAL 5,738,590.00$
Hwy 30 bridges 80,000.00$ Hwy 30 bridges 80,000.00$
Pavement Condition Survey 163,909.05$ Pavement Condition Survey 163,909.05$
Old Potash; Claude to Webb (1/2 CE, 1/2 CONST)4,370,908.00$ North Road; Hwy 2 to Capital (CE/CONST)1,420,545.10$
North Road; Hwy 2 to Capital (PE/ROW)327,818.10$ Annual Handicap Ramp Installation 163,909.05$
Annual Handicap Ramp Installation 163,909.05$ Old Potash; Claude to Webb (1/2 CE, 1/2 CONST)3,715,271.80$
Webb Rd Assessment Payments 130,000.00$ Webb Rd Assessment Payments 130,000.00$
Annual Sidewalk Program 54,636.35$
TOTAL 5,236,544.20$ TOTAL 5,728,271.35$
Webb Rd Assessment Payments 130,000.00$ Webb Rd Assessment Payments 130,000.00$
Hwy 281 Corridor Study; Diers to Webb 450,203.52$ Locust Reconstrucion; Koenig to Fonner (PE/ROW)450,203.52$
North Road; Hwy 2 to Capital (CE/CONST)2,926,322.91$ North Road; Hwy 2 to Capital (CE/CONST)1,463,161.45$
Locust Reconstrucion; Koenig to Fonner (PE/ROW)450,203.52$ Stolley Park Road; State Fair to Stuhr (PE/ROW)393,928.08$
Annual Handicap Ramp Installation 168,826.32$ Moores Creek (PE/ROW)1,012,957.93$
Downtown Parking - Phase 2 1,294,335.13$
Annual Handicap Ramp Installation 168,826.32$
Hwy 281 Corridor Study; Diers to Webb 450,203.52$
Annual Sidewalk Program 56,275.44$
TOTAL 4,125,556.28$ TOTAL 5,419,891.41$
Webb Rd Assessment Payments 130,000.00$ Webb Rd Assessment Payments 130,000.00$
Locust Reconstrucion; Koenig to Fonner (1/2 CE, 1/2 CONST)3,477,822.22$ Annual Handicap Ramp Installation 173,891.11$
State Street; Layfayete to Broadwell (PE/ROW)347,782.22$ Moores Creek (CE/CONST)579,637.04$
Annual Handicap Ramp Installation 173,891.11$ Locust Reconstrucion; Koenig to Fonner (1/2 CE, 1/2 CONST)2,898,185.19$
Stolley Park Road; State Fair to Stuhr (1/2 CE/ 1/2 CONST)1,622,983.70$
Annual Sidewalk Program 57,963.70$
TOTAL 4,129,495.56$ TOTAL 5,462,660.74$
Pavement Condition Survey 179,107.84$ Pavement Condition Survey 179,107.84$
Locust Reconstrucion; Koenig to Fonner (1/2 CE, 1/2 CONST)1,910,483.67$ Locust Reconstrucion; Koenig to Fonner (1/2 CE, 1/2 CONST)2,985,130.74$
State Street; Layfayete to Broadwell (CE/CONST)1,432,862.76$ Stolley Park Road; State Fair to Stuhr (1/2 CE/ 1/2 CONST)835,836.61$
Stolley Park Road; State Fair to Stuhr (PE/ROW)417,918.30$ Moores Creek (CE/CONST)597,026.15$
Annual Handicap Ramp Installation 179,107.84$ State Street; Layfayete to Broadwell (PE/ROW)358,215.69$
Annual Sidewalk Program 59,702.61$
Annual Handicap Ramp Installation 179,107.84$
Old Potash; Claude to North (PE/ROW)417,918.30$
TOTAL 4,119,480.42$ TOTAL 5,612,045.79$
Stolley Park Road; State Fair to Stuhr (CE/CONST)2,090,785.57$ North Road; Captial to State (PE/ROW)614,936.93$
Old Potash; Claude to North (PE/ROW)430,455.85$ Old Potash; Claude to North (CE/CONST)2,336,760.34$
State Street; Layfayete to Broadwell (CE/CONST)860,911.71$ Annual Handicap Ramp Installation 184,481.08$
North Road; Captial to State (PE/ROW)516,547.02$ State Street; Layfayete to Broadwell (CE/CONST)2,213,772.96$
Annual Handicap Ramp Installation 184,481.08$ Annual Sidewalk Program 61,493.69$
TOTAL 4,083,181.23$ TOTAL 5,411,445.01$
North Road; Captial to State (CE/CONST)1,773,478.11$ Annual Handicap Ramp Installation 190,015.51$
Stolley Park Road; State Fair to Stuhr (CE/CONST)506,708.03$ Old Potash; Claude to North (CE/CONST)1,646,801.11$
Old Potash; Claude to North (CE/CONST)2,026,832.13$ North Road; Captial to State (CE/CONST)3,040,248.20$
Annual Handicap Ramp Installation 190,015.51$ North Road; State to 13th (PE/ROW)506,708.03$
Annual Sidewalk Program 63,338.50$
TOTAL 4,497,033.79$ TOTAL 5,447,111.35$
Pavement Condition Survey 195,715.98$ Pavement Condition Survey 195,715.98$
North Road; Captial to State (CE/CONST)1,826,682.46$ North Road; Captial to State (CE/CONST)391,431.96$
Old Potash; Claude to North (CE/CONST)1,304,773.18$ North Road; State to 13th (CE/CONST)3,457,648.94$
Webb Road; Old Potash to UP (PE/ROW)443,369.53$ Independence Ave; Capital to Manchester(PE/ROW)456,670.61$
North Road; State to 13th (PE/ROW)521,909.27$ Annual Handicap Ramp Installation 195,715.98$
Annual Handicap Ramp Installation 195,715.98$ Annual Sidewalk Program 65,238.66$
Hwy 281 Corridor Study; Diers to Webb 521,909.27$
TOTAL 4,488,166.40$ TOTAL 5,284,331.39$
North Road; State to 13th (PE/ROW)537,566.55$ North Road; State to 13th (CE/CONST)201,587.46$
Webb Road; Old Potash to UP (CE/CONST)3,359,790.95$ North Road; 13th to Faidley (PE/ROW)470,370.73$
Annual Handicap Ramp Installation 201,587.46$ Broadwell / UPRR Grade Seperation (PE/ROW)2,000,000.00$
Webb Road; Old Potash to UP (PE/ROW)537,566.55$
Independence Ave; Capital to Manchester(CE/CONST)2,015,874.57$
Annual Handicap Ramp Installation 201,587.46$
Annual Sidewalk Program 67,195.82$
TOTAL 4,098,944.96$ TOTAL 5,494,182.59$
North Road; State to 13th (CE/CONST)2,768,467.74$ Broadwell / UPRR Grade Seperation (PE/ROW)1,000,000.00$
Webb Road; Old Potash to UP (CE/CONST)692,116.94$ Webb Road; Old Potash to UP (CE/CONST)2,076,350.81$
Independence Ave; Capital to Manchester(PE/ROW)484,481.85$ Independence Ave; Capital to Manchester(CE/CONST)692,116.94$
Annual Handicap Ramp Installation 207,635.08$ Annual Handicap Ramp Installation 207,635.08$
Annual Sidewalk Program 69,211.69$
North Road; 13th to Faidley (CE/CONST)1,730,292.34$
TOTAL 4,152,701.61$ TOTAL 5,775,606.85$
North Road; State to 13th (CE/CONST)1,425,760.89$ Webb Road; Old Potash to UP (CE/CONST)2,138,641.33$
Broadwell / UPRR Grade Seperation (PE/ROW)4,277,282.66$ North Road; Faidley to Old Potash (PE/ROW)356,440.22$
Independence Ave; Capital to Manchester(PE/ROW)499,016.31$ North Road; Faidley to Old Potash (CE/CONST)3,564,402.22$
Independence Ave; Capital to Manchester(CE/CONST)3,421,826.13$ North Road; 13th to Faidley (CE/CONST)1,140,608.71$
North Road; 13th to Faidley (PE/ROW)570,304.35$
North Road; 13th to Faidley (PE/ROW)4,277,282.66$
Downtown Parking 4,189,000.00$
Annual Sidewalk 659,601.48$
19,320,074.48$ 7,200,092.48$
2019 PROJECTS
2031+ PROJECTS
2022 PROJECTS
2023 PROJECTS
2024 PROJECTS
2025 PROJECTS
2026 PROJECTS
2027 PROJECTS
2028 PROJECTS
2029 PROJECTS
2030 PROJECTS
2020 PROJECTS
2021 PROJECTS
Grand Island Study Session - 7/17/2018 Page 52 / 64
(1)12,140,304.33$
(2)973,816.44$
(3)-$
Prior Year Capital Improvements Excluded from Restricted Funds
(From 2017-2018 Lid Support, Line (17))$ 8,209,347.00 (4)
LESS: Amount Spent During 2017-2018 $ 6,431,965.00 (5)
LESS: Amount Expected to be Spent in Future Budget Years $ 1,777,382.00 (6)
(7)-$
(8)1,390,540.50$
(9)15,518,192.28$
(10)-$
(11)5,417,759.00$
(12)-$
(13)385,000.00$
(14)707,083.12$
(15)-$
(15a)-$
TOTAL RESTRICTED FUNDS (A)(16)36,532,695.67$
Capital Improvements (Real Property and Improvements
on Real Property)7,454,355.00$ (17)
LESS: Amount of prior year capital improvements that were excluded
from previous lid calculations but were not spent and now budgeted
this fiscal year (cannot exclude same capital improvements from more
than one lid calculation.)
Agrees to Line (6).1,777,382.00$ (18)
(19)5,676,973.00$
(20)
(21)
(22)1,203,731.00$
(23)
(24)
Judgments (25)
Refund of Property Taxes to Taxpayers (26)
(27)
TOTAL LID EXCEPTIONS (B)(28)6,880,704.00$
$ 29,651,991.67
Total Restricted Funds for Lid Computation cannot be less than zero. See Instruction Manual
on completing the Lid Supporting Schedule.
Public Safety Communication Project (Statute 86-416)
TOTAL RESTRICTED FUNDS
For Lid Computation
(To Line 9 of the Lid Computation Form)
To Calculate: Total Restricted Funds (A)-Line 16 MINUS Total Lid Exceptions (B)-Line 28
Repairs to Infrastructure Damaged by a Natural Disaster
Payments to Retire Interest-Free Loans from the Department of Aeronautics
(Public Airports Only)
Prior Year Budgeted Capital Improvements that were excluded from Restricted Funds.
Motor Vehicle Fee
Municipal Equalization Fund
Motor Vehicle Tax
Local Option Sales Tax
Transfers of Surplus Fees
Highway Allocation and Incentives
MIRF
Amount to be included as Restricted Funds (Cannot Be A Negative Number)
Insurance Premium Tax
Lid Exceptions
Interlocal Agreements/Joint Public Agency Agreements
Allowable Capital Improvements
Bonded Indebtedness
Public Facilities Construction Projects (Statutes 72-2301 to 72-2308)
Nameplate Capacity Tax
In-Lieu of Tax Payments
Grand Island in Hall County
Motor Vehicle Pro-Rate
2018-2019 LID SUPPORTING SCHEDULE
Calculation of Restricted Funds
Total Personal and Real Property Tax Requirements
DRAFTGrand Island Study Session - 7/17/2018 Page 53 / 64
LID COMPUTATION FORM
IN
Hall County
31,272,899.09
Option 1 - (1)
Line (1) of 2017-2018 Lid Computation Form 31,272,899.09
Option 2 - (A)
Allowable Percent Increase Less Vote Taken
(From 2017-2018 Lid Computation Form Line (6) - Line (5)) %
Option 2 - (B)
Dollar Amount of Allowable Increase Excluding the vote taken
Line (A) X Line (B)-
Option 2 - (C)
Calculated 2017-2018 Restricted Funds Authority (Base Amount) =
Line (A) Plus Line (C)31,272,899.09
Option 2 - (1)
1 BASE LIMITATION PERCENT INCREASE (2.5%)2.50 %
(2)
2 ALLOWABLE GROWTH PER THE ASSESSOR MINUS 2.5%- %
/ = 0.00 %
(3)
2018 Growth
per Assessor
2017 Valuation Multiply times
100 To get %
3 ADDITIONAL ONE PERCENT COUNCIL/BOARD APPROVED INCREASE 1.00 %
8 / 10 = 80.00 %
(4)
# of Board Members
voting "Yes" for
Increase
Total # of Members
in Governing Body at
Meeting
Must be at least
75% (.75) of the
Governing Body
ATTACH A COPY OF THE BOARD MINUTES APPROVING THE INCREASE.
4 %
(5)
Please Attach Ballot Sample and Election Results OR Record of Action From Townhall Meeting
Grand Island
SPECIAL ELECTION/TOWNHALL MEETING - VOTER
APPROVED % INCREASE
COMPUTATION OF LIMIT FOR FISCAL YEAR 2018-2019
PRIOR YEAR RESTRICTED FUNDS AUTHORITY OPTION 1 OR OPTION 2
OPTION 1
2017-2018 Restricted Funds Authority (Base Amount) = Line (8) from last year's Lid Form
OPTION 2 - Only use if a vote was taken at a townhall meeting to exceed Lid for one year
ALLOWABLE INCREASES
DRAFTGrand Island Study Session - 7/17/2018 Page 54 / 64
LID COMPUTATION FORM
IN
Hall County
Grand Island
TOTAL ALLOWABLE PERCENT INCREASE = Line (2) + Line (3) + Line (4) + Line (5)3.50 %
(6)
Allowable Dollar Amount of Increase to Restricted Funds = Line (1) x Line (6)1,094,551.47
(7)
Total Restricted Funds Authority = Line (1) + Line (7)32,367,450.56
(8)
Less: Restricted Funds from Lid Supporting Schedule 29,651,991.67
(9)
Total Unused Restricted Funds Authority = Line (8) - Line (9)2,715,458.89
(10)
LINE (10) MUST BE GREATER THAN OR EQUAL TO ZERO OR
YOU ARE IN VIOLATION OF THE LID LAW.
THE AMOUNT OF UNUSED RESTRICTED FUNDS AUTHORITY ON LINE (10)
MUST BE PUBLISHED IN THE NOTICE OF BUDGET HEARING.DRAFTGrand Island Study Session - 7/17/2018 Page 55 / 64
City of Grand Island
Tuesday, July 17, 2018
Study Session
Item -3
Discussion on Capital Equipment Request: General Fund
Staff Contact: Marlan Ferguson, William Clingman
Grand Island Study Session - 7/17/2018 Page 56 / 64
PUBLIC WORKS ENGINEERING VEHICLE INVENTORY
July 12th, 2018
Unit 303 308 310 304 301 309
Name 2001 Dodge Ram 1500 2002 Chevrolet Impala 2004 Chevrolet Silverado 2008 Ford Super Duty F-250 2010 Ford F-150 2015 Chevrolet Traverse
4dr Quad Cab 139" WB 4dr Sdn 1500 Ext Cab 143.5" WB Work Truck SRW 4WD SuperCab 142" XL 4WD SuperCab 145" XL AWD 4dr LS
Generic Color Maroon Gold Tan Maroon Red Blue
Current Mileage 79122 Not Available (95105 on 05/23//18)48375 31632 23414 20706
VIN 1B7HC13YX1J201868 2G1WF52E629231436 1GCEC19V54Z250465 1FTSX215X8ED45321 1FTEX1E80AKA20695 1GNKVFED3FJ276207
MFR Model Code BE1L33 1WF19 CC15753 X21 X1E CV14526
Body Type Standard Bed 4dr Car Standard Bed Standard Bed Standard Bed Sport Utility
Pass Doors 4 4 2 2 2 4
Exterior Color Dark Garnet Red Pearl Sandrift Metallic Sandstone Metallic Dark Toreador Red Vermillion Red Red E4 Blue Velvet Metallic
Color Code PRV 49U 15U JM E4 G1M
Alternative Name 2WD Quad Cab 6.5 Ft Box 2WD Extended Cab Standard Box Work Truck 4WD SuperCab 6-3/4 Ft Box XL 4WD SuperCab 6-1/2 Ft Box XL AWD LS
Alternative Body Crew Cab Pickup - Short Bed 4dr Car Extended Cab Pickup - Short Bed Extended Cab Pickup - Standard Bed Extended Cab Pickup - Standard Bed Sport Utility
Drivetrain Rear Wheel Drive Front Wheel Drive Rear Wheel Drive Four Wheel Drive Four Wheel Drive All Wheel Drive
Engine Type 8 Cylinder Engine V6 Cylinder Engine 8 Cylinder Engine 8 Cylinder Engine 8 Cylinder Engine V6 Cylinder Engine
Displacement L/CI 5.2/318 3.4/205 4.8/293 5.4/330 4.6/281 3.6/217
Fuel Type Gasoline Fuel Gasoline Fuel Gasoline Fuel Gasoline Fuel Gasoline Fuel Gasoline Fuel
Horsepower 230.0 @ 4400 180.0 @ 5200 285.0 @ 5600 300.0 @ 5000 292.0 @ 5700 281.0 @ 6300
Fuel Economy 13.0 City / 18.0 Highway 21.0 City / 32.0 Highway 17.0 City / 20.0 Highway 0.0 City / 0.0 Highway 14.0 City / 20.0 Highway 16.0 City / 23.0 Highway
Fuel Capacity 26.0 / 35.0 gal 17.0 gal 26.0 gal 30.0 / 38.0 gal 36.0 gal 22.0 gal
Net Torque 300.0 @ 3200 205.0 @ 4000 295.0 @ 400 365.0 @ 3750 320.0 @ 4000 266.0 @ 3400
10 Year Replacement 164%150%129%100%90%72%
Original MSRP $21,045.00 $20,325.00 $23,600.00 $28,000.00 $29,030.00 $32,995.00
Invoice $18,729.00 $18,597.38 $20,650.00 $26,060.00 $26,994.00 $31,675.21
Destination Charge $715.00 $635.00 $850.00 $950.00 $975.00 $875.00
2018 Service Costs $43.23 $1,263.14 $133.85 $130.05 $0.00 $206.09
2017 Service Costs $90.37 $349.42 $620.75 $676.91 $1,523.02 $216.91
Grand Island Study Session - 7/17/2018 Page 57 / 64
Budget Year
Current Vehicle
Current 2018 State Bid Price Future Model Year PriceReplaement Vehicle
2020
2001 Dodge Ram 1500 - 303
$ 30,367.00 $ 32,216.35Current Production Year 1/2 Ton Extended Cab 4w4 4 Door Truck
2021
2002 Chevrolet Impala - 308
$ 20,429.00 $ 22,323.32Current Production Year Intermediate 4 Door Sedan Flex Fuel Vehicle E85
2022
2004 Chevrolet Silverado - 310
$ 30,367.00 $ 34,178.33Current Production Year 1/2 Ton Extended Cab 4w4 4 Door Truck
2023
2008 Ford Super Duty F-250 - 304
$ 30,367.00 $ 35,203.68Current Production Year 1/2 Ton Extended Cab 4w4 4 Door Truck
2025
2010 Ford F-150 - 301
$ 30,367.00 $ 37,347.58Current Production Year 1/2 Ton Extended Cab 4w4 4 Door Truck
2030
2015 Chevrolet Traverse - 309
$ 27,652.00 $ 39,425.14Current Production Year Large Sport Utility 7 Passenger Flex Fuel Vehicle E85
Grand Island Study Session - 7/17/2018 Page 58 / 64
Page 1 of 3
2018 -2019 -2020 -2021 -2022 -2023 -2024 -2025 -2026 -2027 -
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
1/2 Ton Pick-Up Truck Budget Total for Class - 30,000 - 32,000 - 35,000 - 37,000 - 39,000
Description Unit Year
Replacement
Year Notes
Extended Cab, 4x4 201 1999 2009 30,000
*Regular Cab 210 1999 2009 replaced this FY, new truck just delivered
Regular Cab 207 2004 2014 32,000
Regular Cab 215 2007 2017 35,000
Extended Cab, 4x4 204 2008 2018 37,000
Regular Cab 202 2013 2023 39,000
Extended Cab, 4x4 209 2015 2025
Extended Cab, 4x4 206 2016 2026
/4 Ton -1 Ton Pick-Up Truck Budget Total for Class - - 40,000 - 60,000 - 50,000 - - -
Description Unit Year
Replacement
Year Notes
Tack Truck 250 2001 2011 converted to full-time tack truck in 2018 50,000
Regular Cab, 4x4 214 2006 2016 40,000
Crew Cab, Utlitiy Body 216 2013 2023 60,000
Utility Trucks > 1 Ton 15 years Budget Total for Class 130,000 - - 145,000 - 65,000 - - 150,000 -
Description Unit Year
Replacement
Year Notes
Platform Aerial Lift 213 1995 2010 145,000
Sign bucket truck 212 1999 2014 130,000
Flatbed 205 2002 2017 65,000
Signal bucket truck 203 2016 2031 150,000
Flatbed 208 2017 2032
Dump Truck 15-25K Budget Total for Class - 80,000 - 80,000 - - 80,000 80,000 - 80,000
Description Unit Year
Replacement
Year Notes
FT Salt Truck 211 2002 2022 recently converted to FT salt truck 80,000
Flatbed 218 2002 2022 80,000
FT Salt Truck 226 2003 2023 80,000
FT Salt Truck 227 2006 2026 80,000
Dump Body 220 2007 2027 80,000
Dump Body/ PT Salt Truck 219 2017 2037
Statistics updated 5/22/2018
Fiscal YearStreets Division Equipment
10-Year Replacement Budget
Grand Island Study Session - 7/17/2018 Page 59 / 64
Page 2 of 3
2018 -2019 -2020 -2021 -2022 -2023 -2024 -2025 -2026 -2027 -
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028Statistics updated 5/22/2018
Fiscal YearStreets Division Equipment
10-Year Replacement Budget
Dump Truck 25-35K Budget Total for Class - 100,000 105,000 - - 110,000 - 115,000 - 120,000
Description Unit Year
Replacement
Year Notes
Dump Truck 10 CY 221 2001 2016 100,000
Dump Truck 10 CY 228 2001 2016 105,000
Dump Truck 10 CY 229 2003 2018 110,000
Dump Truck 10 CY 223 2006 2021 115,000
Dump Truck 10 CY 222 2008 2023 120,000
Dump Truck 10 CY 224 2008 2023
Dump Truck 10 CY 225 2010 2025
Dump Truck 10 CY 217 2013 2028
Street Sweeper Budget Total for Class 195,000 - - 210,000 - - 225,000 - - 235,000
Description Unit Year
Replacement
Year Notes
Street Sweeper 243 2000 2010 195,000
Street Sweeper 246 2003 2013 210,000
Street Sweeper 244 2009 2019 225,000
Street Sweeper 242 2015 2025 235,000
Loader/Backhoe Budget Total for Class 190,000 - 200,000 - 215,000 - - 150,000 - -
Description Unit Year
Replacement
Year Notes
FE Loader 236 2005 2015 190,000
FE Loader 235 2011 2021 200,000
FE Loader 238 2014 2024 215,000
Backhoe 248 2016 2026 150,000
Motor Grader Budget Total for Class 45,723 270,723 45,723 - - 250,000 - - 275,000 -
Description Unit Year
Replacement
Year Notes
Motor Grader 230 1975 1995 225,000
Motor Grader 232 1980 2000 250,000
Motor Grader 231 2002 2022 275,000
Motor Grader 234 2016 2036 45,723 45,723 45,723
Skid Steer Budget Total for Class 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000
Description Unit Year
Replacement
Year Notes
T595, Tracks 233 2018 Each Annual Buyback Program 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000
T650, Tracks 237 2018 Each Annual Buyback Program 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
Grand Island Study Session - 7/17/2018 Page 60 / 64
Page 3 of 3
2018 -2019 -2020 -2021 -2022 -2023 -2024 -2025 -2026 -2027 -
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028Statistics updated 5/22/2018
Fiscal YearStreets Division Equipment
10-Year Replacement Budget
Farm Tractor 8 years Budget Total for Class 42,266 42,266 42,266 45,000 - 30,000 45,000 45,000 45,000 45,000
Description Unit Year
Replacement
Year Notes
NH T6-155 249 1999 2007 45,000
NH T6-155 245 2017 2025 14,089 14,089 14,089 10,000 15,000 15,000 15,000 15,000
JD 5210 247 2017 2025 14,089 14,089 14,089 10,000 15,000 15,000 15,000 15,000
NH T6-155 251 2017 2025 14,089 14,089 14,089 10,000 15,000 15,000 15,000 15,000
Stand Alone > $200,000 varies Budget Total for Class 10,000 40,000 40,000 40,000 190,000 40,000 10,000 42,000 42,000 42,000
Description Unit Year
Replacement
Year Notes
Vactor 241 2014 2019 replace every 5 to 6 years 10,000 40,000 40,000 40,000 40,000 40,000 10,000 42,000 42,000 42,000
Gradeall 239 1991 2022 need to purchased used 150,000
Stand Alone < $200,000 Budget Total for Class 25,000 20,000 30,000 35,000 35,000 25,000 160,000 35,000 20,000 20,000
Description Unit Year
Replacement
Year Notes
Bart Mill 259 1997 2012 125,000
Snow Heaver 291 1998 2013 10,000 20,000 20,000 20,000 20,000
Air Compressor 262 2000 2015
Forklift 286 2001 2016
Air Compressor 260 2004 2019
Dynapac CC122 253 2005 2020
GrindLazer 480 264 2013 2028
Snow Heaver 290 2013 2028 10,000 20,000 20,000 20,000 20,000
Asphalt Zipper 240 2013 2028 10,000 15,000 15,000 15,000 15,000 15,000
Air Compressor 263 2016 2031
Crack Seal Machine 255 2016 2031
Mastic Machine 258 2016 2031
Dynapac CC1300 254 2017 2032
Other, Attachments snow plows, vee plows, snow gates, mower decks, etc.15,000 15,000 15,000 15,000 15,000
653,989 628,989 518,989 635,000 516,000 606,000 586,000 557,000 548,000 636,000 Streets Equipment Budget Total
Grand Island Study Session - 7/17/2018 Page 61 / 64
Grand IslandStudy Session - 7/17/2018Page 62 / 64
City of Grand Island
Tuesday, July 17, 2018
Study Session
Item -4
Discussion on 400 Fund
Staff Contact: John Collins
Grand Island Study Session - 7/17/2018 Page 63 / 64
City of Grand Island
Tuesday, July 17, 2018
Study Session
Item -5
General Fund Revenue and Expense Update
Staff Contact: Marlan Ferguson, William Clingman
Grand Island Study Session - 7/17/2018 Page 64 / 64