Loading...
12/19/2023 Resolutions 2023-323R E S O L U T I O N 2023-323 WHEREAS, at the December 14, 2021, Council meeting, UCC Environmental was awarded the contact for the PGS Bottom Ash System Upgrade in the amount of $1,980,700.00; and WHEREAS, at the January 24, 2023, meeting, Council approved Change Order # 1 in the amount of $2,163,776.00 for construction and erection installation costs that could not be set initially due to the construction market volatility; and WHEREAS, during the inspection of the pumps, additional repairs were discovered to restore pump integrity for a total of $140,264.00; and WHEREAS, during the installation phase, minor modifications, including moving a conflicting air line, pouring a sidewalk and changes in conductor cabling and terminations, are required to accommodate existing plant utilities and standards for a total of $9,212.77; and WHEREAS, a reserve supply of chemicals is recommended to ensure reliable operation of the water treatment system for a total of $29,224.59; and WHEREAS, the addition to the work scope will result in an additional $178,701.36 for a final contract cost of $4,323,177.36. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #2 with UCC Environmental, in the total amount of $178,701.36, is approved, and the Mayor is hereby authorized to sign the Change Order on behalf of the City of Grand Island. Adopted by the City Council of the City of Grand Island, Nebraska, December 19, 2023. �.�/ • ��-eJ er G. Steele, Mayor Attest: l� `Lt�....Lr-� Ji Granere, City Clerk