Loading...
08/22/2023 Resolutions 2023-203R E S O L U T I O N 2023-203 WHEREAS, on October 12, 2021, via Resolution No.2021-269, the City of Grand Island awarded Elsbury Construction, LLC of Grand Island, Nebraska the bid in the amount of $2,655,803.05 for North Road- Old Potash Highway to 13th Street Roadway Improvements; Project No. 2019-P-6; and WHEREAS, on October 11, 2022, via Resolution No. 2022-288, City Council approved Change Order No. 1 in the amount of $152,812.81 to address raising of storm sewer, lowering of existing water main, removal of underground storm sewer structure, construction of new outfall pipe for Sweetwood detention cell, crushed rock base material for special junction box, and relocation of curb stop water boxes; and WHEREAS, it has been determined that further modifications are necessary to complete such project; and WHEREAS, such modifications have been incorporated into Change Order No. 2; and WHEREAS, the cost associated with such change order is $107,449.78, resulting in a revised contract amount of $2,916,065.64. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that the Mayor be, and hereby is, authorized and directed to execute Change Order No. 2, at a cost of $107,449.78 between the City of Grand Island and Elsbury Construction, LLC of Grand Island, Nebraska to provide the modifications. Adopted by the City Council of the City of Grand Island, Nebraska, August 22, 2023. �?.�/ . Ro G. Steele, Mayor Attest: �G J Granere, Deputy City Clerk