Loading...
09/13/2022 Resolutions 2022-245R E S O L U T I O N 2022-245 WHEREAS, there are six (6) total raw sewage pumps located in the Headworks building at the Wastewater Treatment Plant, which are used to pump incoming sewage for treatment; and WHEREAS, the pumps are in two (2) redundant wet wells, with each designed to handle the normal daily influent flow while allowing maintenance to be done on the pumps and ancillary equipment in one (1) wet well at a time; and WHEREAS, due to a large piece of debris going through the pump station one of the raw sewage pumps was damaged beyond repair, thus a replacement is necessary; and WHEREAS, the replacement pump is needed to keep the redundancy of the pump station in place and to maintain capacity for wet weather events at design levels; and WHEREAS, Iowa Pump Works of Ankeny, Iowa has a factory refurbished pump on hand for quick placement at the Wastewater Treatment Plant; and WHERES, Iowa Pump Works does have the secured sales territory for Grand Island; ` � � and WHEREAS, the Wastewater Treatment Plant is seeking approval to purchase the refurbished pump from Iowa Pump Works of Ankeny, Iowa in the total amount of $40,400.00 ($400.00 is to cover shipping & handling). NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that the purchase of the above noted pump, in the total amount of $40,400.00 from Iowa Pump Works of Ankeny, Iowa is hereby approved. BE IT FURTHER RESOLVED, that Iowa Pump Works is hereby designated as the sole source provider for the raw sewage pumps at the Wastewater Treatment Plant. Adopted by the City Council of the City of Grand Island, Nebraska, September 13, 2022. Attest: Roger Steele, Mayor ��� � RaNae Edwards, City Clerk Approved as to Form tt September 12, 2022 tt City Attorney