Loading...
07/26/2022 Resolutions 2022-188� L__J RESOLUTION 2022-188 WHEREAS, on November 9, 2021, via Resolution No.2021-321, the City of Grand Island awarded S.J. Louis Construction, Inc. of Rockville, Minnesota the bid in the amount of $6,130,000.00 for the Central Nebraska Regional Airport Sanitary Sewer Collection System Rehabilitation; Project No. 2017-5-4; and WHEREAS, On May 24, 2022, via Resolution No. 2022-139 City Council approved Change Order No. 1 to address the need for additional 10" PVC sanitary sewer pipe to make future expansion less disruptive and not as close to the proposed lift station, the addition of several manholes due to a condition in the field that was not discovered during design, and the option of using high early concrete pavement repair that would allow the pavement to be driven on sooner; and WHEREAS, the cost associated with Change Order No. 1 was a total of $64,994.50, resulting in a revised contract amount of $6,194,994.50; and WHEREAS, it has been determined that modifications are necessary to complete such proj ect; and WHEREAS, such modifications have been incorporated into Change Order No. 2; ..�1 WHEREAS, the cost associated with such change order is $133,907.22, resulting in a revised contract amount of $6,328,901.72. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that the Mayor be, and hereby is, authorized and directed to execute Change Order No. 2, at a cost of $133,907.22 between the City of Grand Island and S.J. Louis Construction, Inc. of Rockville, Minnesota to provide the modifications. Adopted by the City Council of the City of Grand Island, Nebraska, July 26, 2022. Roger . Steele, Mayor Attest: ������� RaNae Edwards, City Clerk Approved as to Form tt July25,2022 tt CityAttorney