02/09/2021 Resolutions 2021-23RESOLUTION 2021-23
WHEREAS, turbine generator boiler inspections are done during the fall outage at
Platte Generating Station; and
WHEREAS, to conduct the maintenance on the boiler and maintenance on other areas
of the plant, scaffolding was erected to reach and repair these areas safely; and
WHEREAS, specifications were issued for bids and the contract was awarded by
Council on September 8, 2020, to HTH Companies, of Union, Missouri, in the amount of $61,460.00
per Resolution 2020-208; and
WHEREAS, during the outage, additional work was required above the base hours for
scaffolding in the turbine intercept valve, turbine exhaust, and precipitator; and
WHEREAS, the additional work was completed in accordance with the contract time
and materials and these additions and modifications to the work scope resulted in an addition of
$42,762.32 for a final contract cost of $104,222.32.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF
THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #1 for Boiler Scaffolding is
approved, and the Mayor is hereby authorized to sign the Change Order on behalf of the City of
Grand Island.
Adopted by the City Council of the City of Grand Island, Nebraska, February 9, 2021.