Loading...
12/22/2020 Resolutions 2020-339RESOLUTION 2020-339 WHEREAS, an inspection and overhaul of the turbine valves at Platte Generating Station is performed every three years; and the overhaul was completed during the fall outage in October of this year; and WHEREAS, during this inspection, the turbine valves were completely disassembled, and all components were cleaned, inspected, repaired or replaced; and WHEREAS, the contract for the Turbine Valve Overhaul — Fa112020 was awarded to General Electric Steam Power, Inc., from Midlothian, Virginia, in the amount of $221,000.00 at the July 28, 2020 Council meeting; and WHEREAS, during the inspection, additional work was required above the base hours to make repairs to replace the main stop valve pressure seal head bushing and five control valve lower bushings; and WHEREAS, the additional work was completed in accordance with the contracted time and materials for an addition to the scope of work in the amount of $135,862.22, for a final contract cost of $356,862.22. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #1 with General Electric Steam Power, Inc., of Midlothian, Virginia, in the amount of $135,862.22 is hereby approved, and the Mayor is authorized to sign the Change Order on behalf of the City of Grand Island. Adopted by the City Council of the City of Grand Island, Nebraska, December 22, 2020. � � n Ro G. Steele, Mayor Attest: ������� RaNae Edwards, City Clerk Approved as to Form tt December21,2020 tt CityAttorney