08/11/2020 Resolutions 2020-184RESOLUTION 2020-184
WHEREAS, the U. S. Environmental Protection Agency's Rule for the regulation and
management of Coal Combustion Residua.l (CCR) under the Resource Conservation and Recovery
Act (RCRA) became effective on October 19, 2015; and
WHEREAS, personal at the Platte Generating Station reviewed the regulations and
determined consulting services were needed to meet the CCR Rule Compliance schedule, and HDR
Engineering was hired as the sole source to ensure timeliness, high quality and consistency among
other electric utilities and independent power producers in Nebraska; and
WHEREAS, on September 27, 2016 Council approved HDR Engineering to complete
task 1-4 to include ground water sampling, review of the Ash Landfill Closure Plan, Post-closure
Plan, and Run-on/run-off Control System Plan for a cost not to exceed $86,290.00
WHEREAS, on September 24, 2019 Council approved HDR Engineering to complete
Tasks #5-9 to a11ow compliance with the CCR Rule in an amount not to exceed $189,960.00; and
WHEREAS, on October 8, 2019, Council approved HDR Engineering to complete
Task 10 to include preparation for the Title 132 Permit Renewal Application and amend the CCR
Run-On and Run-Off Control System Plant at a cost not to exceed $39,970.00; and Task 11 for the
CCR 2019 Annual Landfill Inspection and Fugitive Dust Control Reporting for a cost not to exceed
$12,990.00; and
WHEREAS, on November 26, 2019, Council approved HDR Engineering to
completed Task 12, upgradient Well MW-11, for a cost not to exceed $16,660.00; and
WHEREAS, to ensure continued preparation and to address and respond to NDEE
regarding the Title 132 Permit Renewal Application revisions and amend the CCR Run-on and Run-
off Control System, Task 10-300, it is recornmended that HDR Engineering continue with these
tasks. Task 10-300 is being presented for a cost not to exceed $14,860.00.
WHEREAS, on March 10, 2020, Councii approved Task 13 for the CCR
Groundwater Monitoring and Reporting which included semi-annual Groundwater Sampling for the
first and second half of 2020, and the 2020 Spring and Fa11 Groundwater Reports for a cost not to
exceed $47,100.00.
WHEREAS, on June 23, 2020, Council approved HDR Engineering to complete Task
14 for the Site Investigation Services for the detection of contaminants at an increased level for a
cost not to exceed $25,900.00.
WHEREAS, Task 15 is being presented for the CCR Groundwater Services —NDEE
Meeting and Corrective Action for the NDEE Meeting and Corrective Action and Monitoring Plan
following the ACM report at a cost not to exceed $35,600.00
WHEREAS, the ensure the same high quality and consi
Approved as to Fortn II
August 10, 2020 � City Attomey
the CCR Rule 257.95(g) and NDEE Title 132, it is recommended that HDR Engineering continue
with Task 15 for the CCR Groundwater Services — NDEE Meeting and Corrective Action for the
NDEE Meeting and Corrective Action and Monitoring Plan following the ACM report, for a cost not
to exceed $35,600.00.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF
THE CITY OF GRAND ISLAND, NEBRASI�A, that HDR Engineering is authorized to continue
with Task 15 associated with the CCR Rule and NDEE Title 132 in an amount not to exceed
$35,600.00.
Adopted by the City Council of the City of Grand Island, Nebraska, August 1 l, 2020.
�.� ���