08/27/2019 Resolutions 2019-252RESOLUTION 2019-252 WHEREAS, at the Marc�i 26, 2019 meeting, Council awarded the contract far Water Main Project 2018-W-8 at the intersection of Riverside Drive and Holcomb Street to the Diamond Engineering Company of Grand Island, Nebraska, in the amount of $79,171.20; and WHEREAS, additional items were required to complete the project due to encountering groundwater, and dewatering was required for seven days; and WHEREAS, a storm sewer manhole construction differed from that of record, and a portion of storm sewer need to be replaced with 12" C900 pipe instead of the planned 15" RCP, making the total cost for the addition items $11,696.00; and WHEREAS, additional pavement removal and replacement was required for the dewatering well installation, additional sidewalk removal, and replacement for proper ADA configuration amount to $511.19; and WHEREAS, the original contract was for $79,171.20 and the changes to the contract amounted to an additional $12,207.19, for a total contract amount of $91,378.39. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #1 to the contract for Water Main Project 2018-W-8 is approved, and the Mayor is hereby authorized to sign the Change Order on behalf of the City of Grand Island. Adopted by the City Council of the City of Grand Island, Nebraska, August 27, 2019. Attest: � �1� .��� RaNae Edwards, City Clerk I �._ G'.-C Roger G. Steele, Mayor Approved as to Form tt August 26, 2019 A City Attorney