Loading...
07/23/2019 Resolutions 2019-218RESOLUTION 2019-218 WHEREAS, at the October 23, 2018 meeting, Council awarded the contract for Fuel Oil Pip and Tank Cleaning to J& L Pipeline Services Inc., of Tipton, Iowa, in the amount of $177,551.36; and WHEREAS, fuel oil piping from the building connection to the recirculation heating skids inside the building was required to be drained to complete the project; and WHEREAS, this work was beyond the original base scope of work and J& L Pipeline Services, Inc., had all the manpower and equipment on-site to perform the additional work without the extra cost of mobilization and demobilization; and WHEREAS, J& L Pipeline performed the additional work at the standard rates in the original contract at an additional cost of $29,384.24, for a total cost of $206,935.60. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #1 in the amount of $29,384.24 for the Fuel Oil Pipe and Tank Cleaning at Burdick Generating Station, is approved and the Mayor is hereby authorized to sign the Change Order on behalf of the City of Grand Island. Adopted by the City Council of the Ciry of Grand Island, Nebraska, July 23, 2019. Attest: Ra, 1 e.� �. RaNae Edwards, City Clerk `=� Roger G. Steele, Mayor Approved as to Form tt July 22, 2019 tt ty9 orney