01/08/2019 Resolutions 2019-16RESOLUTION 2019-16 WHEREAS, Water Main Project 2018-W-3 installed approximately 1,7401inear feet of new City water main within Golden Age Subdivision to provide increased capacity and fire protection for the area; and WHEREAS, the original contract was awarded by City Council on February 13, 2018, in the amount of $199,795.07 to Van Kirk Brothers Contracting of Sutton, Nebraska; and WHEREAS, additional items were required to complete the project due to rubble encountered when excavating, utility sizes differing from sizes of record, and poor condition of existing infrastructure and the cost of this work is $2,661.00; and WHEREAS, during the process of constructing the water main, materials were added or deducted to complete the project and a significant portion of the quantity overage was due to additional pavement and sidewalk repair for replacing deteriorating existing hard surfacing. This total is $7,555.43 for a total cost change of $10,216.43. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order # 1 in the amount of $10,216.43, for the construction of Water Main Project 2018-W-3 is approved and the Mayor is hereby authorized to sign the Change Order on behalf of the City of Grand Island. Adopted by the City Council of the City of Grand Island, Nebraska, January 8, 2019. Attest: ��n����� RaNae Edwards, Ciry Clerk �. Roger G. Steele, Mayor Approved as to Form � January 7, 2019 R ity torney