Loading...
08/14/2018 Resolutions 2018-232RESOLUTION 2018-232 WHEREAS, at the March 14, 2017 meeting, Council awarded the contract for construction of the Composite Elevated Water Storage Tank, to Landmark Structures of Fort Worth, Texas, in the amount of $3,454,200.00; and WHEREAS, on October 24, 2017, Council approved Change Order #1 to facilitate the design of and the addition of a pump to move out any remaining water in the tank without flooding a future housing development in the amount of $102,255.00; and WHEREAS, during the design phase, the original design was to have manual valves on the inlet and outlet of the water tower and it was determined that the water tower will need remote isolation valves to control flow into and out of the tower by the operator; and WHEREAS, the 20" valve actuators, additions to the SCADA system, electrical wiring, engineering and installation cost is $36,640.98; and WHEREAS, as a result of these changes, Change Order #2 was prepared for $36,640.98 for a total contract amount of $3,593,095.98. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #2 for the construction of the Composite Elevated Water Storage Tank, is hereby approved and the Mayor is hereby authorized to sign Change Order #2 on behalf of the City of Grand Island. Adopted by the City Council of the City of Grand Island, Nebraska, August 14, 2018. Attest: �.�0.2 r ��� i� RaNae Edwards, City Clerk �� ��I �I�. �L� � - �r: - . , Approved as to Form tt August 13, 2018 Ci ttorney