08/14/2018 Resolutions 2018-232RESOLUTION 2018-232
WHEREAS, at the March 14, 2017 meeting, Council awarded the contract for
construction of the Composite Elevated Water Storage Tank, to Landmark Structures of Fort Worth,
Texas, in the amount of $3,454,200.00; and
WHEREAS, on October 24, 2017, Council approved Change Order #1 to facilitate
the design of and the addition of a pump to move out any remaining water in the tank without
flooding a future housing development in the amount of $102,255.00; and
WHEREAS, during the design phase, the original design was to have manual valves
on the inlet and outlet of the water tower and it was determined that the water tower will need remote
isolation valves to control flow into and out of the tower by the operator; and
WHEREAS, the 20" valve actuators, additions to the SCADA system, electrical
wiring, engineering and installation cost is $36,640.98; and
WHEREAS, as a result of these changes, Change Order #2 was prepared for
$36,640.98 for a total contract amount of $3,593,095.98.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF
THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #2 for the construction of the
Composite Elevated Water Storage Tank, is hereby approved and the Mayor is hereby authorized to
sign Change Order #2 on behalf of the City of Grand Island.
Adopted by the City Council of the City of Grand Island, Nebraska, August 14, 2018.