06/26/2018 Resolutions 2018-182i
RESOLUTION 2018-182
WHEREAS, at the February 27, 2018 Council meeting, Council awarded the contract
for Gas Turbine #3 Modified Hot Gas Path Inspection at Burdick Station to General Electric
International, Inc., of Omaha, Nebraska, in the amount of $494,261.00; and
WHEREAS, during the Hot Gas Path Inspection, a review of the Technical
Information Letters (TILs) for the unit was conducted and it was discovered that several additional
issues needed to be completed while the Hot Gas Path Inspection was being done; and
WHEREAS, several of the TILs required a specialist to inspect the turbine buckets
and compressor blades and the labor rates to do additional work were included in the original
contract and a firm time was established to complete the inspections and priced at an additional cost
of $23,600.00 (Change Order #1); and
WHEREAS, as a result of the inspection, it was found that all of the parts ordered
were not needed, which resulted in a reduction to the cost of the parts in the amount $40,731.17; and
WHEREAS, during the inspection it was found that the shims on the stator vanes
could come loose, and additional labor would be required to pin the shims to the base of the vanes,
resulting in an addition of $38,400.00 to the contract; and
WHEREAS; when the fuel nozzles and combustion liners were removed, an
inspection of the primary fuel nozzles and combustion liners and the refurbishment of the secondary
fuel nozzles was needed, for an additional cost of $20,650.00; and
WHEREAS; the original contract has requested the recommended repair of the
turbine support leg cooling jacket after inspection. The inspection was completed, and removal and
weld repair were recommended. The addition work to make this repair was $8,960.00; and
WHEREAS; Change Order #2 was prepared for an additional cost of $27,278.83; and
WHEREAS; Change Order # 1 in the amount of $23,600; and Change Order #2 in the
amount of $27,278.83 were prepared for an additional cost of $50,878.83, resulting in a final
contract amount of $545,139.83.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF
THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #1 in the amount of $23,600.00
and Change Order #2 in the amount of $27,278.83, for the Gas Turbine #3 Modiiied Hot Gas Path
Inspection at Burdick Station are approved, and the Mayor is hereby authorized to sign the Change
Order on behalf of the City of Grand Island.
Approved as to Form tt
June 22, 201 S i ttorney
Adopted by the City Council of the City of Grand Island, Nebraska, June 26, 2018.