06/26/2018 Resolutions 2018-182i RESOLUTION 2018-182 WHEREAS, at the February 27, 2018 Council meeting, Council awarded the contract for Gas Turbine #3 Modified Hot Gas Path Inspection at Burdick Station to General Electric International, Inc., of Omaha, Nebraska, in the amount of $494,261.00; and WHEREAS, during the Hot Gas Path Inspection, a review of the Technical Information Letters (TILs) for the unit was conducted and it was discovered that several additional issues needed to be completed while the Hot Gas Path Inspection was being done; and WHEREAS, several of the TILs required a specialist to inspect the turbine buckets and compressor blades and the labor rates to do additional work were included in the original contract and a firm time was established to complete the inspections and priced at an additional cost of $23,600.00 (Change Order #1); and WHEREAS, as a result of the inspection, it was found that all of the parts ordered were not needed, which resulted in a reduction to the cost of the parts in the amount $40,731.17; and WHEREAS, during the inspection it was found that the shims on the stator vanes could come loose, and additional labor would be required to pin the shims to the base of the vanes, resulting in an addition of $38,400.00 to the contract; and WHEREAS; when the fuel nozzles and combustion liners were removed, an inspection of the primary fuel nozzles and combustion liners and the refurbishment of the secondary fuel nozzles was needed, for an additional cost of $20,650.00; and WHEREAS; the original contract has requested the recommended repair of the turbine support leg cooling jacket after inspection. The inspection was completed, and removal and weld repair were recommended. The addition work to make this repair was $8,960.00; and WHEREAS; Change Order #2 was prepared for an additional cost of $27,278.83; and WHEREAS; Change Order # 1 in the amount of $23,600; and Change Order #2 in the amount of $27,278.83 were prepared for an additional cost of $50,878.83, resulting in a final contract amount of $545,139.83. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #1 in the amount of $23,600.00 and Change Order #2 in the amount of $27,278.83, for the Gas Turbine #3 Modiiied Hot Gas Path Inspection at Burdick Station are approved, and the Mayor is hereby authorized to sign the Change Order on behalf of the City of Grand Island. Approved as to Form tt June 22, 201 S i ttorney Adopted by the City Council of the City of Grand Island, Nebraska, June 26, 2018. er y L e e, ayor Attest: �?�1����., RaNae Edwards, City Clerk -2-