Loading...
10/24/2017 Resolutions 2017-297RESOLUTION 2017-297 WHEREAS, at the March 14, 2017 meeting, Council awarded the contract for construction of the Composite Elevated Water Storage Tank, to Landmark Structures of Fort Worth, Texas, in the amount of $3,454,200.00; and WHEREAS, during the design phase, an investigation of the surrounding area found that there would not be enough drainage to facilitate draining the tank for inspection without flooding a future housing development; and WHEREAS, to address this issue, a pump was designed to pump the remaining water from the elevated storage into the water system; and WHEREAS, as a result of these design changes, Change Order # 1 was prepared for $102,255.00 for a total contract amount of $3,556,455.00. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #1 for the construction of the Composite Elevated Water Storage Tank, is hereby approved and the Mayor is hereby authorized to sign Change Order #1 on behalf of the City of Grand Island. Adopted by the City Council of the City of Grand Island, Nebraska, October 24, 2017. Attest: ��� ���-�-�. RaNae Edwards, City Clerk I , I` � 1 �... ..�./. .�.� � -i�- - �,-.� �. � ,�`� �� Approved as to Form � ' October 23, 2017 n ity rney i