Loading...
05/26/2015 Resolutions 2015-134 -- RESOLUTION 2015-134 WHEREAS,Kiewit Power Engineers of Lenexa,Kansas was awarded the contract for Air Quality Control System Engineering Services at Platte Generating Station,at the March 26,2012 City Council meeting per Resolution#2012-78; and WHEREAS, in June 26, 2012,per Resolution 2012-159 Council approved Change Order#1 after review and determination that a Dry Scrubber System Design would be needed; and WHEREAS, on January 8, 2013, Council awarded the bid for Mercury Air Toxic Standards Compliance Retrofit Project to AMEC, of Tucker, Georgia; and WHEREAS, to assist with negotiations of the contract for the Mercury Air Toxic Standards Compliance Retrofit Project with AMEC,and as a result of this additional time, contract Change Order#2 for an additional$14,502.00 was required for a total contract cost of$446,534.00; and WHEREAS,during construction,additional services were required to review changes for 5kV switchgear and scaling issues that occurred during start-up operations, and Kiewit Engineering reviewed documentation to ensure all technical specifications were met to ensure compliance with the original contract. NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #3 with Kiewit Power Engineers of Lenexa, Kansas, resulting in an additional cost of$27,865.00 ,for a final contract price of$474,399.00, is hereby approved. Adopted by the City Council of the City of Grand Island,Nebraska, May 26, 2015. A Je Vii':y L. ens. Mayor Attest: RaNae Edwards, City Clerk Approved as to Form • , v)' May 26,2015 0 Cit O rney