05/26/2015 Resolutions 2015-134 -- RESOLUTION 2015-134
WHEREAS,Kiewit Power Engineers of Lenexa,Kansas was awarded the contract for
Air Quality Control System Engineering Services at Platte Generating Station,at the March 26,2012
City Council meeting per Resolution#2012-78; and
WHEREAS, in June 26, 2012,per Resolution 2012-159 Council approved Change
Order#1 after review and determination that a Dry Scrubber System Design would be needed; and
WHEREAS, on January 8, 2013, Council awarded the bid for Mercury Air Toxic
Standards Compliance Retrofit Project to AMEC, of Tucker, Georgia; and
WHEREAS, to assist with negotiations of the contract for the Mercury Air Toxic
Standards Compliance Retrofit Project with AMEC,and as a result of this additional time, contract
Change Order#2 for an additional$14,502.00 was required for a total contract cost of$446,534.00;
and
WHEREAS,during construction,additional services were required to review changes
for 5kV switchgear and scaling issues that occurred during start-up operations, and Kiewit
Engineering reviewed documentation to ensure all technical specifications were met to ensure
compliance with the original contract.
NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND COUNCIL OF
THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #3 with Kiewit Power
Engineers of Lenexa, Kansas, resulting in an additional cost of$27,865.00 ,for a final contract price
of$474,399.00, is hereby approved.
Adopted by the City Council of the City of Grand Island,Nebraska, May 26, 2015.
A
Je Vii':y L. ens. Mayor
Attest:
RaNae Edwards, City Clerk
Approved as to Form • , v)'
May 26,2015 0 Cit O rney