Loading...
06/26/2012 Resolutions 2012-159 __ RESOLUTION 2012-159 WHEREAS,Kiewit Power Engineers of Lenexa,Kansas was awarded the contract for Air Quality Control System Engineering Services at Platte Generating Station,at the March 26,2012 City Council meeting; and WHEREAS,Kiewit Power Engineers has completed the task of technology screening and determined the system required to meet the required emission reduction levels required by EPA; a dry scrubber, carbon injection system, and a fabric filter; and WHEAREAS,because it was deteiinined that a dry scrubber system design would be needed, Change Order #1 was prepared for a contract adjustment of an additional $82,992.00, resulting in a final contract amount of$432,032.00. This not-to-exceed amount was included in the original contract (depending on which system would be needed at the power plant). NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order #1 with Kiewit Power Engineers of Lenexa,Kansas,resulting in an additional cost of$82,992.00,for a final contract price of$432,032.00, is hereby approved. Adopted by the City Council of the City of Grand Island, Nebraska, June 26, 2012. 7 Imo[ e . ay avric , Mayor Attest: Ilk RaNae Edwards, City Clerk Approved as to Form Q ;,, ; June 25,2012 0 Cd 67 orney