09/13/2011 Resolutions 2011-243RESOLUTION 2011 -243 WHEREAS, on June 28, 2011 by resolution 2011 -155 authorized Black & Veatch Corporation of Kanas City, Missouri to prepare engineered construction documents based on recommendation outlined in a technical memorandum titled "Screw Pump Replacement Evaluation ", by resolution WHEREAS, on June 28, 2011 by resolution 2011 -155 further authorized City staff to negotiate contractual change in work with the contracting firm Oakview dck Construction; and WHEREAS, on August 31, 2011 city staff and engineer Black & Veatch have negotiated a unit cost Change Order No. 2 with Oakview dck, LLC of Red Oak, Iowa at $397,897.00; and WHEREAS, engineer Black & Veatch has reviewed the unit cost for additional Rehabilitation of pumps (Base Work Items), Replace Lower Bearings (Alternative Work Item, and Re -Coat Screws) (Alternative Work Item) as fair and reasonable; and WHEREAS, uncertainty in the structural welds of the screw pumps until coating system removal; and WHEREAS, such change order shall provide for Rehabilitation of Pumps, Replace Lower Bearings, and Re -Coat Screws; and WHEREAS, after Change Order No. 2, the revised contract is $3,974,149.00; and NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that Change Order No. 2 with the contracting firm, Oakview dck, LLC of Red Oak, Iowa, in the amount of $397,897.00 for WWTP- 2010 -3 Aeration Basin Improvements project at the Wastewater Treatment Plant is hereby approved. BE IT FURTHER RESOLVED, that the Mayor is hereby authorized and directed to execute such contract on behalf of the City of Grand Island. Adopted by the City Council of the City of Grand Island, Nebraska, September 13, 2011. Attest: RaNae Edwards, City Clerk Approved as to Form A September 13, 2011 0 City Attomey