Loading...
08/28/2007 Ordinances 9133ORDINANCE NO. 9133 An ordinance to amend the Grand Island City Code; Sections 15-55, 15-57, 15- 60, 15-63 and 15-74, pertaining to electric utility rates; to repeal Sections 15-55, 15-57, 15-60, 15-63 and 15-74, as now existing, and any ordinance or parts of ordinances in conflict herewith; and to provide for publication and the effective date of this ordinance. BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA: SECTION 1. Section 15-55 of the Grand Island City Code is hereby amended to read as follows: §15-55. 010 Residential Service Applicable in urban and rural distribution areas. Available at single phase, through a single meter, to residential consumers for domestic use in asingle-family dwelling unit; but is not available for commercial or non- domestic use. Individual single-phase motors, not to exceed 10 HP each, may be connected; however, the City Utilities Department must be notified in writing, if a motor over 5 HP is installed. This schedule has two sets of rates: one for the summer period of five months, beginning with the June billing; and the second for the winter season of seven months, beginning with the November billing. Summer Rate Beginning October 1, 2007 Kilowatt-Hours Used Per Month (June -October) First 300 KWH .............................................. $0.085 per KWH Next 700 KWH ............................................. $0.060 per KWH All additional KWH ........................................ $0.067 per KWH Plus a customer charge of $5.00 per month, in addition to that charged for the electrical energy used, plus the applicable Power Cost Adjustment charge. The minimum monthly bill shall be $5.00 prior to the Power Cost Adjustment. Winter Rate Beginning October 1, 2007 Kilowatt-Hours Used Per Month (November -May) First 300 KWH .............................................. $0.085 per KWH Next 700 KWH ............................................. $0.060 per KWH Additional KWH ............................................ $0.039 per KWH Plus a customer charge of $5.00 per month, in addition to that charged for the electrical energy used, plus the applicable Power Cost Adjustment charge. The minimum monthly bill shall be $5.00 prior to the Power Cost Adjustment. SECTION 2. Section 15-57 of the Grand Island City Code is hereby amended to read as follows: Approved as to Form c August 27, 2007 ~ City Attorney ORDINANCE NO. 9133 (Cont.) §15-57. 030 Single-Phase Commercial Service Applicable in urban and rural distribution areas. Available for commercial customers, for lighting and small appliances. Available for single meter apartment units, and combined residential-commercial use, where the Residential Rate is not applicable. Service shall be through a single meter. Individual single-phase motors, not to exceed 10 HP each, may be connected; however, the City Utilities Department must be notified in writing, if a motor over 5 HP is installed. Kilowatt-Hours Used Per Month Rates Beginning October 1, 2007 First 350 KWH ........................................... $0.090 per KWH Next 650 KWH ........................................... $0.080 per KWH Next 1,500 KWH ......................................... $0.074 per KWH Next 2,500 KWH ......................................... $0.070 per KWH Next 5,000 KWH ......................................... $0.064 per KWH Over 10,000 KWH ....................................... _ $0.061 per KWH Plus a customer chazge of $7.00 per month, in addition to that chazged for the electrical energy used, plus the applicable Power Adjustment charge. The minimum monthly bill shall be $7.00 prior to the Power Adjustment. SECTION 3. Section 15-60 of the Grand Island City Code is hereby amended to read as follows: §15-60. 050 Three-Phase Commercial Service Applicable in the territory served by the City of Grand Island; and is available through a single meter at three phase, for any electric service uses where three-phase service is available. This schedule has two sets of rates: one for the summer period of five months, beginning with the June billing; and the second for the winter season of seven months, beginning with the November billing. Summer Rate Beginning October 1, 2007 Kilowatt-Hours Used Per Month (June -October) First 1,000 KWH .............................. $0.087 per KWH Next 1,500 KWH .............................. $0.079 per KWH Next 2,500 KWH .............................. $0.075 per KWH Next 15,000 KWH ............................ $0.069 per KWH Over 20,000 KWH ............................ $0.066 per KWH Plus a customer charge of $10.00 per month, in addition to that charged for the electrical energy used, plus the applicable Power Cost Adjustment charge. Winter Rate Beginning October 1, 2007 Kilowatt-Hours Used Per Month (November -May) First 500 KWH ................................. $0.087 per KWH Next 1,000 KWH .............................. 0.079 per KWH -2- ORDINANCE NO. 9133 (Cont.) Next 2,500 KWH .............................. $0.066 per KWH Over 4,000 KWH .............................. $0.063 per KWH Plus a customer charge of $10.00 per month, in addition to that charged for the electrical energy used, plus the applicable Power Cost Adjustment charge. Minimum The minimum monthly charge shall be no less than $10.00. The minimum shall in no event be less than $0.70 per month per connected horsepower. The billing horsepower shall be determined as follows: 1. Total connected horsepower, if total connected horsepower is less than 20 HP. 2. If total connected horsepower exceeds 20 HP, then the billing horsepower shall be the larger of 20 HP, or the largest single connected motor. 3. If questions arise as to the actual billing horsepower, the City Utilities Department may, at its option, install demand meters. The Kilowatt reading shall determine the billing horsepower on the basis of 0.75 Kilowatt = 1.0 HP. It is the responsibility of the customer, to inform the City Utilities Department of changes that may effect minimum billings. SECTION 4. Section 15-63 of the Grand Island City Code is hereby amended to read as follows: 1 §15-63. 100 Three-Phase Power Service Applicable in the territory served by the City of Grand Island, available through a single meter at three phase. Available for any commercial or industrial use of energy. Beginning October 1, 2007 Demand Charge $8.50 per KW of billing demand Energy Charge $0.0355 per KWH for the first 450 hours of monthly demand $0.0290 per KWH for all additional usage; plus applicable Power Cost Adjustment charge. Customer Charge $300.00 per month. The minimum monthly bill shall be no less than $700. The Power Cost Adjustment charge is applied to energy consumption only. SECTION 5. Section 15-74 of the Grand Island City Code is hereby amended to read as follows: §15-74. Rate 116; Interdepartmental; Streetlights The monthly charge for various size lights used for public street lighting and public parks lighting, whether -3- ORDINANCE NO. 9133 (Cont.) City or privately-owned shall be $0.38 per watt per year billed on a monthly basis beginning October 1, 2007. Power Cost Adjustment is not applicable to the Interdepartmental Streetlights Rate. SECTION 6. Those portions of Sections 15-55; 15-57; 15-60; 15-63 and 15-74 as now existing, and any ordinances or parts of ordinances in conflict herewith be, and hereby are, repealed. SECTION 7. The validity of any section, subsection, sentence, clause, or phrase of this ordinance shall not affect the validity or enforceability of any other section, subsection, sentence, clause, or phrase thereof. SECTION 8. That this ordinance shall be in force and take effect from and after its passage and publication, in pamphlet form, within fifteen days in one issue of the Grand Island Independent as provided by law. Enacted: August 28, 2007. Attest: ~o~.~.r'-~-~~ob) ('~~.c,r- es: d~.~ RaNae Edwards, City Clerk F GRANp~ p ~........~~ S ~~'~~• RPO • ~ r9 V ~• ~,~~0 RglEp :y4 ~Oy® ~f4 10.182 ~.' .• ~ZrBR AS`~R~ 1 -4-