Loading...
02/13/2007 Resolutions 2007-38RESOLUTION 2007-38 ~ WHEREAS, the Regional Planning Commission, after public notice having been published in one issue of the Grand Island Independent, and such notice also having been posted in at least three places in areas where it was likely to attract attention, conducted a public hearing on February 7, 2007, on the One and Six Year Street Improvement Program the City of Grand Island; and WHEREAS, at the February 7, 2007 public hearing, the Regional Planning Commission approved the One and Six Year Street Improvement Program 2007-2012, and recommended that such program be approved by the City Council; and WHEREAS, the Grand Island City Council, after public notice having been published in one issue of the Grand Island Independent, and such notice also having been posted in at least three places in areas where it was likely to attract attention, conducted a publ is hearing on February 13, 2007, on the One and Six Year Street Improvement Program for the City of Grand Island; and WHEREAS, this Council has determined that the One and Six Year Street Improvement Program as set out in Exhibit "A" should be adopted. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF GRAND ISLAND, NEBRASKA, that the One and Six Year Street Improvement Program 2007-2012, based on priorities of needs and calculated to contribute to the orderly development of city streets, and identified as Exhibit "A", is hereby approved and adopted by this Council. Adopted by the City Council of the City of Grand Island, Nebraska, February 13, 2007. Marg et Hornady, Mayor Attest: ~~~ RaNae Edwards, City Clerk Approved as to Form February 12, 2007 ~ City Attorney 2007 CONSTRUCTION SEASON All Costs in $1,000's No. Pro ct Description Total Project State Federal Other City STP City G.O. Bond City Cap. Impr. Fund Street Construction M310- 475 2007 Paving PetiOon Program $200 $200 M310- 500 Widen Capital Avenue -Moores Creek Drainw to Webb Road - Constriction $4,500 $3,375 $1,125 M310- 351 Hwy 30 -Grant to Greenwich - NDOR P ect FY 2007 $3,749 $2,999 $750 M310- 508 WasmerCell Construction $315 $315 M310- 537 Realign Walnut Middle Scholl entrance with 15th St. & install traffic signal $232 $232 M310- 407 S. Locust - HWY 34 to I-80 -Additional Landscaping $60 $48 $12 Street Resurfacfn M310- 476 Annual Resurtacing Program (2007) $450 $450 Drainage 8 Flood Control M310- 461 cores, e, elver reek Flood l:ontrol for Northwest Grand Islarxi - Constnxtbn $780 $530 $250 M310- 512 Detention Cell/D'Rch Restoration $50 $50 Other M310. 389 HlkeBike Trail Const along Fk~odway - Hall County Park to S. Locust $435 $348 $87 M310- 385 Geographic Information System (Continued Development & Maintenance) $25 $25 M310- 513 Misc. Safety Enhancements $50 $50 TOTALS: $10,846 $4,157 $4,125 $200 $2,364 2/9/2007 Page 1 of 6 i 2008 Construction Season All costs in $1,000s No. Pro act Description Total Project State Federal Other City STP City G.O. Bond City Cap. Impr. Fund Street Construction M310. 409 S. Locust Grading and Median Drains for New Lanes $720 $576 $144 M310. 341 S. Locust I-80 to Ffoodway, Surtacing New Lanes $2,750 $2,200 $550 M310- 490 Annual Pavi Petftion Pr ram 2008 $600 $600 M310. Traffic Signal ~ Rea Road/HWY 281 $135 $135 M310. 353 Faldley Ave. -Moores Creek Ditch to North Rd. $1,250 $1,250 M310- 538 Round-a-bout -Capital Ave/North Rd Intersection $360 $360 M310- 267 Two Bridge Replacements -Blaine ~ Wood River (Engineering Design) $45 s45 M310- 458 Traffic Signal - HWY 281/Wildwood Dr. $170 $85 $85 Street ResurFacin M310. 491 Annual Resurtacin P ram 2008 $500 $500 Drai e 8 Flaod Control M310. 493 Concrete Lini of Drain a DRctres 2008 $50 $50 M310. 461 Moores,Prairie, & Silver Creek Flood Control -Construction for Northwest Grand Island $780 $420 $360 M310. 514 Detention CeIVDitch Restoration $50 $50 M310. 485 PVIP Cells & Drama $127 $127 M310. 507 Independence Avenue Drainege(DesigMROW) $80 $80 M310. 382 cores reek rainage -along Road from Rogers Well to S. of Old Potash HWY $209 $209 Other M310. 414 Hike/Bike Trail Construction, S. Locust to Norman Island. (Parallel to I-80) $600 $600 M310. 385 Geographic Information System (Continued develo nt and maintenance $25 $25 M310. 515 Misc. Safety Enhancements $150 $150 M310- 408 Hike/Bike Bridge Superstructure over two Platte River Channels $390 $312 $78 M310- 431 Hike/Bike Trail Construction, S. Locust- Floodway to I-80 $600 $480 $120 TOTALS $9,591 $1,897 $2,776 $1,850 $3,068 2/9/2007 Page 2 of 6 1 r~ 2009 Construction Season All costs in $1,000s No. Project Descri on Total Project State Federal Other City STP City G.O. Bond City Cap. Impr. Fund Street Construction M310- 501 Annual Pavi Petition ram 2009 $750 $750 M310- 540 Intersection Improvements Qa 13th & North Road $300 $300 M310- 528 State SUDlers Ave -Intersection Improvements $390 $390 M310- 535 Realign Barr Mid. School entrance with Riverside Dr & signal Q Stolley/Adams $360 $306 $54 M310- 536 Traffic Signal -Locust St./Fonner Park Heartland Evert Center Center Entrance $150 $150 M310- 487A Stolley Park Rd widening, Locust to Fonner Park Ent. (Eng Design 8 ROW) $150 $150 M310- 539 3rd Street Widening -Adams to Eddy St. ~0 $90 M310- 267 Two Bridge Replacerrrents -Blaine Q Wood River (Construction) $250 $120 $130 Street Resurfacin M310- 503 Annual Resurfaan P ram 2009 $500 $500 Draina e $ Flood Control M310- 505 Concrete Lini of Drain a Ditches 2009 $50 $50 M310- 461 Moores,Prairie, 8 Silver Creek Flood Control -Construction $780 $420 $360 M310- 516 Detention Cell/Dftch Restoration $50 $50 M310- 485 PVIP Cells & Drainage $272 $272 M310- 459 Cortstnict Drainway from CCC area to Wood River $425 $425 M310- 511 Moores Creek Drainage -along North Road from Old Potash HWY to Edna Dr. $150 $150 M310- 507 Ir~eperxience Ave. Drainage (Construction) $350 $350 Other M310- 497 Illuminating Lighting - HWY 281, Stdley to Old Potash $250 $250 M310- 385 Geographic Infonrration System (Continued develo ntent and maintenance $25 $25 M310- 518 Misc. Safety Enhancements $150 $150 M310- 447 Hike/Bike Trail Consinxxion -State St. to Veterans Home $600 $480 $120 TOTALS $6,042 $1,326 $0 $900 $3,818 2/9/2007 Page3of6 1 2010 Construction Season All costs in $1,000s No. Project Description Total Project State Federal Other City STP City G.O. Bond City Cap. Impr. Fund Street Construction M310- 519 Annual Pavi Petition Pr ram 2010) $750 $750 M310- 533 Husker Highway Widening -from 1/4 Mi. west of HWY 281 easterly to Highway 281 $1,200 $900 $300 M310- 480 Independence Avenue Paving - Sharma St. to Manchester Ave. $1,050 $1,050 M310- 334 Widen Eddy Street Underpass to 5-lanes on south end $175 $175 M310- 487 Stolley Park Rd widening, Locust to Former Park Entrance (Construction) $1,200 $1,200 Street Resurfacin M310- 522 Annual Resurtaan Pro ram 2010 $500 $500 Draina e 8 Flood Control M310- 523 Annual Major Drainage Development 2010 $500 $500 M310- 524 Concrete Lini of Drain a Ditches 2010 $50 $50 M310- 461 Moores,Prairie, & Silver Creek Flood Control -Construction $780 $420 $360 M310- 525 Detention Cell/Ditch Restoration $50 $50 Other M310- 385 Geographic Information System (Continued develo nt and maintenance $25 $25 M310- 5_27 Misc. Safety Enhancements $150 $150 M310- 517 Hike/Bike Trail Const. -Veterans Home to E le Scout Park $600 $480 $120 TOTALS: $7,030 $900 $900 $3,000 $2,230 ~i I 2011 Construction Season All costs in $1,()DOs No. Project Description Total Project State Federal Other City STP City G.O. Bond City Cap. Impr. Fund Street Construction M310- 541 Annual Pavi Petition Pr ram 2011 $750 $750 M310- 89 Ca 'tal Ave -Webb to Broadwell Ave $1,000 $1,000 M310- 498 S. Locust -Illumination Lighting S. City Limits tol-80 $1,000 $1,IX)0 M310- 521 Swift Road - WWTP to Sha Bend Rd $450 $450 M310- 352 Hwy 30 -Hwy 281 to west City Limits - NDOR P 'ect $9,449 $7,559 $1,890 Street Resurfacin M310- 542 Annual Resurfadn P ram 2011) $500 $500 Draina e $ Flood Control M310- 543 Annual MaJor Drainage Development 2011 $500 $500 M310- 544 Concrete Llni of Drain a Ditches 2011 $50 $50 M310- 461 Moores,Prairie, & Silver Creek Flood Control -Construction $780 $420 5380 M310- 525 Detention CeII/Dttch Restoration 550 $50 Other M310- 385 Geographic Information System (Continued develo M and maintenance S25 525 M310- 416 BLDG Im rovements at West Yard $375 $375 M310- 526 Hike/Bike Trail Const. along Floodway - S. Locust to Platte RNer $600 $480 $120 M310- 527 Misc. Safety Enhancements $150 $150 TOTALS 515,679 58,459 So 53,640 53,580 Page 5 of 6 1 2012 and After Construction _ All costs in $1,000s) No. Project Description Total Project State Federal Other City STP City G.O. i3ond City Cap. Impr. Fund Street Construction M310- Annual Pavi Petition ram 2012 $750 $750 M310- 520 Ca ital Ave - Broadwell ~ St. Paul Road $1,000 $1,000 M310- 499 Grade Separation Broadwell ~ UPRR $12,000 $600 $11,400 M310- 502 East B SS Grade Se ration UPRR $16,000 $15,200 M310- 411 Hwy 34 -Locust to Hwy 281 - NDOR P ed $6,679 $5343 $1,336 Street Resurfacing M310- Annual Resurfaan P ram 2012 $500 $500 Draina e 8 Flood Corttroi M310- Annual MaJor Drainage Development 2012 $500 $500 M310- Concrete Linin of Drain a Ditches 2012 $50 $50 M310- 461 oores,Prairie, & Silver Creek Flood Control -Construction (Due remainder of Project) $4,680 $2,520 $2,160 M310- 525 Detention CelUDitch Restoration 550 550 Other M310- 385 Geographic Information System (Continued develo nt and maintenance $25 $25 M310- 416 BLDG Ira rovemerrts at West Yard $375 $375 M310- 527 Misc. Safety Enhancements $150 $150 TOTALS 542,759 $9,263 $0 $29,686 53,810 I~