08/08/2006 Resolutions 2006-221
I
I
RES 0 L UTI 0 N 2006-221
WHEREAS, on May 2, 2006, by Resolution 2006-151, the City of Grand Island
awarded a bid in the total amount of $7,406,080.00 (including alternate bids 2 and 3) for the
construction of a Law Enforcement Center to Chief Construction Company of Grand Island,
Nebraska; and
WHEREAS, included in the $7,406,080 bid was a construction contingency of
$150,000; and
WHEREAS, on July 11, 2006, by Resolution 2006-194, the City of Grand Island
approved Change Order No.1 to allow the use of aluminum instead of copper for the electrical
feeder conductors for the project for a savings to the City of$7,605.00, increasing the construction
contingency to $157,605.00; and
WHEREAS, at this time it is necessary to correct a discrepancy between the
architectural and structural drawings for the proj ect with respect to the use of 16 gauge studs rather
than 20 gauge studs for the lobby walls of the facility; and
WHEREAS, such change has been incorporated into Change Order No.2, and will
result in an expense in the amount of$2,526.30, leaving a balance of$155,078. 70 in the construction
contingency.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF
THE CITY OF GRAND ISLAND, NEBRASKA, that the Mayor be, and hereby is, authorized and
directed to execute Change Order No.2 for the construction of the Law Enforcement Center to
correct the discrepancy between the architectural and structural drawings for the proj ect with respect
to the use of 16 gauge studs rather than 20 gauge studs for the lobby walls of the facility.
Adopted by the City Council of the City of Grand Island, Nebraska, August 8, 2006.
l.
Attest:
~J\(lL ffiw~
RaNae Edwards, City Clerk
Approved as to Form "
August 3, 2006