06/27/2006 Resolutions 2006-180
I
I
RES 0 L UTI 0 N 2006-180
WHEREAS, on May 24,2005, by Resolution 2005-153, the City of Grand Island
awarded a bid in the amount of$1,879,400 forUV Disinfection System (Project 2004-WWTP-1) to
the Starostka Group Unlimited, Inc. of Grand Island, Nebraska; and
WHEREAS, modifications to such contract are necessary and have been incorporated
into Change Order No.1; and
WHEREAS, the result of such modifications will increase the contract amount by
$1,976.75 for a revised contract price of$1,881,376.75; and
WHEREAS, the contract required the project to be completed within 365 days,
however weather conditions throughout the contract period impacted the ability of the Starostka
Group Unlimited, Inc. to complete the project as scheduled; and
WHEREAS, the Starostka Group Unlimited, Inc. is requesting an additional 13 days
to complete such project due to weather delays; and
WHEREAS, one more day is also being requested to complete the installation of a
concrete beam which is being added to the contract pursuant to Change Order No.1; and
WHEREAS, such contract extension is reasonable and acceptable.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF
THE CITY OF GRAND ISLAND, NEBRASKA, that the Mayor be, and hereby is, authorized and
directed to execute Change Order No. 1 between the City of Grand Island and the Starostka Group
Unlimited, Inc. of Grand Island, Nebraska to provide the modifications set out as follows:
Modify drain piping at manhole............. ............ ....................... ....... .......... ............ ........... ............... 3,111.65
Modify Drawing 25-E-l re: electrical equipment.... ......................................................... ............... 4,045.70
Modify pilasters on sketch CO 1-1 and CO 1-2 .................................................................................... 280.00
Add concrete beam at Parshall Flume Stairs....................................................................................... 750.00
Modify finger weir system .............................. ........................ .......... .............................................. (2,702.87)
Modify roof per RFI #22........ ............................... ............................ ............. ........... ...................... (2,072.73)
Modify Drawing 1 0-AS-6 re: windows on west elevation ................................................................. (650.00)
Use of owner-furnished material for brick veneer........ .............. ............. ...... ........................ ............. (275.00)
Delete staff gauges per Specification section 11282 2.7.C ................................................................ (250.00)
Modify Drawing 1 O-M -1 re: routing of roof drain ............................................................................. (260.00)
Approved as to Form
June 22. 2006
J:l '
..
0..--'.. <..::.
I
I
BE IT FURTHER RESOLVED, that such contract is hereby extended for an
additional 14 days.
Adopted by the City Council of the City of Grand Island, Nebraska, June 27,2006.
~~~
Attest:
QS\.M- <CQ ~
RaNae Edwards, City Clerk
- 2 -
.,ll!!!!
-+j~--
..,